Data center facility

EdgeConneX Pickaway County Campus (Ashville)

EdgeConneX · Ashville. Every figure below is individually sourced and dated.


In clusterOhio(141)

Facility record

planned

Status

hyperscale

Type

EdgeConneX

Operator

Ashville

Location

200 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 200 (claimed) · source
  • record: EdgeConneX Pickaway County Campus (Ashville) (reported) · source
  • status: planned; ~680 acres north of SR-752, proposed 1.8GW substation and 200MW gas turbine energy center (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is EdgeConneX Pickaway County Campus (Ashville)?
EdgeConneX Pickaway County Campus (Ashville) is a data center facility record on the DEPLOY registry, in Ashville. Every fact on the record is individually sourced and dated.
Who operates EdgeConneX Pickaway County Campus (Ashville)?
EdgeConneX operates EdgeConneX Pickaway County Campus (Ashville), per the sourced record on the DEPLOY registry.
Is EdgeConneX Pickaway County Campus (Ashville) operating?
EdgeConneX Pickaway County Campus (Ashville) is recorded as planned on the DEPLOY registry, with 200 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on EdgeConneX Pickaway County Campus (Ashville)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track EdgeConneX Pickaway County Campus (Ashville) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). EdgeConneX Pickaway County Campus (Ashville): data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/edgeconnex-ashville-pickaway-oh

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0