Data center comparison
Meta Beaver Dam Data Center vs Meta Hyperion Data Center
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Meta Beaver Dam Data Center | Meta Hyperion Data Center | |
|---|---|---|
| Announced capacity | 0.22 GW | 5 GW |
| Energized capacity | not recorded | 0 GW |
| Announced-to-energized gap | 0.22 GW | 5 GW |
| Lifecycle | under construction | under construction |
| Developer | Meta Platforms | Meta Platforms |
| Location | Beaver Dam, Wisconsin, United States | Delhi, Louisiana, United States |
| Grid | MISO | MISO |
| Acreage | not recorded | not recorded |
On the map
Common questions
Which is bigger, Meta Beaver Dam Data Center or Meta Hyperion Data Center?
By announced capacity, Meta Hyperion Data Center is larger: 5 GW versus 0.22 GW. Announced figures are claims, not built capacity.
Which is further along, Meta Beaver Dam Data Center or Meta Hyperion Data Center?
Meta Beaver Dam Data Center is under construction; Meta Hyperion Data Center is under construction. Energized capacity: not recorded versus 0 GW. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Meta Beaver Dam Data Center and Meta Hyperion Data Center?
Meta Beaver Dam Data Center is in Beaver Dam, Wisconsin, United States; Meta Hyperion Data Center is in Delhi, Louisiana, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.