{"id":"68549634-6d59-45db-864b-212966f675e3","slug":"humain-saudi-arabia","name":"HUMAIN (Riyadh & Dammam flagship data centers)","aliases":[],"locationId":"dbfe2930-6ef3-4852-83ad-2a138e235a5d","lat":24.7136,"lng":46.6753,"locationPrecision":"city","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"Saudi Electricity Company (SEC)","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"PIF-owned sovereign AI champion (launched May 2025) that broke ground on twin 100MW flagship campuses in Riyadh and Dammam (Eastern Province), with first facilities expected to go live Q2 2026. Riyadh phase 1 uses 18,000 Nvidia GB300 chips, with Nvidia committed to several hundred thousand more (up to ~500MW), plus a $10B AMD deal and a Qualcomm MoU (up to 200MW). Stated roadmap: 1.9GW by 2030 scaling toward 6.6GW; no independently confirmed energized capacity as of Aug 2026.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/","title":"Humain breaks ground two data centers, first facilities expected Q2 2026","sourceName":"Data Center Dynamics"},{"url":"https://www.datacenterdynamics.com/en/news/saudi-arabian-ai-venture-humain-buys-18000-nvidia-gb300-chips-several-hundred-thousand-more-on-the-way/","title":"Saudi AI venture Humain buys 18,000 Nvidia GB300 chips","sourceName":"Data Center Dynamics"},{"url":"https://www.tomshardware.com/pc-components/gpus/nvidia-sending-18-000-ai-gpus-to-saudi-arabias-state-backed-ai-data-centers-in-wake-of-cancelled-export-rules","title":"Nvidia to send 18,000 AI GPUs to Saudi Arabia's state-backed AI data centers","sourceName":"Tom's Hardware"},{"url":"https://www.arabnews.com/node/2630217/business-economy","title":"PIF-backed Humain secures up to $1.2bn to expand AI infrastructure","sourceName":"Arab News"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:59.355Z","updatedAt":"2026-08-28T14:22:23.889Z","location":{"id":"dbfe2930-6ef3-4852-83ad-2a138e235a5d","name":"Riyadh","slug":"riyadh-riyadh-province","kind":"city","parentLocationId":"ebe579ff-086e-424f-bd25-89af910e6ada","region":"Middle East","lat":24.7136,"lng":46.6753,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:11:58.979Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"b83888ee-48a5-43c6-a76e-46f6c6dad480","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","companyId":null,"externalName":"Public Investment Fund (PIF)","role":"financier","structureNotes":"Sole owner / sovereign backer.","createdAt":"2026-08-17T18:12:03.699Z","company":null},{"id":"b0c61f09-907a-45b5-9ebf-77f9adb33add","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","companyId":null,"externalName":"Nvidia, AMD, Qualcomm","role":"chip_supplier","structureNotes":"Nvidia 18,000 GB300 (Riyadh) + hundreds of thousands more; $10B AMD deal; Qualcomm up to 200MW.","createdAt":"2026-08-17T18:12:04.462Z","company":null},{"id":"f243adcd-2724-4c1b-b3e4-065ebff205ec","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","companyId":null,"externalName":"MIS (Middle East Specialized Cables / contractor consortium)","role":"construction","structureNotes":"Awarded HUMAIN AI data center construction project.","createdAt":"2026-08-17T18:12:05.207Z","company":null},{"id":"f0f0e273-62ef-499c-aa50-70122ac81009","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","companyId":"c39dd490-8600-4e60-817d-a5dc1063bdb9","externalName":"HUMAIN","role":"developer","structureNotes":"PIF-owned sovereign AI company, launched May 2025.","createdAt":"2026-08-17T18:12:02.940Z","company":{"id":"c39dd490-8600-4e60-817d-a5dc1063bdb9","name":"HUMAIN","slug":"humain"}}],"capacityClaims":[{"id":"f70a7380-9400-4625-a590-44ee694d6ae3","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","series":"announced","valueGw":1.9,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Roadmap target 1.9GW by 2030, scaling toward 6.6GW long-term.","createdAt":"2026-08-17T18:12:00.022Z"},{"id":"7ea7962c-0a8c-4e70-9c2d-87479f85e3f7","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","series":"energized","valueGw":0,"asOf":"2026-07-31T00:00:00.000Z","sourceUrl":"https://vision2030.ai/analysis/humain-data-centers-riyadh-dammam-status/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"As of July 31 2026 no filing or credible report confirms HUMAIN's Riyadh or Dammam sites (each ~100MW announced) in commercial service; both under construction, original Q2 2026 go-live missed. No operational confirmation.","createdAt":"2026-08-17T18:33:50.559Z"},{"id":"cd1371e0-84b5-4d75-8cf5-c6c3508d9b4e","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","series":"under_construction","valueGw":0.2,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Twin 100MW flagship campuses (Riyadh + Dammam) under construction, go-live expected Q2 2026.","createdAt":"2026-08-17T18:12:00.861Z"}],"financialClaims":[{"id":"8ae5a1af-d7a9-4407-aa03-aa793b829399","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","kind":"backstop","label":"Debt financing framework to develop up to 250MW","valueUsd":"1200000000","capUsd":null,"conditions":"Up to $1.2bn financing framework to fund additional AI data center capacity.","asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.arabnews.com/node/2630217/business-economy","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-17T18:12:02.181Z"},{"id":"1bbbac60-d2a5-432a-b349-08da021b91c3","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","kind":"capex","label":"AMD strategic AI infrastructure deal","valueUsd":"10000000000","capUsd":null,"conditions":"Multi-year AMD compute buildout; may become a JV with AMD equity in a Saudi fund.","asOf":"2025-05-13T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/saudi-arabian-ai-venture-humain-buys-18000-nvidia-gb300-chips-several-hundred-thousand-more-on-the-way/","sourceType":"journalist_report","evidenceTier":"claimed","createdAt":"2026-08-17T18:12:01.414Z"}],"metricClaims":[{"id":"a543cda1-8f52-47cd-a246-e73ef236e3c4","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","metricType":"gpu_count","valueNumeric":18000,"valueText":"18,000 GB300","unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://nvidianews.nvidia.com/news/humain-and-nvidia","sourceType":"press","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-18T21:53:40.261Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"690c3270-be2d-47e3-acb0-9615952b9ad1","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_linked","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: linked externalName \"HUMAIN\" to company humain","occurredAt":"2026-08-31T01:15:07.511Z","createdAt":"2026-08-31T01:15:07.511Z"},{"id":"ffa54bb0-92ff-4ab1-9211-988d54b00c08","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"7ea7962c-0a8c-4e70-9c2d-87479f85e3f7","detail":null,"occurredAt":"2026-08-17T18:33:50.863Z","createdAt":"2026-08-17T18:33:50.863Z"},{"id":"27b98557-214b-4681-b0fb-803f8220d753","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"7ea7962c-0a8c-4e70-9c2d-87479f85e3f7","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:33:50.712Z","createdAt":"2026-08-17T18:33:50.712Z"},{"id":"2eff99f8-3edf-43e5-aad7-12562a68f08c","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: MIS (Middle East Specialized Cables / contractor consortium)","occurredAt":"2026-08-17T18:12:05.592Z","createdAt":"2026-08-17T18:12:05.592Z"},{"id":"d95f28e5-7d17-4fc5-8ae2-daeaa74260cc","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: Nvidia, AMD, Qualcomm","occurredAt":"2026-08-17T18:12:04.832Z","createdAt":"2026-08-17T18:12:04.832Z"},{"id":"2a5d0202-c200-4a10-99cf-7b97c82d3f07","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Public Investment Fund (PIF)","occurredAt":"2026-08-17T18:12:04.081Z","createdAt":"2026-08-17T18:12:04.081Z"},{"id":"c77dfdac-e2ad-4878-85ac-5d0dc3777056","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: HUMAIN","occurredAt":"2026-08-17T18:12:03.315Z","createdAt":"2026-08-17T18:12:03.315Z"},{"id":"a37f4011-7f93-4a8b-94be-91cc3b49e2a4","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"backstop: Debt financing framework to develop up to 250MW","occurredAt":"2026-08-17T18:12:02.557Z","createdAt":"2026-08-17T18:12:02.557Z"},{"id":"fa11888d-b438-4af9-a15e-a59e0cca595b","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: AMD strategic AI infrastructure deal","occurredAt":"2026-08-17T18:12:01.797Z","createdAt":"2026-08-17T18:12:01.797Z"},{"id":"65d605f9-7798-4bf8-99f9-1df3c93a5aac","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.2","claimId":"cd1371e0-84b5-4d75-8cf5-c6c3508d9b4e","detail":null,"occurredAt":"2026-08-17T18:12:01.186Z","createdAt":"2026-08-17T18:12:01.186Z"},{"id":"ccf53f7c-ef6f-4aad-b43e-b67c666d7092","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.2","claimId":"cd1371e0-84b5-4d75-8cf5-c6c3508d9b4e","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:12:01.012Z","createdAt":"2026-08-17T18:12:01.012Z"},{"id":"ed1d1bb6-a95b-4850-93cf-57c3d1eb01dc","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.9","claimId":"f70a7380-9400-4625-a590-44ee694d6ae3","detail":null,"occurredAt":"2026-08-17T18:12:00.328Z","createdAt":"2026-08-17T18:12:00.328Z"},{"id":"4d6d1172-5586-47d8-8a18-5f08d83ce0ba","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.9","claimId":"f70a7380-9400-4625-a590-44ee694d6ae3","detail":"claimed · journalist_report","occurredAt":"2026-08-17T18:12:00.173Z","createdAt":"2026-08-17T18:12:00.173Z"}],"capacity_picture":{"announced_gw":1.9,"contracted_gw":null,"under_construction_gw":0.2,"energized_gw":0,"announced_minus_energized_gw":1.9,"by_series":{"announced":{"valueGw":1.9,"asOf":"2026-01-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"},"contracted":null,"under_construction":{"valueGw":0.2,"asOf":"2026-01-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"},"energized":{"valueGw":0,"asOf":"2026-07-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://vision2030.ai/analysis/humain-data-centers-riyadh-dammam-status/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"HUMAIN (Riyadh & Dammam flagship data centers)","url":"https://registry.deploy.report/datacenters/humain-saudi-arabia","geo":{"@type":"GeoCoordinates","latitude":24.7136,"longitude":46.6753},"address":{"@type":"PostalAddress","addressLocality":"Riyadh"}}}