Data center facility

Microsoft Cheyenne Highlands (Southeast) Expansion

Microsoft · Cheyenne. Every figure below is individually sourced and dated.


Part of the tracked campus Microsoft Cheyenne Data Center Campus.

The story of Microsoft Cheyenne Highlands (Southeast) Expansioninherited from campus Microsoft Cheyenne Data Center Campus
Announced capex
$68M
Jobs
320 permanent reported
Derived
Cost per job
$213K per permanent job

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterWyoming(26)

The deal

Inherited from campus Microsoft Cheyenne Data Center Campus.

utility
Black Hills Energy · Large Power Contract Service (LPCS) tariff; Microsoft covers infrastructure upgrade costs
operator
Microsoft

Financial structure

Inherited from campus Microsoft Cheyenne Data Center Campus.

Off-site infrastructure improvements
$68M. Completed and future off-site infrastructure improvements associated with Cheyenne datacenter operations. press release

Investment, workforce and specs

Inherited from campus Microsoft Cheyenne Data Center Campus.

Construction jobs
2,000 source
Permanent jobs
320 source

Power

Inherited from campus Microsoft Cheyenne Data Center Campus. Live grid demand and drought overlay only render on the campus page.

Power source
grid
Grid operator
WECC
Interconnection
Water
Direct evaporative cooling uses water less than 10% of the year; Microsoft commits to replenish an estimated 566M gallons of water. Served by Black Hills Energy under Large Power Contract Service (LPCS) tariff.

Facility record

planned

Status

hyperscale

Type

Microsoft

Operator

Cheyenne

Location

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • record: Microsoft Cheyenne Highlands (Southeast) Expansion (reported) · source
  • status: planned (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Microsoft Cheyenne Highlands (Southeast) Expansion?
Microsoft Cheyenne Highlands (Southeast) Expansion is a data center facility record on the DEPLOY registry, in Cheyenne. Every fact on the record is individually sourced and dated.
Who operates Microsoft Cheyenne Highlands (Southeast) Expansion?
Microsoft operates Microsoft Cheyenne Highlands (Southeast) Expansion, per the sourced record on the DEPLOY registry.
Is Microsoft Cheyenne Highlands (Southeast) Expansion operating?
Microsoft Cheyenne Highlands (Southeast) Expansion is recorded as planned on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Microsoft Cheyenne Highlands (Southeast) Expansion?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Microsoft Cheyenne Highlands (Southeast) Expansion on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Microsoft Cheyenne Highlands (Southeast) Expansion: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/microsoft-cheyenne-wy-highlands-expansion

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces