DEPLOYDatabase

Data center campus

Narvik

Narvik is a tracked AI data center campus in Nordland, Narvik. Listed as an nscale-operated site on the company's data-centers page. No MW disclosed publicly.

Energized · Nscale · Narvik, Nordland, Norway


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Narvik capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Nscale

Developer

Norway

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Plan (company-claimed, Jul 2025)
Kvandal near Narvik: 230 MW, plus 290 MW option; renewable power
Ownership (company-claimed)
50/50 Nscale and Aker JV; about $1B each for initial 20 MW
Offtake (reported, Apr 2026)
Microsoft adds 30,000 Rubin GPUs for 2027 after OpenAI exited Stargate Norway

On the data center map

Every tracked data center is on this map, centered on Narvik. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterNordland(3)

The deal

developer
Nscale

Power

Power source
grid
Interconnection

Why here

Narvik is in Nordland, Narvik. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Sources

3c4b7752-47dc-4cc1-83bd-639b112bbdbc · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Narvik?
Narvik is an AI data center campus tracked on the DEPLOY registry, located in Narvik. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Narvik?
Nscale is recorded as a party to Narvik on the DEPLOY registry. The full party list, with each role, is on the record.
Is Narvik operating yet?
As of the most recent verification on the DEPLOY registry, Narvik is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Narvik?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Narvik on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Narvik: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/nscale-narvik

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces