Data center comparison
Fermi America HyperGrid vs Poolside Project Horizon
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Fermi America HyperGrid | Poolside Project Horizon | |
|---|---|---|
| Announced capacity | 11 GW | 2 GW |
| Energized capacity | 0 GW | 0 GW |
| Announced-to-energized gap | 11 GW | 2 GW |
| Lifecycle | under construction | stalled |
| Developer | Fermi America (Fermi Inc) | Poolside AI |
| Location | Amarillo, Texas, United States | Fort Stockton, Texas, United States |
| Grid | SPP | ERCOT |
| Acreage | not recorded | 568 acres |
On the map
Common questions
Which is bigger, Fermi America HyperGrid or Poolside Project Horizon?
By announced capacity, Fermi America HyperGrid is larger: 11 GW versus 2 GW. Announced figures are claims, not built capacity.
Which is further along, Fermi America HyperGrid or Poolside Project Horizon?
Fermi America HyperGrid is under construction; Poolside Project Horizon is stalled. Energized capacity: 0 GW versus 0 GW. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Fermi America HyperGrid and Poolside Project Horizon?
Fermi America HyperGrid is in Amarillo, Texas, United States; Poolside Project Horizon is in Fort Stockton, Texas, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.