{"id":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","slug":"sandow-lakes-lee-county-texas","name":"Sandow Lakes Power / Data Center Campus","aliases":["Sandow Lakes Energy","SLEC"],"locationId":"d3cffef4-74af-4a4f-ba06-b762adcc0b24","lat":null,"lng":null,"locationPrecision":null,"landStatus":"former_industrial","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"TCEQ issued a 1.2 GW gas power-plant air permit (Oct 2025) at Sandow Lakes Ranch near Blue in Lee County, ~50 miles east of Austin, on the former Alcoa smelter site, to power on-site data-center development; Gemma Power Systems (Argan) received notice to proceed on EPC. Named data-center tenants are not disclosed; a resident air-permit challenge was denied.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.energytech.com/home/article/55280902/rural-texas-county-welcoming-12-gw-gas-fired-project-to-seek-data-center-development","date":"2026-02-10","title":"Rural Texas County Welcoming 1.2-GW Gas-Fired Project to Seek Data Center Development","publisher":"Energy Tech"},{"url":"https://www.texastribune.org/2026/02/02/texas-permian-basin-power-plant-project-data-centers/","date":"2026-02-02","title":"Huge Texas data centers will get their own gas power plants","publisher":"Texas Tribune"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:41.219Z","updatedAt":"2026-08-17T20:25:58.718Z","location":{"id":"d3cffef4-74af-4a4f-ba06-b762adcc0b24","name":"Blue","slug":"blue-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":33.9964854,"lng":-96.229987,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:23:40.835Z","updatedAt":"2026-08-21T18:00:06.047Z"},"parties":[{"id":"a3fb0d1e-0959-4672-913f-9356560c69d7","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","companyId":null,"externalName":"Sandow Lakes Energy Company","role":"developer","structureNotes":"Owns power plant via subsidiary","createdAt":"2026-08-17T20:23:42.894Z","company":null},{"id":"cbe3ccd1-3776-4b06-96b2-f1c4105ce463","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","companyId":null,"externalName":"Gemma Power Systems (Argan Inc.)","role":"operator","structureNotes":"EPC contractor","createdAt":"2026-08-17T20:23:43.656Z","company":null},{"id":"533d9690-8bed-4087-86a0-7e1eab4be963","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","companyId":"e7d59434-cc22-4392-bfb2-817f64b171b5","externalName":null,"role":"construction","structureNotes":"Turbine supplier: two SGT6-9000HL hydrogen-capable natural-gas turbines.","createdAt":"2026-08-19T00:29:16.228Z","company":{"id":"e7d59434-cc22-4392-bfb2-817f64b171b5","name":"Siemens Energy","slug":"siemens-energy"}}],"capacityClaims":[{"id":"d0c44336-325f-4baa-a56a-66fdfb2d3c92","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","series":"announced","valueGw":1.2,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://www.energytech.com/home/article/55280902/rural-texas-county-welcoming-12-gw-gas-fired-project-to-seek-data-center-development","sourceType":"permit","evidenceTier":"reported","supersedesId":null,"note":"1.2 GW gas plant to serve on-site data-center development; data-center MW not separately stated","createdAt":"2026-08-17T20:23:41.932Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[{"id":"531a1682-154b-422c-b5d6-7e5fc4b4016b","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","name":"Sandow Lakes Power Plant","type":"gas","capacityGw":1.2,"lifecycleState":"under_construction","sourceUrl":"https://www.energytech.com/home/article/55280902/rural-texas-county-welcoming-12-gw-gas-fired-project-to-seek-data-center-development","evidenceTier":"verified","note":"TCEQ air permit issued Oct 2025; Gemma/Argan NTP","createdAt":"2026-08-17T20:23:42.476Z"}],"facilities":[],"incidents":[],"events":[{"id":"e39b0e87-8dcc-4e9a-8345-6ff9922b602f","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: e7d59434-cc22-4392-bfb2-817f64b171b5","occurredAt":"2026-08-19T00:29:16.611Z","createdAt":"2026-08-19T00:29:16.611Z"},{"id":"6442895b-178e-4b60-89d0-220bef380a4f","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Gemma Power Systems (Argan Inc.)","occurredAt":"2026-08-17T20:23:44.036Z","createdAt":"2026-08-17T20:23:44.036Z"},{"id":"051cc895-1a29-40b4-8e4f-bedf3098d3db","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Sandow Lakes Energy Company","occurredAt":"2026-08-17T20:23:43.273Z","createdAt":"2026-08-17T20:23:43.273Z"},{"id":"4d0465b5-7bd1-450b-ab48-724fd4b22d9c","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.2","claimId":"d0c44336-325f-4baa-a56a-66fdfb2d3c92","detail":null,"occurredAt":"2026-08-17T20:23:42.244Z","createdAt":"2026-08-17T20:23:42.244Z"},{"id":"5690f53f-51c3-4941-99be-00ee90c7fff5","dataCenterId":"b26697a8-cfa3-4c44-9aa4-b37e912d9536","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.2","claimId":"d0c44336-325f-4baa-a56a-66fdfb2d3c92","detail":"reported · permit","occurredAt":"2026-08-17T20:23:42.087Z","createdAt":"2026-08-17T20:23:42.087Z"}],"capacity_picture":{"announced_gw":1.2,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":1.2,"by_series":{"announced":{"valueGw":1.2,"asOf":"2025-10-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.energytech.com/home/article/55280902/rural-texas-county-welcoming-12-gw-gas-fired-project-to-seek-data-center-development"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Sandow Lakes Power / Data Center Campus","url":"https://registry.deploy.report/datacenters/sandow-lakes-lee-county-texas","address":{"@type":"PostalAddress","addressLocality":"Blue"}}}