{"id":"121efb2d-c261-49da-af33-27e6a989a1b1","slug":"google-mesa-redhawk","name":"Google Mesa Data Center (Redhawk)","aliases":["Redhawk","Google Redhawk Mesa"],"locationId":"672b6e97-cace-46c4-a79b-ddd5c5c988d1","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"energized","powerSourceMix":"solar_storage","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"Air-cooled to minimize water consumption given regional water scarcity (Google)","servingUtility":null,"acreage":185,"totalBuildingSqft":null,"streetAddress":null,"notes":"~$600M air-cooled campus; Phase 1 data hall reported operational since July 2025. Google signed an SRP energy agreement for 430+ MW of new carbon-free (wind/solar/storage) capacity from NextEra to serve Arizona operations. The 430 MW is contracted clean-energy supply, not a stated IT/critical-load figure; the campus's own MW capacity is not separately disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://esgnews.com/google-signs-agreement-with-salt-river-project-srp-to-support-more-than-430-carbon-free-megawatts/","date":"2024-03-01","title":"Google signs agreement with SRP to support more than 430 carbon-free megawatts","publisher":"ESG News"},{"url":"https://www.latitudemedia.com/news/in-lieu-of-water-cooling-google-locks-down-renewables-for-mesa-data-center/","date":"2024-03-01","title":"In lieu of water cooling, Google locks down renewables for Mesa data center","publisher":"Latitude Media"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:40.751Z","updatedAt":"2026-08-19T00:15:18.304Z","location":{"id":"672b6e97-cace-46c4-a79b-ddd5c5c988d1","name":"Mesa","slug":"mesa-arizona","kind":"city","parentLocationId":"559f49c3-1532-4c6f-b055-4d83a05fb88b","region":"Southwest","lat":33.4151005,"lng":-111.831455,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:24:40.374Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"e2ce8e40-8cf9-4e4e-a053-6afd518b7798","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","companyId":null,"externalName":"Salt River Project (SRP)","role":"utility","structureNotes":null,"createdAt":"2026-08-17T20:24:42.307Z","company":null},{"id":"2a1101bb-5396-4437-93df-f6ce5b8c3559","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","companyId":null,"externalName":"NextEra Energy Resources","role":"operator","structureNotes":"Operator of the contracted generation, not the data center.","createdAt":"2026-08-17T20:24:43.067Z","company":null},{"id":"56dfe5e5-d6c0-47f2-b4fb-ef7825a1a2fb","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","companyId":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","externalName":"Google","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:24:41.542Z","company":{"id":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","name":"Google","slug":"google"}},{"id":"416fd009-c412-4616-b467-7a74229a0da3","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","companyId":null,"externalName":"Salt River Project","role":"offtaker","structureNotes":"SRP procures >430 MW new carbon-free capacity from NextEra facilities to supply the Google Mesa campus (agreement announced March 18, 2024)","createdAt":"2026-08-19T00:15:23.347Z","company":null}],"capacityClaims":[{"id":"d754a12b-7001-4910-be08-00a19660fead","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","series":"announced","valueGw":0.4,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://dcpulse.com/project/google-red-hawk-mesa-arizona-ai-data-center","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Tracker estimate of campus AI capacity (~400MW); not company-confirmed","createdAt":"2026-08-19T00:15:18.994Z"}],"financialClaims":[{"id":"ffd44a43-aa4d-46de-af61-e1d4b21684ad","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","kind":"capex","label":"Redhawk Phase 1 capital outlay","valueUsd":"600000000","capUsd":null,"conditions":"Committed spend threshold by July 2025 (Phase 1 completion deadline)","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.constructiondive.com/news/google-data-center-mesa-arizona/693029/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:15:19.527Z"},{"id":"2e27b493-5e0a-4aba-ad08-0da900788699","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","kind":"capex","label":"Redhawk full campus buildout (est.)","valueUsd":"1000000000","capUsd":null,"conditions":"Full ~750,000 sq ft buildout valuation","asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.connectcre.com/stories/google-shows-plans-for-1b-mesa-data-center/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:15:20.293Z"}],"metricClaims":[{"id":"ee137933-8326-44e7-b341-502458a6b2af","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","metricType":"capex_usd","valueNumeric":600000000,"valueText":"Phase 1 capital outlay committed by July 2025","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.constructiondive.com/news/google-data-center-mesa-arizona/693029/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:15:22.585Z"},{"id":"b6d466a0-e7dd-4bcf-a290-1c5e4c6cd1d0","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","metricType":"cooling_type","valueNumeric":null,"valueText":"Air-cooled","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://blog.google/company-news/outreach-and-initiatives/sustainability/google-carbon-free-data-center-arizona-/","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:15:22.209Z"}],"powerProjects":[{"id":"06374251-f442-4731-b943-47dd793b6693","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","name":"SRP/NextEra carbon-free supply","type":"solar","capacityGw":0.43,"lifecycleState":"announced","sourceUrl":"https://esgnews.com/google-signs-agreement-with-salt-river-project-srp-to-support-more-than-430-carbon-free-megawatts/","evidenceTier":"reported","note":"430+ MW of new carbon-free capacity contracted via SRP; blends wind, solar and battery storage.","createdAt":"2026-08-17T20:24:41.151Z"},{"id":"e01305a2-239b-4605-b012-a410633f4ea6","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","name":"Sonoran Solar Energy Center","type":"solar","capacityGw":0.26,"lifecycleState":"energized","sourceUrl":"https://www.tdworld.com/distributed-energy-resources/energy-storage/article/21284771/srp-nextera-and-google-to-support-upcoming-data-center-campus-in-arizona","evidenceTier":"verified","note":"260 MW solar + 1 GWh (4-hr) battery storage; NextEra facility south of Buckeye, AZ; commissioned and operational. Part of SRP agreement supplying >430 MW carbon-free to Google Mesa","createdAt":"2026-08-19T00:15:21.057Z"},{"id":"1bdac0b1-0ba3-445f-810c-61cf7f2f653a","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","name":"Storey Energy Center","type":"solar","capacityGw":0.088,"lifecycleState":"energized","sourceUrl":"https://www.tdworld.com/distributed-energy-resources/energy-storage/article/21284771/srp-nextera-and-google-to-support-upcoming-data-center-campus-in-arizona","evidenceTier":"verified","note":"88 MW solar + battery storage; NextEra facility in Coolidge, AZ; commissioned and operational","createdAt":"2026-08-19T00:15:21.452Z"},{"id":"c579f7bc-a80a-4f90-a628-c032b65b0279","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","name":"Babbitt Ranch Energy Center","type":"wind","capacityGw":0.161,"lifecycleState":"under_construction","sourceUrl":"https://www.tdworld.com/distributed-energy-resources/energy-storage/article/21284771/srp-nextera-and-google-to-support-upcoming-data-center-campus-in-arizona","evidenceTier":"verified","note":"161 MW wind, NextEra facility in Coconino County (north of Flagstaff); under development. Part of SRP >430 MW carbon-free agreement","createdAt":"2026-08-19T00:15:21.834Z"}],"facilities":[{"slug":"google-mesa-az","name":"Mesa Data Center","status":"operating","criticalItMw":null,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"60428660-9240-43e0-8288-541c3982fd2f","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"offtaker: Salt River Project","occurredAt":"2026-08-19T00:15:23.740Z","createdAt":"2026-08-19T00:15:23.740Z"},{"id":"f24b59c9-894c-4e03-91ab-f5fd14b489e1","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Redhawk full campus buildout (est.)","occurredAt":"2026-08-19T00:15:20.676Z","createdAt":"2026-08-19T00:15:20.676Z"},{"id":"c4d9017c-2837-4d79-93b1-e13ddae84980","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Redhawk Phase 1 capital outlay","occurredAt":"2026-08-19T00:15:19.913Z","createdAt":"2026-08-19T00:15:19.913Z"},{"id":"492aee31-e0b5-42bb-8b44-1e8fb7fee29f","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.4","claimId":"d754a12b-7001-4910-be08-00a19660fead","detail":null,"occurredAt":"2026-08-19T00:15:19.299Z","createdAt":"2026-08-19T00:15:19.299Z"},{"id":"abb3edc8-f199-46ae-af32-b9572b4c027a","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.4","claimId":"d754a12b-7001-4910-be08-00a19660fead","detail":"claimed · tracker","occurredAt":"2026-08-19T00:15:19.148Z","createdAt":"2026-08-19T00:15:19.148Z"},{"id":"f359b3f1-e714-48ce-85a3-3424510fdcda","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: NextEra Energy Resources","occurredAt":"2026-08-17T20:24:43.452Z","createdAt":"2026-08-17T20:24:43.452Z"},{"id":"5efba210-b1ab-4b06-9e11-7cd4adb63438","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Salt River Project (SRP)","occurredAt":"2026-08-17T20:24:42.687Z","createdAt":"2026-08-17T20:24:42.687Z"},{"id":"4f5a625f-d9f5-4f8a-a3c3-0843b61ac499","dataCenterId":"121efb2d-c261-49da-af33-27e6a989a1b1","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Google","occurredAt":"2026-08-17T20:24:41.918Z","createdAt":"2026-08-17T20:24:41.918Z"}],"capacity_picture":{"announced_gw":0.4,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.4,"by_series":{"announced":{"valueGw":0.4,"asOf":"2025-06-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://dcpulse.com/project/google-red-hawk-mesa-arizona-ai-data-center"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Google Mesa Data Center (Redhawk)","url":"https://registry.deploy.report/datacenters/google-mesa-redhawk","address":{"@type":"PostalAddress","addressLocality":"Mesa"}}}