{"id":"862aafbc-2b12-4754-90c0-23933b2ab1f4","slug":"meta-beaver-dam-wisconsin","name":"Meta Beaver Dam Data Center","aliases":[],"locationId":"2ad071ab-dee7-4bf0-9edf-ff5006376498","lat":43.43,"lng":-88.79,"locationPrecision":"city","landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"MISO","waterSourceNotes":"Dry cooling; Meta states no water demand for cooling once operational, with water restoration returning 100% of consumed water to local watersheds.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta $1B+ campus (>700,000 sq ft) in Alliant Energy's Beaver Dam Commerce Park, Dodge County; up to 220 MW per newly unredacted portions of an Alliant service contract. PSC of Wisconsin approved a one-off 10-year Alliant-Meta service contract (~May 2026) while criticizing Meta's 'black box' transparency; MISO awarded the serving line to ATC. Building count and final energized MW not confirmed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://wisconsinwatch.org/2026/05/psc-approves-alliant-meta-data-center-power-deal-while-criticizing-black-box-approach/","date":"2026-05-07","title":"PSC approves Alliant-Meta data center power deal while criticizing 'black box' approach","publisher":"Wisconsin Watch"},{"url":"https://www.wisbusiness.com/2026/new-details-revealed-for-metas-beaver-dam-data-center/","date":"2026-05-01","title":"New details revealed for Meta's Beaver Dam data center","publisher":"WisBusiness"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:25.877Z","updatedAt":"2026-08-28T14:22:23.889Z","location":{"id":"2ad071ab-dee7-4bf0-9edf-ff5006376498","name":"Beaver Dam","slug":"beaver-dam-wisconsin","kind":"city","parentLocationId":"977b5374-34d6-4ea6-b3b1-de69931acac7","region":"Wisconsin","lat":43.43,"lng":-88.79,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:21:25.484Z","updatedAt":"2026-08-21T17:59:49.105Z"},"parties":[{"id":"c2bb13eb-3589-4145-8ab3-2df46108d130","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","companyId":null,"externalName":"Alliant Energy","role":"utility","structureNotes":"PSC-approved 10-year service contract; Meta funds ~$200M transmission/substations","createdAt":"2026-08-17T20:21:27.931Z","company":null},{"id":"a16b4b89-d10e-4c8a-a588-6984787f4191","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","companyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","externalName":"Meta Platforms","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:21:27.158Z","company":{"id":"a9a34db8-5719-4789-b681-7ba6643a92b2","name":"Meta Platforms","slug":"meta-platforms"}}],"capacityClaims":[{"id":"a710f2c8-cfb6-4e69-a119-85a29d9e600e","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","series":"announced","valueGw":0.22,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.wpr.org/news/wisconsin-regulators-approve-rates-for-metas-beaver-dam-data-center-with-sharp-criticism","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Up to 220 MW peak per newly unredacted portions of Alliant Energy service contract; PSC of Wisconsin approved the rates.","createdAt":"2026-08-19T01:34:07.857Z"},{"id":"a0d2f9ae-2f7a-48b2-8412-f59aaf239e30","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","series":"contracted","valueGw":0.22,"asOf":"2026-05-07T00:00:00.000Z","sourceUrl":"https://www.wisbusiness.com/2026/new-details-revealed-for-metas-beaver-dam-data-center/","sourceType":"utility_filing","evidenceTier":"verified","supersedesId":null,"note":"up to 220 MW per unredacted Alliant service contract","createdAt":"2026-08-17T20:21:26.621Z"}],"financialClaims":[{"id":"1741dea8-0e40-484f-b08b-6d2f81030b28","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","kind":"capex","label":"Meta campus investment","valueUsd":"1000000000","capUsd":null,"conditions":"$1 billion+ AI-optimized data center campus (>700,000 sq ft) in Beaver Dam Commerce Park.","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.alliantenergy.com/news/news-center/2025/11/111225-metabeaverdamannouncement","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-19T01:34:08.391Z"},{"id":"caf3af59-4c13-4f5c-80f1-dc1980963eaf","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","kind":"capex","label":"Meta energy infrastructure commitment","valueUsd":"200000000","capUsd":null,"conditions":"~$200M toward energy infrastructure per Alliant announcement.","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.alliantenergy.com/news/news-center/2025/11/111225-metabeaverdamannouncement","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-19T01:34:09.156Z"}],"metricClaims":[{"id":"6c10a7ff-baaf-4490-8aa1-75fc48aebbe6","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","metricType":"capex_usd","valueNumeric":1000000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/beaver-dam-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-wisconsin-beaver-dam","createdAt":"2026-08-18T13:52:00.240Z"},{"id":"9d101493-7241-4052-a7b8-3aa0ccf24704","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","metricType":"cooling_type","valueNumeric":null,"valueText":"Dry (waterless) cooling","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.alliantenergy.com/news/news-center/2025/11/111225-metabeaverdamannouncement","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:34:10.680Z"},{"id":"b542fcfd-b4c0-43a5-ae3c-1b7fdc753b5d","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","metricType":"jobs_construction","valueNumeric":1000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/beaver-dam-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-wisconsin-beaver-dam","createdAt":"2026-08-18T13:52:01.019Z"},{"id":"d59956e4-8f62-49e8-ad87-30071f4846a6","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","metricType":"jobs_construction","valueNumeric":1000,"valueText":"1,000+ skilled trades at peak construction","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.alliantenergy.com/news/news-center/2025/11/111225-metabeaverdamannouncement","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:34:09.920Z"},{"id":"c016c9b6-6380-4120-9da5-0ea66090892a","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","metricType":"jobs_permanent","valueNumeric":100,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/beaver-dam-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-wisconsin-beaver-dam","createdAt":"2026-08-18T13:52:01.787Z"},{"id":"2b1145c3-c7f0-495a-92c5-437a2cc82f71","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","metricType":"jobs_permanent","valueNumeric":100,"valueText":"100+ operational jobs","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.alliantenergy.com/news/news-center/2025/11/111225-metabeaverdamannouncement","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:34:10.301Z"}],"powerProjects":[],"facilities":[{"slug":"meta-beaver-dam-wi-data-center","name":"Beaver Dam Data Center","status":"under_construction","criticalItMw":null,"facilityType":"hyperscale"},{"slug":"meta-beaver-dam-wi","name":"Meta Beaver Dam Data Center","status":"under_construction","criticalItMw":220,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"a9d82fef-691b-4fd5-9b4b-0ef26ea2a7b5","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Meta energy infrastructure commitment","occurredAt":"2026-08-19T01:34:09.543Z","createdAt":"2026-08-19T01:34:09.543Z"},{"id":"aa74fc72-a551-4dc1-b326-dbd10d9f6fe5","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Meta campus investment","occurredAt":"2026-08-19T01:34:08.773Z","createdAt":"2026-08-19T01:34:08.773Z"},{"id":"bde4bd00-1ecd-4ef3-a033-e2f28199fa91","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.22","claimId":"a710f2c8-cfb6-4e69-a119-85a29d9e600e","detail":null,"occurredAt":"2026-08-19T01:34:08.161Z","createdAt":"2026-08-19T01:34:08.161Z"},{"id":"0e26c2c5-e72e-43f9-9e93-6525d7371029","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.22","claimId":"a710f2c8-cfb6-4e69-a119-85a29d9e600e","detail":"reported · journalist_report","occurredAt":"2026-08-19T01:34:08.011Z","createdAt":"2026-08-19T01:34:08.011Z"},{"id":"2a0ab2a3-5830-4009-a46e-34129756a856","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Alliant Energy","occurredAt":"2026-08-17T20:21:28.314Z","createdAt":"2026-08-17T20:21:28.314Z"},{"id":"d579da30-e133-42cb-ab2d-639b186ac591","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Meta Platforms","occurredAt":"2026-08-17T20:21:27.543Z","createdAt":"2026-08-17T20:21:27.543Z"},{"id":"06c315f5-2151-40e1-bd6a-d9920800a992","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"0.22","claimId":"a0d2f9ae-2f7a-48b2-8412-f59aaf239e30","detail":null,"occurredAt":"2026-08-17T20:21:26.926Z","createdAt":"2026-08-17T20:21:26.926Z"},{"id":"24f6fec9-52b9-4944-a8d0-3934dcdb7032","dataCenterId":"862aafbc-2b12-4754-90c0-23933b2ab1f4","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"0.22","claimId":"a0d2f9ae-2f7a-48b2-8412-f59aaf239e30","detail":"verified · utility_filing","occurredAt":"2026-08-17T20:21:26.773Z","createdAt":"2026-08-17T20:21:26.773Z"}],"capacity_picture":{"announced_gw":0.22,"contracted_gw":0.22,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.22,"by_series":{"announced":{"valueGw":0.22,"asOf":"2026-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.wpr.org/news/wisconsin-regulators-approve-rates-for-metas-beaver-dam-data-center-with-sharp-criticism"},"contracted":{"valueGw":0.22,"asOf":"2026-05-07T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://www.wisbusiness.com/2026/new-details-revealed-for-metas-beaver-dam-data-center/"},"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta Beaver Dam Data Center","url":"https://registry.deploy.report/datacenters/meta-beaver-dam-wisconsin","geo":{"@type":"GeoCoordinates","latitude":43.43,"longitude":-88.79},"address":{"@type":"PostalAddress","addressLocality":"Beaver Dam"}}}