Revision history
Gecko Robotics x US Navy Fleet Inspection revision history
Append-only Arc G field-change log. 2 material events; 2 editorial events. Newest first.
Partnership
Recorded posture
- First recorded event: 2026-03-15
- Last material change: 2026-10-20
- Last editorial change: 2026-10-20
Material events (1)
- 2026-10-20: field_updated on contract_ceiling_usd 71000000 -> 300000000 (source: https://www.geckorobotics.com/news/navy-idiq-expansion) (verified)
Editorial events (1)
- 2026-10-20: field_updated on summary (source: correction:registry-cleanup-2026-10-20)
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /partnerships/gecko-robotics-x-us-navy-fleet-inspection/history.md + REST /v1/partnerships/d2711e87-cec5-4c9b-b54c-d79e6960b9d0/history.