Data center campus
Ubitus Maizuru AI Data Center (Kyoto)
Ubitus Maizuru AI Data Center is a tracked AI data center campus in Maizuru, Kyoto, Japan. Ubitus's planned NVIDIA Blackwell AI data center in Maizuru City, Kyoto (~2.3 hectares), backed by a JPY 17B METI Large-Scale Growth Investment grant and UTokyo IPC investment. Land agreement signed; construction expecte
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- METI grant (company-claimed, Dec 2025)
- Selected for a METI growth grant; JPY 17B total investment in Blackwell GPU NeoCloud infrastructure.
- Land agreement (company-claimed, Jan 2026)
- About 2.3 ha in Maizuru, Kyoto; build from 2026, major completion within 2027.
- Design (company-claimed)
- NVIDIA Blackwell GPUs with NeoCloud scheduling; no MW figure published.
- Groundbreaking
- Sep 4 2026
- Phasing (company-claimed)
- Phase 1 data center and core operations; Phase 2 expands capacity; near port and logistics.
- Related AI work (company-claimed)
- GENIAC 405B-parameter LLM project (2024); Chokimaru Maizuru tourism AI guide (2025).
On the data center map
Every tracked data center is on this map, centered on Ubitus Maizuru AI Data Center. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
The deal
- chip supplier
- NVIDIA · Blackwell (NeoCloud).
- operator
- Ubitus · Ubitus K.K.
Why here
Ubitus Maizuru AI Data Center is in Maizuru, Kyoto, Japan. This siting summary is composed from the record's held fields, not speculation; see methodology.
Timeline
- Aug 2026party addedchip_supplier: NVIDIA
- Nov 2026Current: Announced
Sources
- Ubitus Partners with Maizuru City, Kyoto to Launch AI Data Center Project · Ubitus
- Ubitus Receives Major METI Investment Grant (JPY 17 Billion) · Ubitus
- Ubitus Holds Groundbreaking Ceremony for Maizuru AI Data Center, Marking the Start of the Construction Phase
2a8e6be0-5938-4350-bc26-abffcbf56365 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is Ubitus Maizuru AI Data Center (Kyoto)?
Who is building Ubitus Maizuru AI Data Center (Kyoto)?
Is Ubitus Maizuru AI Data Center (Kyoto) operating yet?
How verified is the data on Ubitus Maizuru AI Data Center (Kyoto)?
Deploy Watch
Track Ubitus Maizuru AI Data Center (Kyoto) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Ubitus Maizuru AI Data Center (Kyoto): AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/ubitus-maizuru-ai-data-center
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/ubitus-maizuru-ai-data-center.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/ubitus-maizuru-ai-data-center
- Data documentation: /data
- Query this programmatically: Deploy MCP