Digital Edge BOM1 Navi Mumbai is a tracked AI data center campus in Navi Mumbai.

Partially energized · Digital Edge · Navi Mumbai


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Digital Edge BOM1 Navi Mumbai capacity claims
Source

Key facts

0 GW

Energized

Digital Edge

Developer

Navi Mumbai

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
350 MW (350 MW at full 47-acre build; Phase 1 operational)

On the data center map

Every tracked data center is on this map, centered on Digital Edge BOM1 Navi Mumbai. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Digital Edge

Power

Power source
grid
Interconnection

Why here

Digital Edge BOM1 Navi Mumbai is in Navi Mumbai. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

73d5eeb7-d253-4738-b2bc-91aca52d7103 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Digital Edge BOM1 Navi Mumbai?
Digital Edge BOM1 Navi Mumbai is an AI data center campus tracked on the DEPLOY registry, located in Navi Mumbai. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Digital Edge BOM1 Navi Mumbai?
Digital Edge is recorded as a party to Digital Edge BOM1 Navi Mumbai on the DEPLOY registry. The full party list, with each role, is on the record.
Is Digital Edge BOM1 Navi Mumbai operating yet?
As of the most recent verification on the DEPLOY registry, Digital Edge BOM1 Navi Mumbai is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Digital Edge BOM1 Navi Mumbai?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Digital Edge BOM1 Navi Mumbai on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Digital Edge BOM1 Navi Mumbai: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/digital-edge-dc-digital-edge-bom1-navi-mumbai

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces