{"id":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","slug":"vantage-frontier-shackelford-county","name":"Vantage Data Centers — Frontier (Shackelford County, TX)","aliases":[],"locationId":"27c61bbc-b9cf-40b0-aee9-0bf2c1972ecd","lat":32.73,"lng":-99.3,"locationPrecision":"city","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":"Not published. Vantage's own campus page describes multiple diverse power feeds and N+1 redundancy across mechanical and electrical systems, and says nothing about ERCOT, substations, on-site generation or an interconnection position for a 1.4 GW campus.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Closed-loop chillers, with no measured figure yet. Vantage says the campus pairs air cooling with liquid-to-liquid cooling on a closed-loop chiller system and targets water use efficiency near zero. That is a design target from the operator, published before the first building opens in the second half of 2026.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Vantage's largest-ever campus: a $25B, 1.4 GW, 1,200-acre / 10-building (3.7M sq ft) AI mega-campus in Shackelford County, TX, unveiled Aug 19, 2025 and confirmed as a Stargate site for OpenAI. Designed for behind-the-meter natural-gas generation (a ~700 MW phase-one microgrid, ~210 generators per TCEQ air registrations) to bypass ERCOT interconnection queues. Construction underway with the first facility targeted for H2 2026; no capacity energized yet.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","title":"Vantage unveils Frontier, a $25B mega-campus in Texas","sourceName":"Vantage Data Centers"},{"url":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/","title":"Vantage breaks ground on Texas gigawatt data center campus for OpenAI","sourceName":"Data Center Dynamics"},{"url":"https://www.constructionowners.com/news/oracle-and-openai-to-power-new-texas-data-center-off-the-grid","title":"New off-grid Texas data center to run on ~700MW natural gas microgrid","sourceName":"Construction Owners"},{"url":"https://www.datacenterfrontier.com/machine-learning/article/55319132/scaling-stargate-openais-five-new-us-data-centers-push-toward-10-gw-ai-infrastructure","title":"Scaling Stargate: OpenAI's five new US data centers","sourceName":"Data Center Frontier"},{"url":"https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx","title":"Shackelford County, Texas Data Center Campus","sourceName":"Vantage Data Centers"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:54.861Z","updatedAt":"2026-08-28T20:03:11.039Z","location":{"id":"27c61bbc-b9cf-40b0-aee9-0bf2c1972ecd","name":"Albany (Shackelford County)","slug":"albany-shackelford-county-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":32.73,"lng":-99.3,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:12:54.478Z","updatedAt":"2026-08-21T17:59:16.953Z"},"parties":[{"id":"2f1a4fa9-22b3-481c-992e-02990f96d116","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","companyId":null,"externalName":"ERCOT","role":"grid_operator","structureNotes":"Texas grid region; campus designed off-grid via on-site gas.","createdAt":"2026-08-17T18:12:59.674Z","company":null},{"id":"567a56e5-e0f8-42c9-a0d3-884164ac657a","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","companyId":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","externalName":"Vantage Data Centers","role":"developer","structureNotes":"Owns and builds the campus; backed by DigitalBridge/Silver Lake.","createdAt":"2026-08-17T18:12:58.152Z","company":{"id":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","name":"Vantage Data Centers","slug":"vantage-data-centers"}},{"id":"887804de-3f1e-4954-8a61-a109cd728a79","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","companyId":"bd3c5b86-a4cf-4655-842d-e32895c87e6b","externalName":"OpenAI","role":"tenant","structureNotes":"Confirmed Stargate site; OpenAI is the anchor tenant.","createdAt":"2026-08-17T18:12:58.905Z","company":{"id":"bd3c5b86-a4cf-4655-842d-e32895c87e6b","name":"OpenAI","slug":"openai"}}],"capacityClaims":[{"id":"76f20d22-19dc-40a0-8827-7e509348c6c7","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","series":"announced","valueGw":1.4,"asOf":"2025-08-19T00:00:00.000Z","sourceUrl":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"1.4 GW across 10 buildings / 3.7M sq ft on 1,200 acres; supports 250kW+ racks with liquid cooling.","createdAt":"2026-08-17T18:12:55.556Z"},{"id":"18f24181-8c64-4596-a452-fd18cfc4b7c3","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","series":"energized","valueGw":0,"asOf":"2026-08-17T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Vantage $25B 1.4 GW Frontier campus (10 buildings) has broken ground and is under construction; first data center scheduled H2 2026, full 1.4 GW by 2028. No building delivered or energized as of mid-August 2026.","createdAt":"2026-08-17T18:33:46.370Z"},{"id":"91cf5b5d-ca62-4696-b000-03e36efba1a7","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","series":"under_construction","valueGw":1.4,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Ground broken; first facility targeted H2 2026, full buildout ~2028. No energized capacity reported yet (honest absence).","createdAt":"2026-08-17T18:12:56.456Z"}],"financialClaims":[{"id":"48d04076-e969-4bf2-a31d-1db93d77169b","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","kind":"capex","label":"Total announced investment in Frontier","valueUsd":"25000000000","capUsd":null,"conditions":null,"asOf":"2025-08-19T00:00:00.000Z","sourceUrl":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/","sourceType":"press_release","evidenceTier":"claimed","createdAt":"2026-08-17T18:12:57.369Z"}],"metricClaims":[{"id":"4eccf8e5-5890-47f5-922b-51971ddcce13","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","metricType":"cooling_type","valueNumeric":null,"valueText":"Closed-loop chiller system, air cooling paired with liquid-to-liquid; operator targets water use efficiency near zero","unit":null,"grantingJurisdiction":null,"asOf":"2025-08-19T00:00:00.000Z","sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx","sourceType":"operator","evidenceTier":"claimed","supersedesId":null,"note":"design target, published before first building delivery","createdAt":"2026-08-28T18:24:40.933Z"}],"powerProjects":[{"id":"bd9a1457-f77e-4f66-a5a2-9b75db9d089b","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","name":"Frontier behind-the-meter natural gas microgrid (phase 1)","type":"gas","capacityGw":0.7,"lifecycleState":"permitted","sourceUrl":"https://www.constructionowners.com/news/oracle-and-openai-to-power-new-texas-data-center-off-the-grid","evidenceTier":"reported","note":"~210 generators, ~700 MW phase-one per TCEQ air-quality registrations; off-grid microgrid to avoid ERCOT queue.","createdAt":"2026-08-17T18:12:56.998Z"}],"facilities":[],"incidents":[],"events":[{"id":"3ade6da8-e8bb-455d-b461-077dec522211","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:cooling_type","occurredAt":"2026-08-28T18:24:41.332Z","createdAt":"2026-08-28T18:24:41.332Z"},{"id":"4523f2fb-b5a3-4b93-9c01-494167b3d036","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"18f24181-8c64-4596-a452-fd18cfc4b7c3","detail":null,"occurredAt":"2026-08-17T18:33:46.672Z","createdAt":"2026-08-17T18:33:46.672Z"},{"id":"3146ae22-6d38-4846-82c8-3962894f129b","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"18f24181-8c64-4596-a452-fd18cfc4b7c3","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:33:46.523Z","createdAt":"2026-08-17T18:33:46.523Z"},{"id":"2f5cb826-9aa5-4b34-bb85-1e45072fa7fb","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: ERCOT","occurredAt":"2026-08-17T18:13:00.047Z","createdAt":"2026-08-17T18:13:00.047Z"},{"id":"ee646af1-2dd8-4818-a8a4-a2a7aec19275","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: OpenAI","occurredAt":"2026-08-17T18:12:59.285Z","createdAt":"2026-08-17T18:12:59.285Z"},{"id":"240f6c2d-0ca2-41dd-90f0-f455c79141f4","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Vantage Data Centers","occurredAt":"2026-08-17T18:12:58.530Z","createdAt":"2026-08-17T18:12:58.530Z"},{"id":"69af7b7b-fad8-429a-b9c8-b31a6de7b5c5","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Total announced investment in Frontier","occurredAt":"2026-08-17T18:12:57.736Z","createdAt":"2026-08-17T18:12:57.736Z"},{"id":"46279fe3-f722-48b6-87b4-8d1f83725ae2","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"1.4","claimId":"91cf5b5d-ca62-4696-b000-03e36efba1a7","detail":null,"occurredAt":"2026-08-17T18:12:56.765Z","createdAt":"2026-08-17T18:12:56.765Z"},{"id":"d2db4471-7572-4e2a-9ad7-a96e14f7f0b1","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"1.4","claimId":"91cf5b5d-ca62-4696-b000-03e36efba1a7","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:12:56.613Z","createdAt":"2026-08-17T18:12:56.613Z"},{"id":"c307a605-8dbf-4c95-8209-19036014989c","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.4","claimId":"76f20d22-19dc-40a0-8827-7e509348c6c7","detail":null,"occurredAt":"2026-08-17T18:12:55.926Z","createdAt":"2026-08-17T18:12:55.926Z"},{"id":"a74c4eee-a123-4be7-8930-ae8f6a12a629","dataCenterId":"438db243-7f68-4021-9f3f-0e6d09ca5fcf","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.4","claimId":"76f20d22-19dc-40a0-8827-7e509348c6c7","detail":"claimed · press_release","occurredAt":"2026-08-17T18:12:55.712Z","createdAt":"2026-08-17T18:12:55.712Z"}],"capacity_picture":{"announced_gw":1.4,"contracted_gw":null,"under_construction_gw":1.4,"energized_gw":0,"announced_minus_energized_gw":1.4,"by_series":{"announced":{"valueGw":1.4,"asOf":"2025-08-19T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/"},"contracted":null,"under_construction":{"valueGw":1.4,"asOf":"2026-01-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/"},"energized":{"valueGw":0,"asOf":"2026-08-17T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Vantage Data Centers — Frontier (Shackelford County, TX)","url":"https://registry.deploy.report/datacenters/vantage-frontier-shackelford-county","geo":{"@type":"GeoCoordinates","latitude":32.73,"longitude":-99.3},"address":{"@type":"PostalAddress","addressLocality":"Albany (Shackelford County)"}}}