Data center comparison
Fermi America HyperGrid vs Sandow Lakes Power / Data Center Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Fermi America HyperGrid | Sandow Lakes Power / Data Center Campus | |
|---|---|---|
| Announced capacity | 11 GW | 1.20 GW |
| Energized capacity | 0 GW | not recorded |
| Announced-to-energized gap | 11 GW | 1.20 GW |
| Lifecycle | under construction | under construction |
| Developer | Fermi America (Fermi Inc) | Sandow Lakes Energy Company |
| Location | Amarillo, Texas, United States | Blue, Texas, United States |
| Grid | SPP | ERCOT |
| Acreage | not recorded | not recorded |
On the map
Common questions
Which is bigger, Fermi America HyperGrid or Sandow Lakes Power / Data Center Campus?
By announced capacity, Fermi America HyperGrid is larger: 11 GW versus 1.20 GW. Announced figures are claims, not built capacity.
Which is further along, Fermi America HyperGrid or Sandow Lakes Power / Data Center Campus?
Fermi America HyperGrid is under construction; Sandow Lakes Power / Data Center Campus is under construction. Energized capacity: 0 GW versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Fermi America HyperGrid and Sandow Lakes Power / Data Center Campus?
Fermi America HyperGrid is in Amarillo, Texas, United States; Sandow Lakes Power / Data Center Campus is in Blue, Texas, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.