Data center comparison
Stargate Abilene vs Stargate Norway
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Stargate Abilene | Stargate Norway | |
|---|---|---|
| Announced capacity | 1.20 GW | 0.23 GW |
| Energized capacity | 0.30 GW | 0 GW |
| Announced-to-energized gap | 0.90 GW | 0.23 GW |
| Lifecycle | partially energized | under construction |
| Developer | OpenAI | Nscale |
| Location | Abilene, Texas, United States | Narvik, Nordland, Norway |
| Grid | ERCOT | other |
| Acreage | 875 acres | not recorded |
On the map
Common questions
Which is bigger, Stargate Abilene or Stargate Norway?
By announced capacity, Stargate Abilene is larger: 1.20 GW versus 0.23 GW. Announced figures are claims, not built capacity.
Which is further along, Stargate Abilene or Stargate Norway?
Stargate Abilene is partially energized; Stargate Norway is under construction. Energized capacity: 0.30 GW versus 0 GW. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.