Side by side
| US West LAS1 | Switch Citadel Campus | |
|---|---|---|
| Announced capacity | not recorded | 0.65 GW |
| Energized capacity | not recorded | 0.13 GW |
| Announced-to-energized gap | not recorded | 0.52 GW |
| Lifecycle | energized | partially energized |
| Developer | CoreWeave | Switch, Inc. |
| Location | Las Vegas, Nevada, United States | McCarran (Tahoe Reno Industrial Center), Nevada, United States |
| Grid | not recorded | WECC |
| Acreage | not recorded | 2,000 acres |
On the map
Common questions
Which is further along, US West LAS1 or Switch Citadel Campus?
US West LAS1 is energized; Switch Citadel Campus is partially energized. Energized capacity: not recorded versus 0.13 GW. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are US West LAS1 and Switch Citadel Campus?
US West LAS1 is in Las Vegas, Nevada, United States; Switch Citadel Campus is in McCarran (Tahoe Reno Industrial Center), Nevada, United States. Each record on DEPLOY is sourced and dated.