{"id":"49b3f3b3-3faa-462d-9a6f-869a701a8744","slug":"lancium-abilene-clean-campus-taylor-tx","name":"Lancium Clean Campus Abilene","aliases":[],"operatorCompanyId":"38db3126-63da-456f-adae-fc88589b6690","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"4495a090-7118-4c79-8522-882b737dd11c","status":"under_construction","facilityType":"crypto_hpc","criticalItMw":null,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://lancium.com/locations/"}],"notes":null,"createdAt":"2026-08-19T23:51:35.809Z","updatedAt":"2026-08-20T00:10:07.718Z","operator":{"name":"Lancium","slug":"lancium"},"parentCampus":null,"location":{"name":"Abilene","slug":"abilene-texas","kind":"city","lat":32.45,"lng":-99.73},"evidence":[{"id":"ef6f161f-7fe8-4d37-8561-217ed0c8c967","facilityId":"49b3f3b3-3faa-462d-9a6f-869a701a8744","field":"critical_it_mw","value":"200 MW initial, planned expansion to over 1.2 GW","asOf":null,"sourceUrl":"https://www.businesswire.com/news/home/20240718273783/en/Crusoe-to-Build-Initial-200-MW-AI-Data-Center-With-Plans-to-Expand-at-1.2-GW-Lancium-Clean-Campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:51:36.190Z"},{"id":"3cf0b172-66d7-4bf4-9698-7fa5fe74974e","facilityId":"49b3f3b3-3faa-462d-9a6f-869a701a8744","field":"record","value":"Lancium Clean Campus Abilene","asOf":null,"sourceUrl":"https://lancium.com/locations/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:51:36.190Z"},{"id":"fac49132-c536-4413-8e11-ab9c76be94f3","facilityId":"49b3f3b3-3faa-462d-9a6f-869a701a8744","field":"status","value":"under construction (multi-phase, hosting bitcoin and AI/HPC tenants)","asOf":null,"sourceUrl":"https://abilenetx.gov/DocumentCenter/View/16123/DCOA-Lancium-news-release","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:51:36.190Z"}],"resolved_facts":{"critical_it_mw":{"id":"ef6f161f-7fe8-4d37-8561-217ed0c8c967","facilityId":"49b3f3b3-3faa-462d-9a6f-869a701a8744","field":"critical_it_mw","value":"200 MW initial, planned expansion to over 1.2 GW","asOf":null,"sourceUrl":"https://www.businesswire.com/news/home/20240718273783/en/Crusoe-to-Build-Initial-200-MW-AI-Data-Center-With-Plans-to-Expand-at-1.2-GW-Lancium-Clean-Campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:51:36.190Z"},"record":{"id":"3cf0b172-66d7-4bf4-9698-7fa5fe74974e","facilityId":"49b3f3b3-3faa-462d-9a6f-869a701a8744","field":"record","value":"Lancium Clean Campus Abilene","asOf":null,"sourceUrl":"https://lancium.com/locations/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:51:36.190Z"},"status":{"id":"fac49132-c536-4413-8e11-ab9c76be94f3","facilityId":"49b3f3b3-3faa-462d-9a6f-869a701a8744","field":"status","value":"under construction (multi-phase, hosting bitcoin and AI/HPC tenants)","asOf":null,"sourceUrl":"https://abilenetx.gov/DocumentCenter/View/16123/DCOA-Lancium-news-release","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:51:36.190Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Lancium Clean Campus Abilene","url":"https://registry.deploy.report/datacenters/facilities/lancium-abilene-clean-campus-taylor-tx","address":{"@type":"PostalAddress","addressLocality":"Abilene"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Lancium"}]}}