{"id":"385f1c8a-eb14-4741-8526-9cab49bac9cb","slug":"switch-citadel-storey-county-nevada","name":"Switch Citadel Campus (Tahoe Reno)","aliases":["Switch Tahoe Reno","The Citadel Campus","Tahoe Reno 1","Rob Roy's Switch"],"locationId":"2e54554b-1d7e-4e3d-b277-8097a82836c2","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"Supplied with reclaimed (treated effluent) water via a 16-mile pipeline from the Truckee Meadows Water Reclamation Facility; Switch states its cooling approach minimizes water dependence.","servingUtility":null,"acreage":2000,"totalBuildingSqft":null,"streetAddress":null,"notes":"Switch's flagship colocation campus in the Tahoe Reno Industrial Center, Storey County. Tahoe Reno 1 (~130 MW) is operational; the campus is marketed at up to 650 MW at full build-out. Switch litigated a multi-year Nevada PUC proceeding to exit NV Energy's monopoly and buy renewable power directly. Switch went private (DigitalBridge/IFM, 2022) so it no longer files with the SEC; the 650 MW total is a company figure and current contracted/energized MW beyond the first building is not publicly itemized. Nevada is not in an RTO (WECC), so no ISO designation applies.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.switch.com/switch-tahoe-reno-data-center-now-open/","date":"2019-01-01","title":"Switch TAHOE RENO Now Open: Largest Data Center Campus in the World","publisher":"Switch"},{"url":"https://www.sec.gov/Archives/edgar/data/0001710583/000171058318000060/switchinvestorpresentati.htm","date":"2018-01-01","title":"Switch, Inc. Form 8-K investor presentation (FY2018)","publisher":"SEC EDGAR"},{"url":"https://www.datacenterknowledge.com/switches-routers/switch-launches-its-first-enormous-reno-data-center","date":"2017-01-01","title":"Switch Launches Its First Enormous Reno Data Center","publisher":"Data Center Knowledge"},{"url":"https://www.datacenterfrontier.com/colocation/article/11427861/switch-will-support-reno-data-center-campus-with-reclaimed-water","title":"Switch Will Support Reno Data Center Campus With Reclaimed Water","sourceName":"Data Center Frontier"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:11.431Z","updatedAt":"2026-08-20T17:26:49.740Z","location":{"id":"2e54554b-1d7e-4e3d-b277-8097a82836c2","name":"McCarran (Tahoe Reno Industrial Center)","slug":"mccarran-tahoe-reno-industrial-center-nevada","kind":"city","parentLocationId":"06c29acd-073c-47f8-91cd-82f02cdaff32","region":"Nevada","lat":null,"lng":null,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:23:11.055Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"09d70a7a-c6aa-4794-be4d-864d1f0ab09e","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","companyId":null,"externalName":"Switch, Inc.","role":"developer","structureNotes":"Founded/led by Rob Roy","createdAt":"2026-08-17T20:23:13.491Z","company":null},{"id":"39479bbe-a3c8-4a50-8435-18c654ed54ea","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","companyId":null,"externalName":"Switch, Inc.","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:23:14.345Z","company":null},{"id":"e6b31370-6ab9-4b4f-b863-04f779e45ba9","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","companyId":null,"externalName":"IFM Investors","role":"financier","structureNotes":"Co-owner alongside DigitalBridge","createdAt":"2026-08-17T20:23:15.866Z","company":null},{"id":"88ceb153-8e85-46f4-b091-1704daf3c6aa","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","companyId":null,"externalName":"NV Energy","role":"utility","structureNotes":"Switch litigated utility exit at Nevada PUC","createdAt":"2026-08-17T20:23:16.616Z","company":null},{"id":"274758bd-8291-4bd6-bc83-8d8c231aeb8b","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","companyId":null,"externalName":"DigitalBridge","role":"financier","structureNotes":"Took Switch private in 2022","createdAt":"2026-08-17T20:23:15.105Z","company":null}],"capacityClaims":[{"id":"6eed45d5-0c24-4e53-8407-a41b8df28d18","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","series":"announced","valueGw":0.65,"asOf":"2019-01-01T00:00:00.000Z","sourceUrl":"https://www.switch.com/switch-tahoe-reno-data-center-now-open/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Company-stated full build-out for the Citadel Campus","createdAt":"2026-08-17T20:23:12.111Z"},{"id":"9b402585-61f4-4449-be39-1534f4504c2b","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","series":"energized","valueGw":0.13,"asOf":"2019-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterknowledge.com/switches-routers/switch-launches-its-first-enormous-reno-data-center","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Tahoe Reno 1 building, ~130 MW / 1.3M sq ft","createdAt":"2026-08-17T20:23:12.945Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"b69907b4-3c45-415f-b572-bb74f2e2ee62","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: NV Energy","occurredAt":"2026-08-17T20:23:16.998Z","createdAt":"2026-08-17T20:23:16.998Z"},{"id":"a9c0c50a-8b17-4580-ba38-f873a3fedf8b","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: IFM Investors","occurredAt":"2026-08-17T20:23:16.243Z","createdAt":"2026-08-17T20:23:16.243Z"},{"id":"dbeecdaf-9ebe-4fa7-8ff6-bbd977db737b","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: DigitalBridge","occurredAt":"2026-08-17T20:23:15.489Z","createdAt":"2026-08-17T20:23:15.489Z"},{"id":"9ebb1474-4d83-40b1-972b-3fbd4e2c6a93","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Switch, Inc.","occurredAt":"2026-08-17T20:23:14.724Z","createdAt":"2026-08-17T20:23:14.724Z"},{"id":"a3939da0-dff7-46ad-adc6-3b7ae5673e27","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Switch, Inc.","occurredAt":"2026-08-17T20:23:13.947Z","createdAt":"2026-08-17T20:23:13.947Z"},{"id":"03970f50-e0c4-4e3b-a7d0-c54ab86142f4","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.13","claimId":"9b402585-61f4-4449-be39-1534f4504c2b","detail":null,"occurredAt":"2026-08-17T20:23:13.262Z","createdAt":"2026-08-17T20:23:13.262Z"},{"id":"1e879841-faac-4913-95a2-59920335e45a","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.13","claimId":"9b402585-61f4-4449-be39-1534f4504c2b","detail":"reported · journalist_report","occurredAt":"2026-08-17T20:23:13.107Z","createdAt":"2026-08-17T20:23:13.107Z"},{"id":"1e9c958b-ee85-47b5-b5fc-84aa2817870d","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.65","claimId":"6eed45d5-0c24-4e53-8407-a41b8df28d18","detail":null,"occurredAt":"2026-08-17T20:23:12.411Z","createdAt":"2026-08-17T20:23:12.411Z"},{"id":"13a8103b-364b-4094-99df-e2006b6bcee0","dataCenterId":"385f1c8a-eb14-4741-8526-9cab49bac9cb","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.65","claimId":"6eed45d5-0c24-4e53-8407-a41b8df28d18","detail":"claimed · press_release","occurredAt":"2026-08-17T20:23:12.262Z","createdAt":"2026-08-17T20:23:12.262Z"}],"capacity_picture":{"announced_gw":0.65,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.13,"announced_minus_energized_gw":0.52,"by_series":{"announced":{"valueGw":0.65,"asOf":"2019-01-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.switch.com/switch-tahoe-reno-data-center-now-open/"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.13,"asOf":"2019-01-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterknowledge.com/switches-routers/switch-launches-its-first-enormous-reno-data-center"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Switch Citadel Campus (Tahoe Reno)","url":"https://registry.deploy.report/datacenters/switch-citadel-storey-county-nevada","address":{"@type":"PostalAddress","addressLocality":"McCarran (Tahoe Reno Industrial Center)"}}}