Grid operator
AI data centers on the ISO-NE grid
Every tracked AI data center campus interconnecting to the ISO-NE grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.
On this grid
Campuses
1
Announced (combined)
0 GW
Energized (combined)
0 GW
Grid demand now
8.5 GW
The New England (ISO-NE) grid is pulling 8.5 GW right now (EIA-930, 2026-09-24 16:00). Announced numbers are claims, not built capacity; see the methodology.
Campuses on this grid
| QuEra Quantum Computing Lab Boston | Boston, Massachusetts, USA | energized | — | — |
See every campus on the national data center map, browse the full campus index, or read the verified-vs-claimed methodology.