Data center comparison
Vantage Data Centers — Frontier vs Vantage Port Washington (Lighthouse) Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Vantage Data Centers — Frontier | Vantage Port Washington (Lighthouse) Campus | |
|---|---|---|
| Announced capacity | 1.40 GW | 0.90 GW |
| Energized capacity | 0 GW | not recorded |
| Announced-to-energized gap | 1.40 GW | 0.90 GW |
| Lifecycle | under construction | under construction |
| Developer | Vantage Data Centers | Vantage Data Centers |
| Location | Albany (Shackelford County), Texas, United States | Port Washington, Wisconsin, United States |
| Grid | ERCOT | MISO |
| Acreage | not recorded | 672 acres |
On the map
Common questions
Which is bigger, Vantage Data Centers — Frontier or Vantage Port Washington (Lighthouse) Campus?
By announced capacity, Vantage Data Centers — Frontier is larger: 1.40 GW versus 0.90 GW. Announced figures are claims, not built capacity.
Which is further along, Vantage Data Centers — Frontier or Vantage Port Washington (Lighthouse) Campus?
Vantage Data Centers — Frontier is under construction; Vantage Port Washington (Lighthouse) Campus is under construction. Energized capacity: 0 GW versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Vantage Data Centers — Frontier and Vantage Port Washington (Lighthouse) Campus?
Vantage Data Centers — Frontier is in Albany (Shackelford County), Texas, United States; Vantage Port Washington (Lighthouse) Campus is in Port Washington, Wisconsin, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.