{"id":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","slug":"meta-social-circle-newton-georgia","name":"Meta Social Circle / Stanton Springs Data Center","aliases":["Morning Hornet LLC","Meta Stanton Springs","Meta Newton"],"locationId":"e3578ee4-7617-4ce3-bb63-9365c8b265cd","lat":33.6008,"lng":-83.7019,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"other","waterSourceNotes":"Served within Southern Company / Walton EMC territory (Southern Company is the balancing authority; not an RTO/ISO).","servingUtility":null,"acreage":628,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta campus (owning entity 'Morning Hornet, LLC') near Stanton Springs, Walton County, adjacent to Newton County; operational with active expansion. Interconnection trackers list 250+ MW; some trackers cite ~435 MW for the expanded footprint. Social Circle officials advanced a second data-center rezoning. Whether the site straddles the Walton/Newton line, the specific EPD air-permit ID, and confirmed final MW (250+ vs 435) are unknown.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.interconnection.fyi/data-center/project/meta-3274a316","date":"2023-01-01","title":"Meta data center — Walton County (interconnection tracker)","publisher":"interconnection.fyi"},{"url":"https://news.monroelocal.org/social-circle-officials-clear-way-for-second-data-center/","date":"2025-01-01","title":"Social Circle officials clear way for second data center","publisher":"Monroe Local"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:36.953Z","updatedAt":"2026-08-29T17:40:04.854Z","location":{"id":"e3578ee4-7617-4ce3-bb63-9365c8b265cd","name":"Social Circle","slug":"social-circle-georgia","kind":"city","parentLocationId":"14b27a03-ca7f-41a4-9381-d78373a48ff0","region":"Georgia","lat":33.66,"lng":-83.72,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:21:36.569Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"6ce19dce-bdf7-4f36-a9bd-e73d5a239f9e","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","companyId":null,"externalName":"Walton EMC / Southern Company","role":"utility","structureNotes":"renewable interconnection partnership","createdAt":"2026-08-17T20:21:38.963Z","company":null},{"id":"21cbd54b-6db4-40c2-992f-4293872ed71f","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","companyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","externalName":"Meta Platforms","role":"operator","structureNotes":"Morning Hornet, LLC","createdAt":"2026-08-17T20:21:38.209Z","company":{"id":"a9a34db8-5719-4789-b681-7ba6643a92b2","name":"Meta Platforms","slug":"meta-platforms"}}],"capacityClaims":[{"id":"7c032dd0-6baf-4000-ad9f-4ed193e42db9","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","series":"announced","valueGw":0.25,"asOf":"2023-06-01T00:00:00.000Z","sourceUrl":"https://www.interconnection.fyi/data-center/project/meta-3274a316","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Interconnection tracker lists 250+ MW; some trackers cite ~435 MW for the expansion. Multi-phase campus ~2M sq ft. Meta operates as Morning Hornet LLC (formerly Baymare LLC).","createdAt":"2026-08-19T00:14:20.876Z"}],"financialClaims":[],"metricClaims":[{"id":"6649d450-c699-43fe-803a-1a0ec9b8b808","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","metricType":"capex_usd","valueNumeric":1500000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-georgia-stanton-springs","createdAt":"2026-08-18T13:51:46.330Z"},{"id":"6d7d5eb8-18b5-4484-b0dd-a2aa4bfaa5ef","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","metricType":"jobs_construction","valueNumeric":1300,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-georgia-stanton-springs","createdAt":"2026-08-18T13:51:47.103Z"},{"id":"775b0608-91e7-4dbb-8f2a-a8d1919fa959","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","metricType":"jobs_permanent","valueNumeric":400,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-georgia-stanton-springs","createdAt":"2026-08-18T13:51:47.864Z"}],"powerProjects":[],"facilities":[{"slug":"meta-social-circle-walton-county-ga","name":"Meta Social Circle Campus","status":"under_construction","criticalItMw":null,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"ac6d133f-e6d3-46ff-bb2e-ef50e6ce8f40","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.25","claimId":"7c032dd0-6baf-4000-ad9f-4ed193e42db9","detail":null,"occurredAt":"2026-08-19T00:14:21.178Z","createdAt":"2026-08-19T00:14:21.178Z"},{"id":"02e364ad-114f-464e-ba18-f746ef360cb8","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.25","claimId":"7c032dd0-6baf-4000-ad9f-4ed193e42db9","detail":"claimed · tracker","occurredAt":"2026-08-19T00:14:21.027Z","createdAt":"2026-08-19T00:14:21.027Z"},{"id":"a8262993-b8b3-406b-80ed-f6a0f3dd0805","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Walton EMC / Southern Company","occurredAt":"2026-08-17T20:21:39.342Z","createdAt":"2026-08-17T20:21:39.342Z"},{"id":"13c2145e-24f0-41e4-a263-854fd0ea52ae","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Meta Platforms","occurredAt":"2026-08-17T20:21:38.584Z","createdAt":"2026-08-17T20:21:38.584Z"},{"id":"3b20b166-5cd1-4de1-a1b5-1760bea8794e","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.25","claimId":"41277c20-8910-4263-aaa4-12fad24038d9","detail":null,"occurredAt":"2026-08-17T20:21:37.972Z","createdAt":"2026-08-17T20:21:37.972Z"},{"id":"f43048d4-1c7c-4103-a10b-8fb51957618e","dataCenterId":"1302fd35-e06f-4ee2-9fa8-0fc870ca71a7","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.25","claimId":"41277c20-8910-4263-aaa4-12fad24038d9","detail":"reported · utility_filing","occurredAt":"2026-08-17T20:21:37.809Z","createdAt":"2026-08-17T20:21:37.809Z"}],"capacity_picture":{"announced_gw":0.25,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.25,"by_series":{"announced":{"valueGw":0.25,"asOf":"2023-06-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.interconnection.fyi/data-center/project/meta-3274a316"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta Social Circle / Stanton Springs Data Center","url":"https://registry.deploy.report/datacenters/meta-social-circle-newton-georgia","geo":{"@type":"GeoCoordinates","latitude":33.6008,"longitude":-83.7019},"address":{"@type":"PostalAddress","addressLocality":"Social Circle"}}}