Data center comparison
Polaris Forge 1 Building 2 vs EdgeConneX Cedar Creek Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Polaris Forge 1 Building 2 | EdgeConneX Cedar Creek Campus | |
|---|---|---|
| Announced capacity | not recorded | 0.10 GW |
| Energized capacity | not recorded | not recorded |
| Announced-to-energized gap | not recorded | 0.10 GW |
| Lifecycle | under construction | under construction |
| Developer | CoreWeave | EdgeConneX |
| Location | Ellendale, North Dakota, United States | Cedar Creek, Bastrop, Texas, United States |
| Grid | not recorded | ERCOT |
| Acreage | not recorded | 130 acres |
On the map
Common questions
Which is further along, Polaris Forge 1 Building 2 or EdgeConneX Cedar Creek Campus?
Polaris Forge 1 Building 2 is under construction; EdgeConneX Cedar Creek Campus is under construction. Energized capacity: not recorded versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Polaris Forge 1 Building 2 and EdgeConneX Cedar Creek Campus?
Polaris Forge 1 Building 2 is in Ellendale, North Dakota, United States; EdgeConneX Cedar Creek Campus is in Cedar Creek, Bastrop, Texas, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.