DEPLOY

Data center facility

Justified Data Campus

TeraWulf · Hawesville. Every figure below is individually sourced and dated.


In clusterKentucky(35)

Facility record

under construction

Status

crypto hpc

Type

TeraWulf

Operator

Hawesville

Location

401 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 401 critical IT MW contracted (20-year lease with Anthropic); brownfield former aluminum smelter site (claimed) · source
  • record: Justified Data Campus (reported) · source
  • status: Under construction; initial capacity targeted second half 2027 (claimed) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Justified Data Campus?
Justified Data Campus is a data center facility record on the DEPLOY registry, in Hawesville. Every fact on the record is individually sourced and dated.
Who operates Justified Data Campus?
TeraWulf operates Justified Data Campus, per the sourced record on the DEPLOY registry.
Is Justified Data Campus operating?
Justified Data Campus is recorded as under construction on the DEPLOY registry, with 401 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Justified Data Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Justified Data Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Justified Data Campus: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/terawulf-justified-hawesville-ky

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces