Reliance Jamnagar AI-Enabled Data Centre is an AI data center campus developed by Reliance Industries in Gujarat, Jamnagar. 0.17 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · Reliance Industries · Private land · other · Jamnagar, Gujarat, India
Capacity: announced vs energized
Announced-to-energized gap: 0.17 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2028. 27 months away. Claimed by Reliance Industries Limited (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.17 GW | 2026-06-10 | reported | press release |
| Announced | 3 GW | 2026-06-01 | reported | journalist report |
| Contracted | 0.17 GW | 2026-06-01 | reported | press release |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Reliance Jamnagar AI-Enabled Data Centre. Pan or zoom out to see how close rivals are building.
- Cooling
- desalinated seawater cooling, renewable-powered
- Grid
- other · Renewable supply arranged by contract rather than by queue position: the 168 MW campus is to run on renewable power, with Reliance providing end-to-end services including the renewable supply and network connectivity. The specific sourcing arrangements have not been published.
- Tenant
- Meta Platforms, Inc.
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
The deal
- developer
- Reliance Industries · Single-window provider: design, construction, utilities, renewable power, connectivity, managed operations
- operator
- Reliance Industries
- tenant
- Meta Platforms, Inc. · Leases 168 MW built-to-suit capacity; covers energy and water costs; connected via Project Waterworth subsea cable
- chip supplier
- NVIDIA · Reported Blackwell AI accelerators for broader campus
- utility
- CleanMax · Contracted by Meta for 837 MW of solar and wind across Rajasthan and Karnataka to supply clean energy for its India footprint.
- utility
- Fourth Partner Energy · Contracted by Meta for ~88 MW of additional renewable capacity in India.
Power
- Power source
- mixed
- Grid operator
- other
- Interconnection
- Renewable supply arranged by contract rather than by queue position: the 168 MW campus is to run on renewable power, with Reliance providing end-to-end services including the renewable supply and network connectivity. The specific sourcing arrangements have not been published.
- Water
- Cooled with desalinated seawater from the Gulf of Kutch; Meta covers full cost of energy and water for the leased block.
Why here
Reliance Jamnagar AI-Enabled Data Centre sits on private land in Gujarat, Jamnagar. It connects to the other grid, draws on mixed power, interconnection is Renewable supply arranged by contract rather than by queue position: the 168 MW campus is to run on renewable power, with Reliance providing end-to-end services including the renewable supply and network connectivity. The specific sourcing arrangements have not been published.. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Cooling
- desalinated seawater cooling, renewable-powered source
Timeline
- Aug 2026party addedutility: Fourth Partner Energy
- Sep 2026Current: Announced
Sources
- RIL Media Release: Reliance and Meta to Develop AI-Enabled Data Centre in Jamnagar, Gujarat
- Meta Data Centers: Bringing AI-Enabled Infrastructure to India
- India's Reliance is building massive 3GW data center - report
- Reliance, Meta to develop 168 MW AI data centre powered by renewable energy in Jamnagar · pv magazine India
25bf5c01-cce5-40a8-b6e6-2480d1f09dbd · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Common questions
What is Reliance Jamnagar AI-Enabled Data Centre?
How much power will Reliance Jamnagar AI-Enabled Data Centre use?
Who is building Reliance Jamnagar AI-Enabled Data Centre?
Is Reliance Jamnagar AI-Enabled Data Centre operating yet?
How verified is the data on Reliance Jamnagar AI-Enabled Data Centre?
Deploy Watch
Track Reliance Jamnagar AI-Enabled Data Centre on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Reliance Jamnagar AI-Enabled Data Centre: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/reliance-jamnagar-ai-data-centre
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/reliance-jamnagar-ai-data-centre.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/reliance-jamnagar-ai-data-centre
- Data documentation: /data
- Query this programmatically: Deploy MCP