Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park)
Moro Hub Green Data Center is a tracked AI data center campus in Dubai, UAE. Moro Hub, a subsidiary of Digital DEWA (Dubai Electricity and Water Authority), operates a 100MW+ data center at the Mohammed bin Rashid Al Maktoum Solar Park, inaugurated February 2023 and recognized by Guinness World R
Energized · Moro Hub · other · Dubai, UAE, United Arab Emirates
Capacity: announced vs energized
| Source | ||||
|---|---|---|---|---|
| Energized | 0.10 GW | 2023-02-01 | reported | journalist report |
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Phase 1 (Feb 2023)
- Opened at the Mohammed bin Rashid Solar Park; Guinness: world's largest solar-powered data centre.
- Full build plan (company-claimed)
- 10 phases, 100 MW and 100,000 sq m; Uptime Tier III; fully solar-powered
- Phase 2
- Inaugurated Jan 22 2025
- Operator
- Moro Hub (Data Hub Integrated Solutions), a subsidiary of Digital DEWA
On the data center map
Every tracked data center is on this map, centered on Moro Hub Green Data Center. Pan or zoom out to see how close rivals are building.
The deal
- developer
- Moro Hub · Subsidiary of Digital DEWA
- operator
- Moro Hub
- utility
- Dubai Electricity and Water Authority (DEWA) · Parent utility; supplies 100% solar power from MBR Solar Park
- developer
- Moro Hub
Power
- Power source
- solar storage
- Grid operator
- other
- Interconnection
Mohammed bin Rashid Al Maktoum Solar Park, solar, Energized. DC drawn 100% from DEWA's ~3,000MW solar park
Why here
Moro Hub Green Data Center is in Dubai, UAE. It connects to the other grid, draws on solar storage power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026party addedutility: Dubai Electricity and Water Authority (DEWA)
- Nov 2026Current: Energized
Sources
- Moro Hub launches world's largest solar-powered data center in UAE (w.media)
- Moro Hub DEWA Solar Park Data Center (Baxtel)
- Hamdan bin Mohammed inaugurates the world's largest solar-powered data centre
- Saeed Al Tayer reviews expansion work at the world's largest solar-powered data centre
- Maktoum bin Mohammed inaugurates second phase of Moro Hub Green Data Centre at the Mohammed Bin Rashid Al Maktoum Solar Park
78b5d484-08c3-41ac-8149-852878b4d6da · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park)?
Who is building Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park)?
Is Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park) operating yet?
How verified is the data on Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park)?
Deploy Watch
Track Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Moro Hub Green Data Center (Mohammed bin Rashid Al Maktoum Solar Park): AI data center campus record. Retrieved November 12, 2026, from https://registry.deploy.report/datacenters/moro-hub-green-data-center-dubai
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/moro-hub-green-data-center-dubai.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/moro-hub-green-data-center-dubai
- Data documentation: /data
- Query this programmatically: Deploy MCP