{"id":"8607658f-0f85-4768-9ccf-418be17b23c6","slug":"crusoe-childress-tx-campus","name":"Crusoe Childress Campus","aliases":[],"operatorCompanyId":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","parentCampusId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","lat":null,"lng":null,"streetAddress":null,"locationId":"81180bd0-68b8-42ee-a428-8210b3182a82","status":"planned","facilityType":"hyperscale","criticalItMw":1000,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas"}],"notes":null,"createdAt":"2026-08-19T12:36:00.228Z","updatedAt":"2026-08-29T22:11:14.976Z","operator":{"name":"Crusoe","slug":"crusoe"},"parentCampus":{"id":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","slug":"crusoe-childress-texas","name":"Crusoe Childress Campus","aliases":[],"locationId":"81180bd0-68b8-42ee-a428-8210b3182a82","lat":34.4265,"lng":-100.2038,"locationPrecision":"city","landStatus":"private","lifecycleState":"announced","powerSourceMix":"solar_storage","interconnectionQueueStatus":"Grid connected, on land the power partner owns: the 270 acre campus belongs to Lancium, which secures the power interconnect and runs energy orchestration, while Crusoe designs, builds and operates the data center. Behind-the-meter solar and storage sit alongside the grid supply. The announcement does not state the interconnect's approval status.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Closed-loop, non-evaporative liquid cooling to reduce water use.","servingUtility":null,"acreage":270,"totalBuildingSqft":null,"streetAddress":null,"notes":"Crusoe and Lancium announced (July 2026) a 1.4 GW AI data center campus in Childress, Texas on a 270-acre Lancium-owned site, mirroring their Abilene model: Crusoe develops/operates the data centers and Lancium manages behind-the-meter energy. Powered by behind-the-meter solar and storage with a 1 GW ERCOT-approved interconnect; closed-loop cooling. Construction expected to begin Q3 2026; no capacity energized yet.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/","title":"Crusoe to develop 1.4GW data center campus in Childress, Texas","sourceName":"DataCenterDynamics"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","title":"Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas","sourceName":"Crusoe"},{"url":"https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/","title":"Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas","sourceName":"Lancium"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:30.228Z","updatedAt":"2026-08-28T19:22:00.883Z","parties":[{"id":"76c3aa75-b5c7-4121-947a-f63914e0e14c","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","companyId":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","externalName":"Crusoe Energy","role":"developer","structureNotes":"Develops and operates the data center campus.","createdAt":"2026-08-17T18:12:31.839Z","company":{"id":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","name":"Crusoe","slug":"crusoe"}},{"id":"16657dac-ba4e-4aed-baf8-0421e9703d74","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","companyId":null,"externalName":"Lancium","role":"utility","structureNotes":"Owns the 270-acre site and develops/manages behind-the-meter energy infrastructure.","createdAt":"2026-08-17T18:12:32.662Z","company":null},{"id":"a29555b5-5e35-41fc-8133-d12f94f0f88b","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","companyId":null,"externalName":"ERCOT","role":"grid_operator","structureNotes":"1 GW interconnect fully approved by ERCOT.","createdAt":"2026-08-17T18:12:33.424Z","company":null}],"financialClaims":[],"metricClaims":[{"id":"34fda771-31f7-47eb-9ff6-667423ea8fc7","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","metricType":"cooling_type","valueNumeric":null,"valueText":"Closed-loop, non-evaporative liquid cooling","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:44.395Z"},{"id":"0edcc500-d468-4226-9348-e7ae3523b890","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","metricType":"jobs_construction","valueNumeric":null,"valueText":"Thousands of local construction jobs","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.globenewswire.com/news-release/2026/07/15/3327869/0/en/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:44.009Z"},{"id":"57a23ea9-ccde-48ca-b666-13abdffb2d84","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","metricType":"jobs_permanent","valueNumeric":100,"valueText":"More than 100 long-term positions","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.globenewswire.com/news-release/2026/07/15/3327869/0/en/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:43.615Z"}],"powerProjects":[{"id":"25a57dcd-8804-4dad-9b51-f4bd6955bdc6","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","name":"Behind-the-meter solar + battery storage (Lancium)","type":"solar_storage","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","evidenceTier":"claimed","note":"Lancium develops/manages behind-the-meter solar and storage; specific generation capacity not disclosed. 1 GW ERCOT-approved grid interconnect.","createdAt":"2026-08-17T18:12:31.449Z"},{"id":"0bee71d3-2ae3-45e5-b3b7-553d4839fd77","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","name":"Behind-the-meter solar","type":"solar","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.globenewswire.com/news-release/2026/07/15/3327869/0/en/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas.html","evidenceTier":"reported","note":"On-site solar resource developed and managed by Lancium; capacity not disclosed.","createdAt":"2026-08-19T01:33:42.856Z"},{"id":"d01e9584-eef5-4fb5-b6c3-ec4a5acbfdad","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","name":"On-site energy storage","type":"storage","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.globenewswire.com/news-release/2026/07/15/3327869/0/en/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas.html","evidenceTier":"reported","note":"Behind-the-meter energy storage for grid reliability; capacity not disclosed.","createdAt":"2026-08-19T01:33:43.239Z"}],"capacityClaims":[{"id":"b7434d0b-d7e0-45a1-b060-819c587b4038","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","series":"announced","valueGw":1.4,"asOf":"2026-07-15T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"DataCenterDynamics reports 1.4 GW; Crusoe/Lancium press release frames the initial announcement as 1.0 GW. 270-acre site.","createdAt":"2026-08-17T18:12:30.909Z"},{"id":"13afa868-ef26-40ce-bf48-30a59337d2bd","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","series":"announced","valueGw":1,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"1.0 GW grid-connected per the July 15 2026 Crusoe/Lancium announcement (DCD headlines up to 1.4 GW); purpose-built for an unnamed leading hyperscaler.","createdAt":"2026-08-19T01:33:42.313Z"},{"id":"14e4a312-7062-47fe-9c52-90fca4c83f1a","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","series":"energized","valueGw":0,"asOf":"2026-07-15T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Crusoe/Lancium 1.0-1.4 GW campus announced July 15 2026, construction expected Q3 2026 on Lancium's 270-acre site. Nothing built or energized; no operational IT load.","createdAt":"2026-08-17T18:33:35.174Z"}],"events":[{"id":"1702cc00-ce6e-46eb-abe8-75da49abacbc","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"capacity_changed","series":"announced","oldValue":"1.4","newValue":"1","claimId":"13afa868-ef26-40ce-bf48-30a59337d2bd","detail":null,"occurredAt":"2026-08-19T01:33:42.623Z","createdAt":"2026-08-19T01:33:42.623Z"},{"id":"4aec04ad-34a1-4821-b7ec-bf2bac22e556","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"13afa868-ef26-40ce-bf48-30a59337d2bd","detail":"reported · press_release","occurredAt":"2026-08-19T01:33:42.464Z","createdAt":"2026-08-19T01:33:42.464Z"},{"id":"64de0408-f639-4015-b933-c28eeb81538a","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"14e4a312-7062-47fe-9c52-90fca4c83f1a","detail":null,"occurredAt":"2026-08-17T18:33:35.476Z","createdAt":"2026-08-17T18:33:35.476Z"},{"id":"e3f01d5b-a6cf-4a2f-848d-94c386b02b86","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"14e4a312-7062-47fe-9c52-90fca4c83f1a","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:33:35.328Z","createdAt":"2026-08-17T18:33:35.328Z"},{"id":"cb2ccb24-1986-4845-a34f-68c5543b3ee0","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: ERCOT","occurredAt":"2026-08-17T18:12:33.804Z","createdAt":"2026-08-17T18:12:33.804Z"},{"id":"d1797d57-cef3-403d-9c9e-6ff69bf50d31","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Lancium","occurredAt":"2026-08-17T18:12:33.036Z","createdAt":"2026-08-17T18:12:33.036Z"},{"id":"b51c3441-8a13-4b65-be40-0b95898553fe","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Crusoe Energy","occurredAt":"2026-08-17T18:12:32.279Z","createdAt":"2026-08-17T18:12:32.279Z"},{"id":"40b63982-fd65-4344-ab9f-f16547a82f0b","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.4","claimId":"b7434d0b-d7e0-45a1-b060-819c587b4038","detail":null,"occurredAt":"2026-08-17T18:12:31.215Z","createdAt":"2026-08-17T18:12:31.215Z"},{"id":"dee5e0f5-c7ef-4b1d-ab72-0622c32c9821","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.4","claimId":"b7434d0b-d7e0-45a1-b060-819c587b4038","detail":"claimed · journalist_report","occurredAt":"2026-08-17T18:12:31.062Z","createdAt":"2026-08-17T18:12:31.062Z"}]},"location":{"name":"Childress","slug":"childress-texas","kind":"city","lat":34.4265,"lng":-100.2038},"evidence":[{"id":"9c5b5d60-c7d8-4a66-b46e-bca44c2a6b75","facilityId":"8607658f-0f85-4768-9ccf-418be17b23c6","field":"critical_it_mw","value":"1000","asOf":null,"sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T12:36:00.606Z"},{"id":"c96a3f3c-d087-43be-8646-5193983a2ade","facilityId":"8607658f-0f85-4768-9ccf-418be17b23c6","field":"record","value":"Crusoe Childress Campus","asOf":null,"sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T12:36:00.606Z"},{"id":"45cd7672-0adb-464f-894a-06b0217e541f","facilityId":"8607658f-0f85-4768-9ccf-418be17b23c6","field":"status","value":"planned","asOf":null,"sourceUrl":"https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T12:36:00.606Z"}],"resolved_facts":{"critical_it_mw":{"id":"9c5b5d60-c7d8-4a66-b46e-bca44c2a6b75","facilityId":"8607658f-0f85-4768-9ccf-418be17b23c6","field":"critical_it_mw","value":"1000","asOf":null,"sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T12:36:00.606Z"},"record":{"id":"c96a3f3c-d087-43be-8646-5193983a2ade","facilityId":"8607658f-0f85-4768-9ccf-418be17b23c6","field":"record","value":"Crusoe Childress Campus","asOf":null,"sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T12:36:00.606Z"},"status":{"id":"45cd7672-0adb-464f-894a-06b0217e541f","facilityId":"8607658f-0f85-4768-9ccf-418be17b23c6","field":"status","value":"planned","asOf":null,"sourceUrl":"https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T12:36:00.606Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Crusoe Childress Campus","url":"https://registry.deploy.report/datacenters/facilities/crusoe-childress-tx-campus","address":{"@type":"PostalAddress","addressLocality":"Childress"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Crusoe"}]}}