Data center comparison
Meta Beaver Dam Data Center vs Vantage Port Washington (Lighthouse) Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Meta Beaver Dam Data Center | Vantage Port Washington (Lighthouse) Campus | |
|---|---|---|
| Announced capacity | 0.22 GW | 0.90 GW |
| Energized capacity | not recorded | not recorded |
| Announced-to-energized gap | 0.22 GW | 0.90 GW |
| Lifecycle | under construction | under construction |
| Developer | Meta Platforms | Vantage Data Centers |
| Location | Beaver Dam, Wisconsin, United States | Port Washington, Wisconsin, United States |
| Grid | MISO | MISO |
| Acreage | not recorded | 672 acres |
On the map
Common questions
Which is bigger, Meta Beaver Dam Data Center or Vantage Port Washington (Lighthouse) Campus?
By announced capacity, Vantage Port Washington (Lighthouse) Campus is larger: 0.90 GW versus 0.22 GW. Announced figures are claims, not built capacity.
Which is further along, Meta Beaver Dam Data Center or Vantage Port Washington (Lighthouse) Campus?
Meta Beaver Dam Data Center is under construction; Vantage Port Washington (Lighthouse) Campus is under construction. Energized capacity: not recorded versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Meta Beaver Dam Data Center and Vantage Port Washington (Lighthouse) Campus?
Meta Beaver Dam Data Center is in Beaver Dam, Wisconsin, United States; Vantage Port Washington (Lighthouse) Campus is in Port Washington, Wisconsin, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.