Data center comparison
Cologix Johnstown Campus vs EdgeConneX / PowerConneX New Albany Energy Center
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Cologix Johnstown Campus | EdgeConneX / PowerConneX New Albany Energy Center | |
|---|---|---|
| Announced capacity | 0.80 GW | 0.14 GW |
| Energized capacity | not recorded | not recorded |
| Announced-to-energized gap | 0.80 GW | 0.14 GW |
| Lifecycle | announced | under construction |
| Developer | Cologix | EdgeConneX |
| Location | Johnstown, Ohio, United States | New Albany, Ohio, United States |
| Grid | PJM | PJM |
| Acreage | 154 acres | 48.6 acres |
On the map
Common questions
Which is bigger, Cologix Johnstown Campus or EdgeConneX / PowerConneX New Albany Energy Center?
By announced capacity, Cologix Johnstown Campus is larger: 0.80 GW versus 0.14 GW. Announced figures are claims, not built capacity.
Which is further along, Cologix Johnstown Campus or EdgeConneX / PowerConneX New Albany Energy Center?
Cologix Johnstown Campus is announced; EdgeConneX / PowerConneX New Albany Energy Center is under construction. Energized capacity: not recorded versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Cologix Johnstown Campus and EdgeConneX / PowerConneX New Albany Energy Center?
Cologix Johnstown Campus is in Johnstown, Ohio, United States; EdgeConneX / PowerConneX New Albany Energy Center is in New Albany, Ohio, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.