DEPLOY

Data center campus

Douglasville

Douglasville is a tracked AI data center campus in Georgia, Douglas County. Atlanta metro

Energized · CoreWeave · Douglasville, Douglas County, Georgia, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Douglasville capacity claims
Source

Construction evidence

Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.

2018-06-04Contains modified Copernicus Sentinel data 2018
2020-09-06Contains modified Copernicus Sentinel data 2020
2022-05-09Contains modified Copernicus Sentinel data 2022
2024-05-28Contains modified Copernicus Sentinel data 2024
2025-09-10Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.

Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; 3 on record.

Building 22
Building sqft: 281,590
polygon on record (5 vertices)
Building 35
Building sqft: 258,790
polygon on record (5 vertices)
Building 16
Building sqft: 213,980
polygon on record (7 vertices)

Manifest totals: 754,360 sqft. Rolled from the per-building rows above.

Key facts

energized

Lifecycle

0 GW

Energized

CoreWeave

Developer

1

Facilities tracked

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Named tenants
CoreWeave

On the data center map

Every tracked data center is on this map, centered on Douglasville. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterDouglas County(21)·Georgia(161)

The deal

developer
CoreWeave

Power

Power source
grid
Interconnection

County water status: Abnormally dry (D0) in Douglas County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Douglasville is in Georgia, Douglas County. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Facilities at this campus

Sources

c024dd1c-4dc2-4822-96af-0d75235a8654 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Douglasville?
Douglasville is an AI data center campus tracked on the DEPLOY registry, located in Douglasville. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Douglasville?
CoreWeave is recorded as a party to Douglasville on the DEPLOY registry. The full party list, with each role, is on the record.
Is Douglasville operating yet?
As of the most recent verification on the DEPLOY registry, Douglasville is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Douglasville?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Douglasville on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Douglasville: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/coreweave-douglasville

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces