DEPLOY

Data center campus

GMO GPU Cloud Data Center (Fukuoka)

GMO GPU Cloud Data Center is a tracked AI data center campus in Fukuoka, Japan. GMO Internet's GPU cloud data center in Fukuoka (facility environment provided by QTnet), running a TOP500-ranked NVIDIA H200 cluster (96 nodes / 768 GPUs, ~38 PFLOPS LINPACK, #37 worldwide Nov 2024) and, from Dec 2025,

Energized · QTnet · Fukuoka, Japan


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
GMO GPU Cloud Data Center (Fukuoka) capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

QTnet

Developer

On the data center map

Every tracked data center is on this map, centered on GMO GPU Cloud Data Center. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of GMO GPU Cloud Data Center (Fukuoka)
Tenant
Sakana AI

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

The deal

operator
GMO GPU Cloud · GMO Internet's GPU cloud.
developer
QTnet · Provides the Fukuoka facility environment.
chip supplier
NVIDIA · H200 (768 GPUs) + HGX B300.
tenant
Sakana AI · Named customer.

Why here

GMO GPU Cloud Data Center is in Fukuoka, Japan. This siting summary is composed from the record's held fields, not speculation; see methodology.

Timeline

  1. Aug 2026
    party added
    tenant: Sakana AI
  2. Sep 2026
    Current: Energized

Sources

6a9684dc-6d1a-46e2-9333-ec0dc917e81b · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is GMO GPU Cloud Data Center (Fukuoka)?
GMO GPU Cloud Data Center (Fukuoka) is an AI data center campus tracked on the DEPLOY registry, located in Fukuoka, Japan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building GMO GPU Cloud Data Center (Fukuoka)?
QTnet is recorded as a party to GMO GPU Cloud Data Center (Fukuoka) on the DEPLOY registry.
Is GMO GPU Cloud Data Center (Fukuoka) operating yet?
As of the most recent verification on the DEPLOY registry, GMO GPU Cloud Data Center (Fukuoka) is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on GMO GPU Cloud Data Center (Fukuoka)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track GMO GPU Cloud Data Center (Fukuoka) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). GMO GPU Cloud Data Center (Fukuoka): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/gmo-gpu-cloud-fukuoka

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces