{"id":"ab0100f2-d003-4189-9985-4f10784191fc","slug":"lambda-kansas-city-missouri","name":"Lambda Kansas City AI Factory","aliases":["Lambda KC AI Factory","Lambda Kansas City"],"locationId":"5f98e2a5-8749-4652-bf37-6cc897ad9306","lat":null,"lng":null,"locationPrecision":null,"landStatus":"former_industrial","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"SPP","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Lambda is converting an existing 2009-built facility in Kansas City, Missouri into an AI Factory, launching in early 2026 at 24 MW with potential to scale beyond 100 MW. The initial deployment is described as more than 10,000 Nvidia Blackwell Ultra GPUs.","keyFacts":[{"label":"Initial IT capacity (company-claimed)","value":"24 MW, scalable beyond 100 MW"},{"label":"Initial GPUs (company-claimed)","value":"10,000+ NVIDIA Blackwell Ultra"},{"label":"Facility","value":"Conversion of a 2009-built Kansas City facility; early 2026 launch targeted"},{"label":"Operator","value":"Lambda"}],"reviewStatus":"reviewed","sources":[{"url":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","title":"Lambda: 100 MW AI Factory in Kansas City"},{"url":"https://www.datacenterdynamics.com/en/news/ai-cloud-firm-lambda-targets-data-center-deployment-in-kansas-city-missouri/","title":"DCD: Lambda targets Kansas City data center"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:46.007Z","updatedAt":"2026-10-12T23:55:48.451Z","location":{"id":"5f98e2a5-8749-4652-bf37-6cc897ad9306","name":"Kansas City","slug":"kansas-city-missouri","kind":"city","parentLocationId":"f7e85fa9-2e46-4796-b6b1-fcbc80990a13","region":"Midwest","lat":39.100105,"lng":-94.5781416,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-18T03:21:11.843Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"73385454-ab10-4400-b928-36d06ffc0ede","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","companyId":"858aa4cc-3b67-4481-a21a-d891dc1facd8","externalName":"Lambda","role":"operator","structureNotes":null,"createdAt":"2026-08-19T00:48:50.442Z","company":{"id":"858aa4cc-3b67-4481-a21a-d891dc1facd8","name":"Lambda","slug":"lambda"}},{"id":"d23a2284-90eb-4961-a14c-602e0cf87575","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","companyId":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","externalName":null,"role":"chip_supplier","structureNotes":"Blackwell Ultra GPUs","createdAt":"2026-08-19T01:33:14.884Z","company":{"id":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","name":"NVIDIA","slug":"nvidia"}},{"id":"cd40218d-c943-4c05-add8-da92469b51bd","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","companyId":"858aa4cc-3b67-4481-a21a-d891dc1facd8","externalName":"Lambda","role":"developer","structureNotes":"Owner and operator of the AI Factory","createdAt":"2026-08-19T00:48:49.271Z","company":{"id":"858aa4cc-3b67-4481-a21a-d891dc1facd8","name":"Lambda","slug":"lambda"}}],"capacityClaims":[{"id":"e1d9bd78-e68d-4a0d-bc25-bba77a7fe414","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","series":"announced","valueGw":0.024,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Launches early 2026 at 24 MW","createdAt":"2026-08-19T00:48:47.251Z"},{"id":"27571046-15b8-4c2f-84ce-3580628bcf8d","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","series":"announced","valueGw":0.1,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Potential to scale beyond 100 MW","createdAt":"2026-08-19T00:48:48.136Z"},{"id":"5a5d56cb-c9dc-48e6-bde8-8004bc344b91","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","series":"under_construction","valueGw":0.024,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"Launch at 24 MW in a repurposed 2009-built facility; Lambda sole tenant/operator; >10,000 NVIDIA Blackwell Ultra GPUs, dedicated to a single customer under multi-year agreement.","createdAt":"2026-08-19T01:33:13.220Z"}],"financialClaims":[{"id":"d3a48a8c-d905-402f-b0b9-82a60ca084e1","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","kind":"capex","label":"Announced investment","valueUsd":"500000000","capUsd":null,"conditions":"Approximately $500 million project (more than $500M per Missouri DED)","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.areadevelopment.com/newsItems/11-11-2025/lambda-kansas-city-missouri.shtml","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:33:13.750Z"}],"metricClaims":[{"id":"16869244-4daf-459f-b004-4312343adcfc","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","metricType":"gpu_count","valueNumeric":10000,"valueText":"More than 10,000 Nvidia Blackwell Ultra GPUs at launch","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:48:48.519Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"e4339a4d-09b8-47b9-b9ba-5dc28ed68121","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"party_linked","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: linked externalName \"Lambda\" to company lambda","occurredAt":"2026-08-31T01:15:17.001Z","createdAt":"2026-08-31T01:15:17.001Z"},{"id":"98b7e637-3eb6-48e1-9b77-0734b22af2bf","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"party_linked","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: linked externalName \"Lambda\" to company lambda","occurredAt":"2026-08-31T01:15:16.236Z","createdAt":"2026-08-31T01:15:16.236Z"},{"id":"99b69f00-4af6-4f5f-943f-debf4e79c42c","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: a9609061-00fd-4d9b-9b2d-ce2d772ab825","occurredAt":"2026-08-19T01:33:15.263Z","createdAt":"2026-08-19T01:33:15.263Z"},{"id":"25e2d58d-b39c-4dac-86c7-8a8b5a5d64d9","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Announced investment","occurredAt":"2026-08-19T01:33:14.127Z","createdAt":"2026-08-19T01:33:14.127Z"},{"id":"5fa4072f-0f3a-4fc9-9844-c5a39bb1ac80","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.024","claimId":"5a5d56cb-c9dc-48e6-bde8-8004bc344b91","detail":null,"occurredAt":"2026-08-19T01:33:13.524Z","createdAt":"2026-08-19T01:33:13.524Z"},{"id":"5ff969f9-cb5c-4e17-87ac-2ed3ff007bfd","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.024","claimId":"5a5d56cb-c9dc-48e6-bde8-8004bc344b91","detail":"verified · company_filing","occurredAt":"2026-08-19T01:33:13.375Z","createdAt":"2026-08-19T01:33:13.375Z"},{"id":"6da8d764-45bc-4126-a4e7-0e039bda3e99","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Lambda","occurredAt":"2026-08-19T00:48:50.815Z","createdAt":"2026-08-19T00:48:50.815Z"},{"id":"f8b03e1f-cc2a-4f79-8025-b96b3db8b12a","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Lambda","occurredAt":"2026-08-19T00:48:49.664Z","createdAt":"2026-08-19T00:48:49.664Z"},{"id":"fea4e3b0-b529-4f5a-a5ee-4a7389bc2c22","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.1","claimId":"27571046-15b8-4c2f-84ce-3580628bcf8d","detail":"claimed · press_release","occurredAt":"2026-08-19T00:48:48.291Z","createdAt":"2026-08-19T00:48:48.291Z"},{"id":"dbb19f60-a6e8-44b5-a78b-548f0eca2079","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.024","claimId":"e1d9bd78-e68d-4a0d-bc25-bba77a7fe414","detail":null,"occurredAt":"2026-08-19T00:48:47.602Z","createdAt":"2026-08-19T00:48:47.602Z"},{"id":"0b1d5be5-bc02-4c48-acb4-772a58064296","dataCenterId":"ab0100f2-d003-4189-9985-4f10784191fc","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.024","claimId":"e1d9bd78-e68d-4a0d-bc25-bba77a7fe414","detail":"reported · press_release","occurredAt":"2026-08-19T00:48:47.411Z","createdAt":"2026-08-19T00:48:47.411Z"}],"capacity_picture":{"announced_gw":0.024,"contracted_gw":null,"under_construction_gw":0.024,"energized_gw":null,"announced_minus_energized_gw":0.024,"by_series":{"announced":{"valueGw":0.024,"asOf":"2026-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo"},"contracted":null,"under_construction":{"valueGw":0.024,"asOf":"2026-06-01T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Lambda Kansas City AI Factory","url":"https://registry.deploy.report/datacenters/lambda-kansas-city-missouri","address":{"@type":"PostalAddress","addressLocality":"Kansas City"}}}