Data center comparison
Meta / BlackRock El Paso AI Data Center Campus vs Meta Talavera de la Reina Data Center Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Meta / BlackRock El Paso AI Data Center Campus | Meta Talavera de la Reina Data Center Campus | |
|---|---|---|
| Announced capacity | 1 GW | 0.25 GW |
| Energized capacity | 0 GW | not recorded |
| Announced-to-energized gap | 1 GW | 0.25 GW |
| Lifecycle | under construction | under construction |
| Developer | Meta Platforms | Meta Platforms |
| Location | El Paso, Texas, United States | Talavera de la Reina, Toledo (Castilla-La Mancha), Spain |
| Grid | WECC | other |
| Acreage | 1,039 acres | not recorded |
On the map
Common questions
Which is bigger, Meta / BlackRock El Paso AI Data Center Campus or Meta Talavera de la Reina Data Center Campus?
By announced capacity, Meta / BlackRock El Paso AI Data Center Campus is larger: 1 GW versus 0.25 GW. Announced figures are claims, not built capacity.
Which is further along, Meta / BlackRock El Paso AI Data Center Campus or Meta Talavera de la Reina Data Center Campus?
Meta / BlackRock El Paso AI Data Center Campus is under construction; Meta Talavera de la Reina Data Center Campus is under construction. Energized capacity: 0 GW versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Meta / BlackRock El Paso AI Data Center Campus and Meta Talavera de la Reina Data Center Campus?
Meta / BlackRock El Paso AI Data Center Campus is in El Paso, Texas, United States; Meta Talavera de la Reina Data Center Campus is in Talavera de la Reina, Toledo (Castilla-La Mancha), Spain. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.