DEPLOY

Data center campus

CtrlS Bengaluru DC1

CtrlS Bengaluru DC1 is a tracked AI data center campus in Bengaluru.

Energized · CtrlS Datacenters · Bengaluru


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
CtrlS Bengaluru DC1 capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Bengaluru

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
13 MW (13 MW operational, 1,848 racks)

On the data center map

Every tracked data center is on this map, centered on CtrlS Bengaluru DC1. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

Power

Power source
grid
Interconnection

Why here

CtrlS Bengaluru DC1 is in Bengaluru. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

8482e524-da00-4165-be8c-fcaf79f98678 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is CtrlS Bengaluru DC1?
CtrlS Bengaluru DC1 is an AI data center campus tracked on the DEPLOY registry, located in Bengaluru. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building CtrlS Bengaluru DC1?
CtrlS Datacenters is recorded as a party to CtrlS Bengaluru DC1 on the DEPLOY registry. The full party list, with each role, is on the record.
Is CtrlS Bengaluru DC1 operating yet?
As of the most recent verification on the DEPLOY registry, CtrlS Bengaluru DC1 is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on CtrlS Bengaluru DC1?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track CtrlS Bengaluru DC1 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). CtrlS Bengaluru DC1: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/ctrls-datacenters-ctrls-bengaluru-dc1

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces