{"id":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","slug":"firmus-southgate-bell-bay-tasmania","name":"Project Southgate (Bell Bay, Tasmania)","aliases":["Southgate Tasmania","Firmus Green AI Factory"],"locationId":"b7a91b49-4f50-480e-8f03-3c05f3fccad8","lat":-41.13,"lng":146.87,"locationPrecision":"city","landStatus":null,"lifecycleState":"under_construction","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"TasNetworks","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Firmus / Sustainable Metal Cloud's flagship Project Southgate green AI factory at the former Gunns pulp-mill site, Bell Bay, Tasmania, on firmed Tasmanian hydro/wind/solar via TasNetworks. Reported at ~288 MW gross site capacity (a separate Firmus page cites 84 MW critical IT load), targeting ~36,800 NVIDIA GB300 GPUs with direct-to-chip liquid cooling (PUE < 1.10). A separate ~150 MW Melbourne site (~18,400 GB300) is also under development; the company targets 1.6 GW nationally by 2028.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://firmus.co/infrastructure/southgate/project-southgate-faqs","title":"Project Southgate Bell Bay: FAQs","sourceName":"Firmus"},{"url":"https://w.media/firmus-partners-cdc-on-southgate-to-scale-to-1-6-gw/","title":"Firmus partners CDC on Southgate to scale to 1.6 GW","sourceName":"W.Media"}],"reviewNote":null,"createdAt":"2026-08-31T01:26:06.015Z","updatedAt":"2026-08-31T01:26:45.520Z","location":{"id":"b7a91b49-4f50-480e-8f03-3c05f3fccad8","name":"Bell Bay, Tasmania, Australia","slug":"bell-bay-tasmania","kind":"city","parentLocationId":null,"region":null,"lat":-41.13,"lng":146.87,"reviewStatus":"unreviewed","aliases":["Bell Bay","Long Reach","Tasmania"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-31T01:26:05.249Z","updatedAt":"2026-08-31T01:26:05.249Z"},"parties":[{"id":"7ab55a18-af40-4473-b9d8-6db32fcdad04","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","companyId":"537198e4-af5b-4ac0-924e-370597914367","externalName":null,"role":"operator","structureNotes":"Firmus / Sustainable Metal Cloud.","createdAt":"2026-08-31T01:26:07.651Z","company":{"id":"537198e4-af5b-4ac0-924e-370597914367","name":"Sustainable Metal Cloud","slug":"sustainable-metal-cloud"}},{"id":"f17ff65f-48c7-4942-ba24-cceb42953466","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","companyId":null,"externalName":"CDC Data Centres","role":"construction","structureNotes":"Infrastructure partner.","createdAt":"2026-08-31T01:26:08.445Z","company":null},{"id":"bce4c559-915d-455f-8b36-35f8b7172fb8","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","companyId":null,"externalName":"TasNetworks","role":"grid_operator","structureNotes":"220 kV transmission; firmed hydro/wind/solar.","createdAt":"2026-08-31T01:26:09.294Z","company":null},{"id":"bf0ca1b8-e4e4-44dd-aeb2-d38954ee0550","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","companyId":null,"externalName":"NVIDIA","role":"chip_supplier","structureNotes":"GB300 NVL72; DGX Cloud among first services.","createdAt":"2026-08-31T01:26:10.072Z","company":null}],"capacityClaims":[{"id":"5fd4a463-6ea1-4f93-b0e3-66a869d3c485","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","series":"announced","valueGw":0.288,"asOf":"2025-10-16T00:00:00.000Z","sourceUrl":"https://firmus.co/infrastructure/southgate/project-southgate-faqs","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"~288 MW gross site (Bell Bay); a separate Firmus page cites 84 MW critical IT load.","createdAt":"2026-08-31T01:26:07.102Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"75970c71-9181-4055-8ca9-20b45d9e212c","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: NVIDIA","occurredAt":"2026-08-31T01:26:10.468Z","createdAt":"2026-08-31T01:26:10.468Z"},{"id":"26982108-8007-41b0-a211-5702ed7df2ae","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: TasNetworks","occurredAt":"2026-08-31T01:26:09.682Z","createdAt":"2026-08-31T01:26:09.682Z"},{"id":"1a61d51c-6999-4b50-9a38-0d5cb0c42938","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: CDC Data Centres","occurredAt":"2026-08-31T01:26:08.829Z","createdAt":"2026-08-31T01:26:08.829Z"},{"id":"10b91c60-a6c3-482e-95bd-e0a4aa10f942","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: 537198e4-af5b-4ac0-924e-370597914367","occurredAt":"2026-08-31T01:26:08.041Z","createdAt":"2026-08-31T01:26:08.041Z"},{"id":"bc752a2a-53e1-45c7-ad5b-f85c788c7056","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.288","claimId":"5fd4a463-6ea1-4f93-b0e3-66a869d3c485","detail":null,"occurredAt":"2026-08-31T01:26:07.414Z","createdAt":"2026-08-31T01:26:07.414Z"},{"id":"ac79f2e4-9c28-47cd-b2ab-f2a9bcb9d4c6","dataCenterId":"cbdcd366-86df-4693-ba5d-e81d4a74d21d","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.288","claimId":"5fd4a463-6ea1-4f93-b0e3-66a869d3c485","detail":"reported · journalist_report","occurredAt":"2026-08-31T01:26:07.258Z","createdAt":"2026-08-31T01:26:07.258Z"}],"capacity_picture":{"announced_gw":0.288,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.288,"by_series":{"announced":{"valueGw":0.288,"asOf":"2025-10-16T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://firmus.co/infrastructure/southgate/project-southgate-faqs"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Project Southgate (Bell Bay, Tasmania)","url":"https://registry.deploy.report/datacenters/firmus-southgate-bell-bay-tasmania","geo":{"@type":"GeoCoordinates","latitude":-41.13,"longitude":146.87},"address":{"@type":"PostalAddress","addressLocality":"Bell Bay, Tasmania, Australia"}}}