{"id":"506b1871-f8ed-4757-ae33-aba491bd3cb6","slug":"vantage-tx22-san-antonio-bexar-county-tx","name":"Vantage TX22 (San Antonio)","aliases":[],"operatorCompanyId":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","parentCampusId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","lat":29.4774324,"lng":-98.6976084,"streetAddress":"5207 Rogers Rd, San Antonio, TX","locationId":"8c451bb9-eebd-4176-8769-5faee040cbc5","status":"under_construction","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":214525,"yearOperational":2027,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"exact","reviewStatus":"reviewed","sources":[{"url":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/"}],"notes":null,"createdAt":"2026-08-19T04:49:52.047Z","updatedAt":"2026-08-28T04:02:43.432Z","operator":{"name":"Vantage Data Centers","slug":"vantage-data-centers"},"parentCampus":{"id":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","slug":"vantage-tx1-san-antonio-bexar-texas","name":"Vantage TX1 San Antonio Campus","aliases":["Vantage TX1","Vantage San Antonio","TX12"],"locationId":"8c451bb9-eebd-4176-8769-5faee040cbc5","lat":29.44697655,"lng":-98.74359165,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Vantage's San Antonio (Bexar County) campuses hold TCEQ minor air permits and are seeking to expand from 22 to 80+ generators; VoltaGrid is building ~423 MW of on-site natural-gas generation across two Vantage sites (near SH-151/Wiseman and on Omicron Drive). This is distinct from Vantage's Frontier campus in Shackelford County. Total IT capacity is reported in ranges (TX1 ~100-250 MW) and not firmly disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/vantage-files-to-build-second-san-antonio-data-center-in-texas/","date":"2026-07-01","title":"Vantage files to build second San Antonio data center in Texas","publisher":"DCD"},{"url":"https://www.ksat.com/news/local/2026/07/10/air-quality-concerns-rise-as-data-center-company-seeks-approval-to-run-diesel-generators/","date":"2026-07-10","title":"Air quality concerns rise as data center company seeks approval to run diesel generators","publisher":"KSAT"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:09.801Z","updatedAt":"2026-08-28T14:22:23.508Z","parties":[{"id":"76bcc083-b732-477e-ba3d-9ad2920119dc","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","companyId":null,"externalName":"VoltaGrid","role":"utility","structureNotes":"On-site gas generation operator","createdAt":"2026-08-17T20:24:11.321Z","company":null},{"id":"89049fb1-5cfd-4897-8101-ad3f6659f691","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","companyId":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","externalName":"Vantage Data Centers","role":"developer","structureNotes":"DigitalBridge-backed","createdAt":"2026-08-17T20:24:10.564Z","company":{"id":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","name":"Vantage Data Centers","slug":"vantage-data-centers"}},{"id":"f0bd8a4a-38ea-4e87-8493-7206ff58848a","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","companyId":null,"externalName":"Bandera Electric Cooperative","role":"utility","structureNotes":"Local electric distribution utility listed for the Rogers Rd (TX2) site (not CPS Energy).","createdAt":"2026-08-19T00:15:01.612Z","company":null}],"financialClaims":[{"id":"9aab56f4-e13c-4420-9cd0-81c06ee461ff","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","kind":"capex","label":"Omicron campus investment","valueUsd":"448000000","capUsd":null,"conditions":"Described as Vantage's record Bexar County investment; >$1B combined registered along the Omicron corridor since 2020 (corridor-level).","asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.yahoo.com/news/articles/data-center-boom-across-san-120800855.html","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:15:00.063Z"}],"metricClaims":[],"powerProjects":[{"id":"c363a845-153f-45f6-9d53-df58d70f91fc","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","name":"VoltaGrid on-site gas generation (Vantage SA)","type":"gas","capacityGw":0.423,"lifecycleState":"under_construction","sourceUrl":"https://www.ksat.com/news/local/2026/07/10/air-quality-concerns-rise-as-data-center-company-seeks-approval-to-run-diesel-generators/","evidenceTier":"reported","note":"~423 MW dedicated generation across two Vantage SA sites","createdAt":"2026-08-17T20:24:10.182Z"},{"id":"1b54a486-a456-49f3-a09c-d0ebe8d90808","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","name":"VoltaGrid on-site natural-gas prime power (San Antonio)","type":"gas","capacityGw":0.423,"lifecycleState":"partially_energized","sourceUrl":"https://insideclimatenews.org/news/22072026/texas-data-center-air-pollution-lawsuit/","evidenceTier":"reported","note":"~423 MW dedicated prime natural-gas generation across two Vantage SA sites combined (one operating, one under construction); ~151 diesel backup generators; TCEQ minor-source permits expanding from 22 to 80+.","createdAt":"2026-08-19T00:15:00.826Z"}],"capacityClaims":[{"id":"746a9f40-5494-4c16-8b3d-04451f0d0b84","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","series":"under_construction","valueGw":0.096,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/vantage-tx12-san-antonio","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Building TX12 (Omicron Dr campus): up to 96 MW critical IT, two-story, 432,800 sq ft.","createdAt":"2026-08-19T00:14:58.831Z"},{"id":"010a2a79-15dc-479a-9683-05c605372873","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","series":"under_construction","valueGw":0.032,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/vantage-tx11-san-antonio","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Building TX11: 32 MW critical IT, 242,665 sq ft, go-live early 2026.","createdAt":"2026-08-19T00:14:59.684Z"}],"events":[{"id":"ab5633a1-6e3a-4884-bb66-f70e6b1cacc0","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Bandera Electric Cooperative","occurredAt":"2026-08-19T00:15:01.996Z","createdAt":"2026-08-19T00:15:01.996Z"},{"id":"e2582843-25fd-410e-838b-65e22406d602","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Omicron campus investment","occurredAt":"2026-08-19T00:15:00.443Z","createdAt":"2026-08-19T00:15:00.443Z"},{"id":"65a6a432-6811-446e-9175-66cd5bbe620f","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.032","claimId":"010a2a79-15dc-479a-9683-05c605372873","detail":"claimed · tracker","occurredAt":"2026-08-19T00:14:59.837Z","createdAt":"2026-08-19T00:14:59.837Z"},{"id":"7fc90eb0-c82f-495b-b1ae-707c200d3462","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.096","claimId":"746a9f40-5494-4c16-8b3d-04451f0d0b84","detail":null,"occurredAt":"2026-08-19T00:14:59.133Z","createdAt":"2026-08-19T00:14:59.133Z"},{"id":"edc4e251-ebbd-4fa4-ba9d-7a1a78c0890c","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.096","claimId":"746a9f40-5494-4c16-8b3d-04451f0d0b84","detail":"claimed · tracker","occurredAt":"2026-08-19T00:14:58.983Z","createdAt":"2026-08-19T00:14:58.983Z"},{"id":"54a1db1f-d2da-4d4d-904f-c3b0dce18a54","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: VoltaGrid","occurredAt":"2026-08-17T20:24:11.710Z","createdAt":"2026-08-17T20:24:11.710Z"},{"id":"00799191-0db6-45dc-937e-a56518820d49","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Vantage Data Centers","occurredAt":"2026-08-17T20:24:10.948Z","createdAt":"2026-08-17T20:24:10.948Z"}]},"location":{"name":"San Antonio","slug":"san-antonio-texas","kind":"city","lat":29.4246002,"lng":-98.4951405},"evidence":[{"id":"e7e0718b-b22d-474a-8b40-56d64225a135","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"building_sqft","value":"214,525","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},{"id":"f5862615-ee9a-4339-a138-5d44717ddf29","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"record","value":"Vantage TX22 (San Antonio)","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},{"id":"8ec6c4f2-f708-451c-9c4b-4d5538f95ef9","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"status","value":"under construction; $272M, build Oct 2025-Jun 2027 (distinct from Frontier campus)","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},{"id":"9bf0cb8a-c2ca-4ce6-b77e-630d9efdec5a","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"streetAddress","value":"5207 Rogers Rd, San Antonio, TX","asOf":null,"sourceUrl":"https://baxtel.com/data-center/vantage-tx22","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T22:14:49.602Z"}],"resolved_facts":{"building_sqft":{"id":"e7e0718b-b22d-474a-8b40-56d64225a135","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"building_sqft","value":"214,525","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},"record":{"id":"f5862615-ee9a-4339-a138-5d44717ddf29","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"record","value":"Vantage TX22 (San Antonio)","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},"status":{"id":"8ec6c4f2-f708-451c-9c4b-4d5538f95ef9","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"status","value":"under construction; $272M, build Oct 2025-Jun 2027 (distinct from Frontier campus)","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},"streetAddress":{"id":"9bf0cb8a-c2ca-4ce6-b77e-630d9efdec5a","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"streetAddress","value":"5207 Rogers Rd, San Antonio, TX","asOf":null,"sourceUrl":"https://baxtel.com/data-center/vantage-tx22","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T22:14:49.602Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Vantage TX22 (San Antonio)","url":"https://registry.deploy.report/datacenters/facilities/vantage-tx22-san-antonio-bexar-county-tx","geo":{"@type":"GeoCoordinates","latitude":29.4774324,"longitude":-98.6976084},"address":{"@type":"PostalAddress","addressLocality":"San Antonio","streetAddress":"5207 Rogers Rd, San Antonio, TX"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Vantage Data Centers"}]}}