Data center comparison
Switch Citadel Campus vs TensorWave Las Vegas
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Switch Citadel Campus | TensorWave Las Vegas | |
|---|---|---|
| Announced capacity | 0.65 GW | not recorded |
| Energized capacity | 0.13 GW | not recorded |
| Announced-to-energized gap | 0.52 GW | not recorded |
| Lifecycle | partially energized | energized |
| Developer | Switch, Inc. | TensorWave |
| Location | McCarran (Tahoe Reno Industrial Center), Nevada, United States | Las Vegas, Nevada, United States |
| Grid | WECC | not recorded |
| Acreage | 2,000 acres | not recorded |
On the map
Common questions
Which is further along, Switch Citadel Campus or TensorWave Las Vegas?
Switch Citadel Campus is partially energized; TensorWave Las Vegas is energized. Energized capacity: 0.13 GW versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Switch Citadel Campus and TensorWave Las Vegas?
Switch Citadel Campus is in McCarran (Tahoe Reno Industrial Center), Nevada, United States; TensorWave Las Vegas is in Las Vegas, Nevada, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.