Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.


Side by side

Switch Citadel CampusTensorWave Las Vegas
Announced capacity0.65 GWnot recorded
Energized capacity0.13 GWnot recorded
Announced-to-energized gap0.52 GWnot recorded
Lifecyclepartially energizedenergized
DeveloperSwitch, Inc.TensorWave
LocationMcCarran (Tahoe Reno Industrial Center), Nevada, United StatesLas Vegas, Nevada, United States
GridWECCnot recorded
Acreage2,000 acresnot recorded

On the map

Common questions

Which is further along, Switch Citadel Campus or TensorWave Las Vegas?
Switch Citadel Campus is partially energized; TensorWave Las Vegas is energized. Energized capacity: 0.13 GW versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Switch Citadel Campus and TensorWave Las Vegas?
Switch Citadel Campus is in McCarran (Tahoe Reno Industrial Center), Nevada, United States; TensorWave Las Vegas is in Las Vegas, Nevada, United States. Each record on DEPLOY is sourced and dated.

Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.