Data center facility
Beaver Dam Data Center
Meta · Beaver Dam · 8715-8773 County Road A, Beaver Dam, WI. Every figure below is individually sourced and dated.
Part of the tracked campus Meta Beaver Dam Data Center.
- Announced capex
- $1B
- Jobs
- 100 permanent reported
- Cooling
- Dry (waterless) cooling
- Cost per MW
- $5M/MW
- Cost per job
- $10M per permanent job
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterWisconsin(43)
The deal
Inherited from campus Meta Beaver Dam Data Center.
- utility
- Alliant Energy · PSC-approved 10-year service contract; Meta funds ~$200M transmission/substations
- operator
- Meta Platforms
Financial structure
Inherited from campus Meta Beaver Dam Data Center.
- Meta campus investment
- $1B. $1 billion+ AI-optimized data center campus (>700,000 sq ft) in Beaver Dam Commerce Park. press release
- Meta energy infrastructure commitment
- $200M. ~$200M toward energy infrastructure per Alliant announcement. press release
Investment, workforce and specs
Inherited from campus Meta Beaver Dam Data Center.
Power
Inherited from campus Meta Beaver Dam Data Center. Live grid demand and drought overlay only render on the campus page.
- Power source
- grid
- Grid operator
- MISO
- Interconnection
- Water
- Dry cooling; Meta states no water demand for cooling once operational, with water restoration returning 100% of consumed water to local watersheds.
Facility record
On the data center map
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Delivery paceAnnounced Q2 2026 · not yet energized
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones inherited from campus Meta Beaver Dam Data Center. How we source and verify it: satellite construction evidence.
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: under construction
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Beaver Dam Data Center?
Who operates Beaver Dam Data Center?
Is Beaver Dam Data Center operating?
How verified is the data on Beaver Dam Data Center?
Deploy Watch
Track Beaver Dam Data Center on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Beaver Dam Data Center: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/meta-beaver-dam-wi-data-center
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/meta-beaver-dam-wi-data-center.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/meta-beaver-dam-wi-data-center
- Data documentation: /data
- Query this programmatically: Deploy MCP