Data center campus
Hillsboro
Hillsboro is a tracked AI data center campus in Oregon, Washington County. Portland metro
Energized · CoreWeave · Hillsboro, Washington County, Oregon, United States
Capacity: announced vs energized
| Source |
|---|
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.
Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; top 6 shown by default of 7.
Manifest totals: 895,751 sqft. Rolled from the per-building rows above.
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Named tenants
- CoreWeave
On the data center map
Every tracked data center is on this map, centered on Hillsboro. Pan or zoom out to see how close rivals are building.
In clusterWashington County(35)·Oregon(85)
The deal
- developer
- CoreWeave
Power
- Power source
- grid
- Interconnection
County water status: Abnormally dry (D0) in Washington County, week of 2026-09-08 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Hillsboro is in Oregon, Washington County. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Facilities at this campus
- CoreWeave Hillsboro (Flexential)hyperscale
Sources
a1d06a8a-f525-4652-89ac-829f6052705f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Hillsboro?
Who is building Hillsboro?
Is Hillsboro operating yet?
How verified is the data on Hillsboro?
Deploy Watch
Track Hillsboro on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Hillsboro: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/coreweave-hillsboro
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/coreweave-hillsboro.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/coreweave-hillsboro
- Data documentation: /data
- Query this programmatically: Deploy MCP