DEPLOYDatabase

Data center campus

STT Navi Mumbai Campus (NM1-NM4)

STT Navi Mumbai Campus is a tracked AI data center campus in Navi Mumbai.

Under construction · ST Telemedia Global Data Centres · Navi Mumbai


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
STT Navi Mumbai Campus (NM1-NM4) capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
155 MW at full build: NM1 28, NM2 49, NM3 42, NM4 36 MW

On the data center map

Every tracked data center is on this map, centered on STT Navi Mumbai Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

Power

Power source
grid
Interconnection

Why here

STT Navi Mumbai Campus is in Navi Mumbai. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

22544cbb-ba8e-42d5-82ca-1dc8b6bc8a99 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is STT Navi Mumbai Campus (NM1-NM4)?
STT Navi Mumbai Campus (NM1-NM4) is an AI data center campus tracked on the DEPLOY registry, located in Navi Mumbai. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building STT Navi Mumbai Campus (NM1-NM4)?
ST Telemedia Global Data Centres is recorded as a party to STT Navi Mumbai Campus (NM1-NM4) on the DEPLOY registry. The full party list, with each role, is on the record.
Is STT Navi Mumbai Campus (NM1-NM4) operating yet?
As of the most recent verification on the DEPLOY registry, STT Navi Mumbai Campus (NM1-NM4) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on STT Navi Mumbai Campus (NM1-NM4)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track STT Navi Mumbai Campus (NM1-NM4) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). STT Navi Mumbai Campus (NM1-NM4): AI data center campus record. Retrieved November 12, 2026, from https://registry.deploy.report/datacenters/stt-gdc-stt-navi-mumbai-campus-nm1-nm4

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces