{"id":"d595922a-3313-4569-864e-7940ac2b2f79","slug":"meta-el-paso-tx","name":"Meta El Paso Data Center","aliases":[],"operatorCompanyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","parentCampusId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","lat":null,"lng":null,"streetAddress":null,"locationId":"50941799-df9d-424b-9bcb-ac459d1e38cc","status":"under_construction","facilityType":"hyperscale","criticalItMw":1000,"buildingSqft":null,"yearOperational":2028,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c3_media","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/"}],"notes":null,"createdAt":"2026-08-19T03:48:40.467Z","updatedAt":"2026-08-28T04:02:38.728Z","operator":{"name":"Meta Platforms","slug":"meta-platforms"},"parentCampus":{"id":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","slug":"meta-blackrock-el-paso-texas","name":"Meta / BlackRock El Paso AI Data Center Campus","aliases":["Meta El Paso","Meta BlackRock El Paso venture"],"locationId":"50941799-df9d-424b-9bcb-ac459d1e38cc","lat":31.9868637,"lng":-106.3919548,"locationPrecision":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":1039,"totalBuildingSqft":null,"streetAddress":null,"notes":"1 GW AI compute campus (~4M sq ft on ~1,039 acres) that Meta is building and then contributed into an 80/20 JV with BlackRock. Power is grid from El Paso Electric (WECC, not ERCOT) up to 1.0 GW plus a proposed dedicated ~366 MW on-site natural gas plant. Capacity is planned to begin coming online in 2028; nothing is energized yet. Exact site coordinates not disclosed in primary sources.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","date":"2026-07-28","title":"Meta Announces New Strategic Venture with BlackRock to Develop Data Center in El Paso","publisher":"Meta"},{"url":"https://www.cnbc.com/2026/07/28/meta-blackrock-partner-on-14-billion-el-paso-data-center.html","date":"2026-07-28","title":"Meta, BlackRock partner on $14 billion El Paso data center venture","publisher":"CNBC"},{"url":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","date":"2026-03-26","title":"Meta to spend $10 billion on AI data center in El Paso, 1GW by 2028","publisher":"CNBC"},{"url":"https://w.media/meta-hands-blackrock-majority-stake-in-1-gw-el-paso-data-center/","date":"2026-07-29","title":"Meta hands BlackRock majority stake in 1 GW El Paso data center","publisher":"W.Media"}],"reviewNote":null,"createdAt":"2026-08-17T18:20:32.848Z","updatedAt":"2026-08-29T19:10:58.515Z","parties":[{"id":"01de686d-71e2-4392-a118-71da80bed980","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":null,"externalName":"BlackRock (managed funds)","role":"financier","structureNotes":"Owns 80% of the venture; ~$4.9B cash contribution plus $12.5B debt financing","createdAt":"2026-08-17T18:20:40.816Z","company":null},{"id":"663ab0a6-705d-40b8-be99-cbadfc1d1483","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":null,"externalName":"El Paso Electric","role":"utility","structureNotes":"Grid supplier, up to 1.0 GW (WECC region)","createdAt":"2026-08-17T18:20:41.852Z","company":null},{"id":"e5654d58-1029-4a33-9906-993730615249","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","externalName":"Meta Platforms","role":"developer","structureNotes":"Built the campus; retains 20% of the venture and leases capacity back (4-year initial term, up to ~20 years)","createdAt":"2026-08-17T18:20:39.765Z","company":{"id":"a9a34db8-5719-4789-b681-7ba6643a92b2","name":"Meta Platforms","slug":"meta-platforms"}},{"id":"a9c24b1f-55aa-4651-96c4-3bd59086d3fa","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":null,"externalName":"Global Infrastructure Partners (GIP)","role":"financier","structureNotes":"BlackRock unit; part of the 80% JV capital","createdAt":"2026-08-19T01:34:03.609Z","company":null},{"id":"b33ecbee-5e09-4f1a-a8ab-f885befb6e68","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":null,"externalName":"HPS Investment Partners","role":"financier","structureNotes":"BlackRock unit; part of the JV financing","createdAt":"2026-08-19T01:34:04.842Z","company":null}],"financialClaims":[{"id":"faef6b4a-5240-44ab-a438-9a6db489312c","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"investment","label":"Meta construction and development investment","valueUsd":"10000000000","capUsd":null,"conditions":"Over $10B","asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-17T18:20:37.038Z"},{"id":"c6d6c052-7e22-44a0-ad87-5d00968cc6c9","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"capex","label":"Total venture development cost","valueUsd":"14000000000","capUsd":null,"conditions":"Approximately $14B for buildings and infrastructure","asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-17T18:20:37.897Z"},{"id":"0367172b-cf0b-4a38-9f2d-ce0710d9fdcb","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"equity","label":"BlackRock cash contribution at close","valueUsd":"4900000000","capUsd":null,"conditions":"80% JV interest; funded partly by $12.5B debt financing","asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-17T18:20:38.811Z"},{"id":"1a4d3882-05ef-4f8d-8201-93225465603b","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"capex","label":"Senior secured notes (Sopaipilla Investor LLC)","valueUsd":"12500000000","capUsd":null,"conditions":"~$12.5B of senior secured notes priced 2026-07-27 to fund the project","asOf":"2026-07-27T00:00:00.000Z","sourceUrl":"https://pulse2.com/meta-and-blackrock-form-14-billion-venture-to-develop-el-paso-ai-data-center-campus/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:34:00.888Z"},{"id":"03d6173a-f50d-4fc6-9906-9bc37eaef32c","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"capex","label":"BlackRock cash contribution to JV","valueUsd":"4900000000","capUsd":null,"conditions":"BlackRock (with GIP and HPS) contributes ~$4.9B cash; Meta contributes ~$2.3B in land and construction-in-progress and receives a one-time $1B distribution","asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://pulse2.com/meta-and-blackrock-form-14-billion-venture-to-develop-el-paso-ai-data-center-campus/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:34:01.668Z"},{"id":"8c54a76a-f353-4923-96be-6baafa241573","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"capex","label":"Land purchase (1,039 acres from City of El Paso)","valueUsd":"8500000","capUsd":null,"conditions":"Meta bought 1,039 acres of vacant land in far Northeast El Paso from the city for $8.5M","asOf":"2023-12-29T00:00:00.000Z","sourceUrl":"https://www.aol.com/meta-completes-8-5m-purchase-132609504.html","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:34:02.426Z"}],"metricClaims":[{"id":"d63f431b-d9c8-41f9-ae36-7cdcb6b84429","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","metricType":"capex_usd","valueNumeric":10000000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/el-paso-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-texas-el-paso","createdAt":"2026-08-18T13:51:56.156Z"},{"id":"76b65d3b-b7fc-4c1a-8422-10cb90329e0e","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","metricType":"jobs_construction","valueNumeric":4000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/el-paso-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-texas-el-paso","createdAt":"2026-08-18T13:51:56.923Z"},{"id":"ff6e8d58-a6d4-4af1-ac33-79bb0bba2ba9","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","metricType":"jobs_permanent","valueNumeric":300,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/el-paso-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-texas-el-paso","createdAt":"2026-08-18T13:51:57.779Z"}],"powerProjects":[{"id":"e367a134-76b9-4a1f-aadc-8550768d1fe4","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","name":"El Paso Electric grid supply","type":"grid_interconnect","capacityGw":1,"lifecycleState":"announced","sourceUrl":"https://cryptobriefing.com/meta-el-paso-data-center-1gw/","evidenceTier":"reported","note":"Up to 1.0 GW committed, right to request up to 1.4 GW; El Paso Electric is a WECC utility","createdAt":"2026-08-17T18:20:36.264Z"},{"id":"cffa2d98-731c-4ff2-ab6e-1a7e48750ddb","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","name":"Proposed on-site natural gas plant","type":"gas","capacityGw":0.366,"lifecycleState":"announced","sourceUrl":"https://cryptobriefing.com/meta-el-paso-data-center-1gw/","evidenceTier":"reported","note":"Meta-proposed dedicated ~366 MW gas plant","createdAt":"2026-08-17T18:20:36.649Z"}],"capacityClaims":[{"id":"fa688b42-12c7-4f10-91a6-bccdaddc4444","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","series":"announced","valueGw":1,"asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"Official Meta figure: 1 gigawatt of compute capacity","createdAt":"2026-08-17T18:20:33.600Z"},{"id":"aff560af-4fc5-42af-928e-c8d0dd301fbc","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","series":"contracted","valueGw":1,"asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://cryptobriefing.com/meta-el-paso-data-center-1gw/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"El Paso Electric contracted to deliver up to 1.0 GW, with right to request up to 1.4 GW","createdAt":"2026-08-17T18:20:34.727Z"},{"id":"bcf15300-b746-4e2d-9424-298bd1191511","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","series":"energized","valueGw":0,"asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"Capacity expected to begin coming online in 2028; none energized as of announcement","createdAt":"2026-08-17T18:20:35.704Z"}],"events":[{"id":"ac40180f-9aa7-496a-987c-625c4bdaf3a3","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: HPS Investment Partners","occurredAt":"2026-08-19T01:34:05.224Z","createdAt":"2026-08-19T01:34:05.224Z"},{"id":"e6cd1c3a-1015-4bc7-9ce4-d68850a9731a","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Global Infrastructure Partners (GIP)","occurredAt":"2026-08-19T01:34:03.995Z","createdAt":"2026-08-19T01:34:03.995Z"},{"id":"c8078e83-300d-4cbe-af7d-148ce444780c","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Land purchase (1,039 acres from City of El Paso)","occurredAt":"2026-08-19T01:34:02.807Z","createdAt":"2026-08-19T01:34:02.807Z"},{"id":"a373100c-1e9e-42f1-bf30-88860ede3b2f","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: BlackRock cash contribution to JV","occurredAt":"2026-08-19T01:34:02.049Z","createdAt":"2026-08-19T01:34:02.049Z"},{"id":"280a2ac0-de89-4e9c-9cf1-7bde8dd3ef59","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Senior secured notes (Sopaipilla Investor LLC)","occurredAt":"2026-08-19T01:34:01.285Z","createdAt":"2026-08-19T01:34:01.285Z"},{"id":"b61438ce-919d-4b99-99f5-d17c9adaa8bc","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: El Paso Electric","occurredAt":"2026-08-17T18:20:42.307Z","createdAt":"2026-08-17T18:20:42.307Z"},{"id":"e3fa4782-2054-4403-8811-b5892562b665","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: BlackRock (managed funds)","occurredAt":"2026-08-17T18:20:41.373Z","createdAt":"2026-08-17T18:20:41.373Z"},{"id":"089ee6dc-7428-4a76-8244-1f54f842d364","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Meta Platforms","occurredAt":"2026-08-17T18:20:40.338Z","createdAt":"2026-08-17T18:20:40.338Z"},{"id":"0af6356a-883e-414e-b7b2-f55badcd1e4d","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"equity: BlackRock cash contribution at close","occurredAt":"2026-08-17T18:20:39.288Z","createdAt":"2026-08-17T18:20:39.288Z"},{"id":"d574a927-df48-4cf7-b85a-0e3300156eaf","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Total venture development cost","occurredAt":"2026-08-17T18:20:38.353Z","createdAt":"2026-08-17T18:20:38.353Z"},{"id":"956367fe-c1ee-4b21-9eb1-0fff5df48773","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"investment: Meta construction and development investment","occurredAt":"2026-08-17T18:20:37.482Z","createdAt":"2026-08-17T18:20:37.482Z"},{"id":"73416d1a-8923-4dd4-90b3-0ee26ed8a84d","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"bcf15300-b746-4e2d-9424-298bd1191511","detail":null,"occurredAt":"2026-08-17T18:20:36.038Z","createdAt":"2026-08-17T18:20:36.038Z"},{"id":"3999237a-f251-4435-8ada-cc1cc20f4ac8","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"bcf15300-b746-4e2d-9424-298bd1191511","detail":"verified · press_release","occurredAt":"2026-08-17T18:20:35.881Z","createdAt":"2026-08-17T18:20:35.881Z"},{"id":"0e89b52a-3715-4d40-b158-64dc26f5653d","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"1","claimId":"aff560af-4fc5-42af-928e-c8d0dd301fbc","detail":null,"occurredAt":"2026-08-17T18:20:35.075Z","createdAt":"2026-08-17T18:20:35.075Z"},{"id":"7c6f9643-20fd-47c3-808f-67536f799926","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"1","claimId":"aff560af-4fc5-42af-928e-c8d0dd301fbc","detail":"reported · utility_filing","occurredAt":"2026-08-17T18:20:34.910Z","createdAt":"2026-08-17T18:20:34.910Z"},{"id":"908f75e5-d318-4660-b18b-d7abd802b4e1","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1","claimId":"fa688b42-12c7-4f10-91a6-bccdaddc4444","detail":null,"occurredAt":"2026-08-17T18:20:33.972Z","createdAt":"2026-08-17T18:20:33.972Z"},{"id":"5c5c0d43-7628-42e3-9805-5440f1b122fd","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"fa688b42-12c7-4f10-91a6-bccdaddc4444","detail":"verified · press_release","occurredAt":"2026-08-17T18:20:33.756Z","createdAt":"2026-08-17T18:20:33.756Z"}]},"location":{"name":"El Paso","slug":"el-paso-texas","kind":"city","lat":31.7601001,"lng":-106.4870476},"evidence":[{"id":"433ff899-4435-43c7-8d82-abaac3a29c10","facilityId":"d595922a-3313-4569-864e-7940ac2b2f79","field":"critical_it_mw","value":"1000","asOf":null,"sourceUrl":"https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T03:48:40.873Z"},{"id":"60e9c12f-cf9b-4f58-8783-881d7de55b6e","facilityId":"d595922a-3313-4569-864e-7940ac2b2f79","field":"record","value":"Meta El Paso Data Center","asOf":null,"sourceUrl":"https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:48:40.873Z"},{"id":"25f6a7f3-f195-4beb-aaab-b6ac4f8cd5a8","facilityId":"d595922a-3313-4569-864e-7940ac2b2f79","field":"status","value":"broke ground Oct 15 2025; 1GW target by 2028 on 1,000 acres","asOf":null,"sourceUrl":"https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:48:40.873Z"}],"resolved_facts":{"critical_it_mw":{"id":"433ff899-4435-43c7-8d82-abaac3a29c10","facilityId":"d595922a-3313-4569-864e-7940ac2b2f79","field":"critical_it_mw","value":"1000","asOf":null,"sourceUrl":"https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T03:48:40.873Z"},"record":{"id":"60e9c12f-cf9b-4f58-8783-881d7de55b6e","facilityId":"d595922a-3313-4569-864e-7940ac2b2f79","field":"record","value":"Meta El Paso Data Center","asOf":null,"sourceUrl":"https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:48:40.873Z"},"status":{"id":"25f6a7f3-f195-4beb-aaab-b6ac4f8cd5a8","facilityId":"d595922a-3313-4569-864e-7940ac2b2f79","field":"status","value":"broke ground Oct 15 2025; 1GW target by 2028 on 1,000 acres","asOf":null,"sourceUrl":"https://constructionreviewonline.com/meta-breaks-ground-on-1-5-billion-ai-data-center-in-el-paso-boosting-regions-tech-footprint/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:48:40.873Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta El Paso Data Center","url":"https://registry.deploy.report/datacenters/facilities/meta-el-paso-tx","address":{"@type":"PostalAddress","addressLocality":"El Paso"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Meta Platforms"}]}}