Data center comparison
Meta / BlackRock El Paso AI Data Center Campus vs Meta Hyperion Data Center
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Meta / BlackRock El Paso AI Data Center Campus | Meta Hyperion Data Center | |
|---|---|---|
| Announced capacity | 1 GW | 5 GW |
| Energized capacity | 0 GW | 0 GW |
| Announced-to-energized gap | 1 GW | 5 GW |
| Lifecycle | under construction | under construction |
| Developer | Meta Platforms | Meta Platforms |
| Location | El Paso, Texas, United States | Delhi, Louisiana, United States |
| Grid | WECC | MISO |
| Acreage | 1,039 acres | not recorded |
On the map
Common questions
Which is bigger, Meta / BlackRock El Paso AI Data Center Campus or Meta Hyperion Data Center?
By announced capacity, Meta Hyperion Data Center is larger: 5 GW versus 1 GW. Announced figures are claims, not built capacity.
Which is further along, Meta / BlackRock El Paso AI Data Center Campus or Meta Hyperion Data Center?
Meta / BlackRock El Paso AI Data Center Campus is under construction; Meta Hyperion Data Center is under construction. Energized capacity: 0 GW versus 0 GW. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Meta / BlackRock El Paso AI Data Center Campus and Meta Hyperion Data Center?
Meta / BlackRock El Paso AI Data Center Campus is in El Paso, Texas, United States; Meta Hyperion Data Center is in Delhi, Louisiana, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.