{"id":"0dcb81a7-7950-4725-a57d-47c4d4b612d1","slug":"google-the-dalles-river-road-building-wasco-or","name":"Google The Dalles (3500 River Road building)","aliases":[],"operatorCompanyId":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","parentCampusId":"963decea-f424-4814-a8de-94389e75476a","lat":45.6253889,"lng":-121.2023887,"streetAddress":"3500 River Road, The Dalles, OR","locationId":"c66bd0d7-b5fb-4455-b8e1-77013d15b76d","status":"under_construction","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":290000,"yearOperational":null,"yearAnnounced":null,"servingUtility":"Northern Wasco County PUD","wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"exact","reviewStatus":"reviewed","sources":[{"url":"https://www.constructiondive.com/news/google-whiting-turner-oregon-data-center/705938/"},{"url":"https://en.wikipedia.org/wiki/Google_Data_Centers","title":"Google Data Centers","sourceName":"Wikipedia"},{"url":"https://en.wikipedia.org/wiki/The_Dalles,_Oregon","title":"The Dalles, Oregon","sourceName":"Wikipedia"}],"notes":"This is a new 290,000 sq ft Google-owned hyperscale building on River Road in The Dalles, Wasco County, adding to the operator's existing Columbia River campus (locally known as Project 02) that has been running since 2006. Whiting-Turner Contracting Co. is the general contractor and the project carries a reported construction value of roughly $600 million. Local retail electric service in The Dalles is provided by Northern Wasco County PUD, which draws primarily on federal Columbia River hydropower via BPA. Google has not publicly disclosed critical IT load or a commissioning date for this specific building.","createdAt":"2026-08-19T03:41:16.594Z","updatedAt":"2026-08-28T04:02:38.344Z","operator":{"name":"Google","slug":"google"},"parentCampus":{"id":"963decea-f424-4814-a8de-94389e75476a","slug":"google-the-dalles-wasco-county","name":"Google The Dalles Data Center Campus","aliases":["Google Design LLC The Dalles","The Dalles data center campus"],"locationId":"c66bd0d7-b5fb-4455-b8e1-77013d15b76d","lat":45.6253889,"lng":-121.2023887,"locationPrecision":"exact","landStatus":"former_industrial","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"2024 use ~434.4M gal/yr (~1.19M gpd), up from 104M gal/yr in 2012; underground water right up to 3.88M gpd acquired with smelter; city commitment up to 2M gpd by Jan 2028, potential 8M gpd with expansion. Retail water via City of The Dalles; subject of a 2022-2023 public-records dispute (The Oregonian).","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google's ~$1.8B campus on a former aluminum smelter site has multiple operational data centers under Enterprise Zone agreements (2005/2013/2015) plus newer buildings under a 2021 Strategic Investment Program agreement with The Dalles and Wasco County; the city approved a fifth data center. Per-building MW load is not disclosed, but scale (2024 water use ~434M gallons; a >100 MW dedicated wind PPA) indicates the campus well exceeds 100 MW.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"http://www.thedalles.gov/business/google_data_centers/ezandsipagreements.php","date":"2021-11-09","title":"Enterprise Zone & Strategic Investment Program Agreements with Google","publisher":"City of The Dalles"},{"url":"https://www.costar.com/article/1934080842/google-advances-plan-to-expand-sprawling-data-center-campus-near-portland-oregon","date":"2024-01-01","title":"Google advances plan to expand sprawling data center campus near Portland, Oregon","publisher":"CoStar"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:12.469Z","updatedAt":"2026-08-28T14:22:23.508Z","parties":[{"id":"b2ee7485-0c2c-49a1-ad73-633fd413fa70","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":null,"externalName":"Northern Wasco County PUD","role":"utility","structureNotes":"Local public utility district","createdAt":"2026-08-17T20:25:14.003Z","company":null},{"id":"feb76bdc-445c-4f55-b47d-9d99aafe8ce5","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":null,"externalName":"Avangrid","role":"offtaker","structureNotes":"Wind PPA supplier","createdAt":"2026-08-17T20:25:14.757Z","company":null},{"id":"76357509-7505-4703-a61c-5e00086151b1","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","externalName":"Google (Design, LLC)","role":"operator","structureNotes":"SIP/EZ agreements administered by Business Oregon","createdAt":"2026-08-17T20:25:13.239Z","company":{"id":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","name":"Google","slug":"google"}},{"id":"c75b74fe-3de9-435e-bf82-3e32d4420cda","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":null,"externalName":"Whiting-Turner Contracting Co.","role":"construction","structureNotes":"General contractor for the ~$600M / two ~290,000 sq ft new-build expansion (broke ground Sept 2024).","createdAt":"2026-08-19T00:14:51.385Z","company":null},{"id":"eeffe2be-e68f-426b-8f0d-497c7c78d356","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":null,"externalName":"Northwest Aluminum","role":"land_owner","structureNotes":"Prior owner of the former smelter site; sold land to Google.","createdAt":"2026-08-19T00:14:52.525Z","company":null}],"financialClaims":[{"id":"0cf406da-edd1-40f5-9942-dec740314166","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","kind":"capex","label":"Cumulative Oregon investment since 2006","valueUsd":"1800000000","capUsd":null,"conditions":"~18-year cumulative figure touted by Google.","asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.kgw.com/article/money/business/google-touts-18-billion-investment-in-oregon-data-center/283-544712879","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:14:47.561Z"},{"id":"d2866a2c-0e09-48a8-9cac-d2aaa505eefe","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","kind":"tax_abatement","label":"Enterprise Zone abatements (2013 + 2015 agreements)","valueUsd":null,"capUsd":null,"conditions":"15-year abatements expiring ~2031/32 and ~2034/35; combined projected community payments ~$45.78M; effective property-tax discount reported ~92%.","asOf":"2021-06-01T00:00:00.000Z","sourceUrl":"https://www.thedalles.gov/business/google_data_centers/ezandsipagreements.php","sourceType":"permit_filing","evidenceTier":"verified","createdAt":"2026-08-19T00:14:48.336Z"},{"id":"599a3c66-342f-4af4-b7fd-4dc5220858dd","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","kind":"tax_abatement","label":"2021 Strategic Investment Program agreement (Design LLC)","valueUsd":null,"capUsd":null,"conditions":"Up to 2 data centers, 15-year abatement; Google pays 50% of assessed property tax on first project, 60% on second; $3M upfront per new development; plus Community Service Fee and Guaranteed Annual Payment.","asOf":"2021-06-01T00:00:00.000Z","sourceUrl":"https://www.thedalles.gov/business/google_data_centers/ezandsipagreements.php","sourceType":"permit_filing","evidenceTier":"verified","createdAt":"2026-08-19T00:14:49.097Z"}],"metricClaims":[{"id":"ad46abeb-3c26-4fcd-b5b9-09ba0f090bed","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","metricType":"jobs_permanent","valueNumeric":200,"valueText":">200 permanent jobs at site","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.kgw.com/article/money/business/google-touts-18-billion-investment-in-oregon-data-center/283-544712879","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:14:50.628Z"},{"id":"8d67941f-c01b-4f16-b15c-3e24e62f2ee7","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","metricType":"water_gpd","valueNumeric":1190000,"valueText":"~1.19M gpd (434.4M gal in 2024)","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.opb.org/article/2026/01/23/the-dalles-mayor-data-center-google/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:14:50.238Z"}],"powerProjects":[{"id":"83b093d5-e867-4ec6-96d5-13f07498ca99","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","name":"Leaning Juniper IIB repower (Avangrid, Gilliam County)","type":"wind","capacityGw":0.1,"lifecycleState":"announced","sourceUrl":"https://oregonbusiness.com/google-advances-commitment-to-the-dalles-launching-sustainable-water-storage-system/","evidenceTier":"reported","note":"Google PPA for 100+ MW clean energy to serve The Dalles campus.","createdAt":"2026-08-17T20:25:12.848Z"},{"id":"b917540a-78d8-4e8d-8b9a-ed2ddcf3e107","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","name":"Leaning Juniper IIB (Avangrid) repowered wind farm","type":"wind","capacityGw":0.119,"lifecycleState":"energized","sourceUrl":"https://www.avangrid.com/w/avangrid-announces-119-megawatt-repower-project-in-oregon","evidenceTier":"verified","note":"119 MW repowered wind farm in Gilliam County; >100 MW PPA to Google delivered via Northern Wasco County PUD; repower cost up to ~$200M, ~150 construction jobs.","createdAt":"2026-08-19T00:14:49.865Z"}],"capacityClaims":[],"events":[{"id":"1ff17437-0832-407b-95b1-c6095259a103","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"land_owner: Northwest Aluminum","occurredAt":"2026-08-19T00:14:52.903Z","createdAt":"2026-08-19T00:14:52.903Z"},{"id":"81380994-1f34-4a56-8c9f-0029d9a0b48e","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: Whiting-Turner Contracting Co.","occurredAt":"2026-08-19T00:14:51.761Z","createdAt":"2026-08-19T00:14:51.761Z"},{"id":"3e5673e7-b332-4c51-b2ff-a5c905e61e19","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tax_abatement: 2021 Strategic Investment Program agreement (Design LLC)","occurredAt":"2026-08-19T00:14:49.478Z","createdAt":"2026-08-19T00:14:49.478Z"},{"id":"e4adf33e-5169-4eba-ad56-fc254024202f","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tax_abatement: Enterprise Zone abatements (2013 + 2015 agreements)","occurredAt":"2026-08-19T00:14:48.712Z","createdAt":"2026-08-19T00:14:48.712Z"},{"id":"d7bc47b0-0685-4260-87ab-1565536321f4","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Cumulative Oregon investment since 2006","occurredAt":"2026-08-19T00:14:47.957Z","createdAt":"2026-08-19T00:14:47.957Z"},{"id":"cdae7d42-29d9-4ca0-bfd4-99efd30abc99","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"offtaker: Avangrid","occurredAt":"2026-08-17T20:25:15.145Z","createdAt":"2026-08-17T20:25:15.145Z"},{"id":"1d83a728-0433-4dbd-9f7d-3ddabac8c6ad","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Northern Wasco County PUD","occurredAt":"2026-08-17T20:25:14.380Z","createdAt":"2026-08-17T20:25:14.380Z"},{"id":"a4f80086-ebd6-44d0-bad3-a48243a3a26b","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Google (Design, LLC)","occurredAt":"2026-08-17T20:25:13.622Z","createdAt":"2026-08-17T20:25:13.622Z"}]},"location":{"name":"The Dalles","slug":"the-dalles-oregon","kind":"city","lat":45.6015056,"lng":-121.1841587},"evidence":[{"id":"76d30998-e266-4f22-9765-29c8cd653916","facilityId":"0dcb81a7-7950-4725-a57d-47c4d4b612d1","field":"building_sqft","value":"290,000 sqft ($600M)","asOf":null,"sourceUrl":"https://www.constructiondive.com/news/google-whiting-turner-oregon-data-center/705938/","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T03:41:16.978Z"},{"id":"5be6db33-aa05-48e4-911c-77c1e2089ba2","facilityId":"0dcb81a7-7950-4725-a57d-47c4d4b612d1","field":"record","value":"Google The Dalles (3500 River Road building)","asOf":null,"sourceUrl":"https://www.constructiondive.com/news/google-whiting-turner-oregon-data-center/705938/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:41:16.978Z"},{"id":"cb3f06ac-6da4-4eab-a7c6-ee454eaf3411","facilityId":"0dcb81a7-7950-4725-a57d-47c4d4b612d1","field":"status","value":"under construction (community development go-ahead)","asOf":null,"sourceUrl":"https://www.constructiondive.com/news/google-whiting-turner-oregon-data-center/705938/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:41:16.978Z"},{"id":"939d7ff3-1fc2-4cfa-80f9-1c7f9fa375c6","facilityId":"0dcb81a7-7950-4725-a57d-47c4d4b612d1","field":"streetAddress","value":"3500 River Road, The Dalles, OR","asOf":null,"sourceUrl":"https://columbiacommunityconnection.com/the-dalles/google-gets-another-go-second-data-center-garners-td-city-approval","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T20:40:11.948Z"}],"resolved_facts":{"building_sqft":{"id":"76d30998-e266-4f22-9765-29c8cd653916","facilityId":"0dcb81a7-7950-4725-a57d-47c4d4b612d1","field":"building_sqft","value":"290,000 sqft ($600M)","asOf":null,"sourceUrl":"https://www.constructiondive.com/news/google-whiting-turner-oregon-data-center/705938/","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T03:41:16.978Z"},"record":{"id":"5be6db33-aa05-48e4-911c-77c1e2089ba2","facilityId":"0dcb81a7-7950-4725-a57d-47c4d4b612d1","field":"record","value":"Google The Dalles (3500 River Road building)","asOf":null,"sourceUrl":"https://www.constructiondive.com/news/google-whiting-turner-oregon-data-center/705938/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:41:16.978Z"},"status":{"id":"cb3f06ac-6da4-4eab-a7c6-ee454eaf3411","facilityId":"0dcb81a7-7950-4725-a57d-47c4d4b612d1","field":"status","value":"under construction (community development go-ahead)","asOf":null,"sourceUrl":"https://www.constructiondive.com/news/google-whiting-turner-oregon-data-center/705938/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:41:16.978Z"},"streetAddress":{"id":"939d7ff3-1fc2-4cfa-80f9-1c7f9fa375c6","facilityId":"0dcb81a7-7950-4725-a57d-47c4d4b612d1","field":"streetAddress","value":"3500 River Road, The Dalles, OR","asOf":null,"sourceUrl":"https://columbiacommunityconnection.com/the-dalles/google-gets-another-go-second-data-center-garners-td-city-approval","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T20:40:11.948Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Google The Dalles (3500 River Road building)","url":"https://registry.deploy.report/datacenters/facilities/google-the-dalles-river-road-building-wasco-or","geo":{"@type":"GeoCoordinates","latitude":45.6253889,"longitude":-121.2023887},"address":{"@type":"PostalAddress","addressLocality":"The Dalles","streetAddress":"3500 River Road, The Dalles, OR"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Google"}]}}