DEPLOY

Data center facility

DC BLOX Montgomery Data Center

DC BLOX · Montgomery. Every figure below is individually sourced and dated.


In clusterMontgomery County(6)·Alabama(35)

Facility record

under construction

Status

colocation

Type

DC BLOX

Operator

Montgomery

Location

40 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 5 initial, scalable to 40 (claimed) · source
  • record: DC BLOX Montgomery Data Center (reported) · source
  • status: under construction (build start June 2025); $30M two-building campus, 5MW anchor tenant (claimed) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is DC BLOX Montgomery Data Center?
DC BLOX Montgomery Data Center is a data center facility record on the DEPLOY registry, in Montgomery. Every fact on the record is individually sourced and dated.
Who operates DC BLOX Montgomery Data Center?
DC BLOX operates DC BLOX Montgomery Data Center, per the sourced record on the DEPLOY registry.
Is DC BLOX Montgomery Data Center operating?
DC BLOX Montgomery Data Center is recorded as under construction on the DEPLOY registry, with 40 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on DC BLOX Montgomery Data Center?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track DC BLOX Montgomery Data Center on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). DC BLOX Montgomery Data Center: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/dc-blox-montgomery-interstate-park-al

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces