DEPLOY

Data center campus

Ubitus Maizuru AI Data Center (Kyoto)

Ubitus Maizuru AI Data Center is a tracked AI data center campus in Maizuru, Kyoto, Japan. Ubitus's planned NVIDIA Blackwell AI data center in Maizuru City, Kyoto (~2.3 hectares), backed by a JPY 17B METI Large-Scale Growth Investment grant and UTokyo IPC investment. Land agreement signed; construction expecte

Announced · Ubitus · Maizuru, Kyoto, Japan


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Ubitus Maizuru AI Data Center (Kyoto) capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Ubitus

Developer

On the data center map

Every tracked data center is on this map, centered on Ubitus Maizuru AI Data Center. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

The deal

chip supplier
NVIDIA · Blackwell (NeoCloud).
operator
Ubitus · Ubitus K.K.

Why here

Ubitus Maizuru AI Data Center is in Maizuru, Kyoto, Japan. This siting summary is composed from the record's held fields, not speculation; see methodology.

Timeline

  1. Aug 2026
    party added
    chip_supplier: NVIDIA
  2. Sep 2026
    Current: Announced

Sources

2a8e6be0-5938-4350-bc26-abffcbf56365 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is Ubitus Maizuru AI Data Center (Kyoto)?
Ubitus Maizuru AI Data Center (Kyoto) is an AI data center campus tracked on the DEPLOY registry, located in Maizuru, Kyoto, Japan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Ubitus Maizuru AI Data Center (Kyoto)?
Ubitus is recorded as a party to Ubitus Maizuru AI Data Center (Kyoto) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Ubitus Maizuru AI Data Center (Kyoto) operating yet?
As of the most recent verification on the DEPLOY registry, Ubitus Maizuru AI Data Center (Kyoto) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Ubitus Maizuru AI Data Center (Kyoto)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Ubitus Maizuru AI Data Center (Kyoto) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Ubitus Maizuru AI Data Center (Kyoto): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/ubitus-maizuru-ai-data-center

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces