{"id":"5b317269-3055-468f-8123-92b064d757c0","slug":"corescientific-denton-county-tx","name":"Denton 1","aliases":[],"operatorCompanyId":"9c495c76-08a8-4b58-85d8-45072060a018","parentCampusId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","lat":null,"lng":null,"streetAddress":null,"locationId":"34b93cd9-89b8-461f-b2d7-913c3ce36337","status":"operating","facilityType":"crypto_hpc","criticalItMw":null,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://corescientific.com/high-density-data-centers/"}],"notes":null,"createdAt":"2026-08-19T03:32:25.945Z","updatedAt":"2026-08-29T22:05:28.991Z","operator":{"name":"Core Scientific","slug":"core-scientific"},"parentCampus":{"id":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","slug":"core-scientific-coreweave-denton-texas","name":"Core Scientific / CoreWeave Denton HPC Campus","aliases":["Core Scientific Denton","CoreWeave Denton TX"],"locationId":"34b93cd9-89b8-461f-b2d7-913c3ce36337","lat":null,"lng":null,"locationPrecision":null,"landStatus":"brownfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Former Core Scientific bitcoin site being converted/expanded to host CoreWeave GPU HPC under a 12-year lease (two five-year renewal options). Feb 2025 amendment added ~70 MW, bringing full critical IT load at Denton to roughly 260 MW; part of CoreWeave's ~590 MW total across six Core Scientific sites in the FY2024 10-K. Powered by Denton Municipal Electric within ERCOT. Energized MW to date not separately disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm","date":"2025-02-26","title":"Core Scientific, Inc. Form 10-K FY2024","publisher":"SEC EDGAR"},{"url":"https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site","date":"2025-02-26","title":"Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site","publisher":"Core Scientific"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:56.339Z","updatedAt":"2026-08-17T20:26:23.715Z","parties":[{"id":"83728b2e-d69f-4bba-bd54-e4919d66d4be","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","companyId":null,"externalName":"CoreWeave, Inc.","role":"offtaker","structureNotes":"Ticker CRWV; 12-year HPC hosting lease, $1.2B expansion value","createdAt":"2026-08-17T20:22:58.781Z","company":null},{"id":"dbeb8efc-de6b-41a0-8e4c-ad553af2f00a","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","companyId":null,"externalName":"Denton Municipal Electric","role":"utility","structureNotes":"ERCOT","createdAt":"2026-08-17T20:22:59.536Z","company":null},{"id":"9e5a5eb3-fcd4-423d-a85f-ced8d19c7238","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","companyId":"9c495c76-08a8-4b58-85d8-45072060a018","externalName":"Core Scientific, Inc.","role":"operator","structureNotes":"Ticker CORZ; host/landlord","createdAt":"2026-08-17T20:22:57.938Z","company":{"id":"9c495c76-08a8-4b58-85d8-45072060a018","name":"Core Scientific","slug":"core-scientific"}}],"financialClaims":[],"metricClaims":[{"id":"97e74ecb-e5a6-44a5-a36a-3e60ae10b84c","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","metricType":"capex_usd","valueNumeric":104000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility core-scientific-denton-texas","createdAt":"2026-08-18T14:48:43.567Z"}],"powerProjects":[{"id":"6603e575-7ee7-4d0e-a3b2-e7010a9052fb","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","name":"Denton Municipal Electric grid supply","type":"grid_interconnect","capacityGw":0.26,"lifecycleState":"under_construction","sourceUrl":"https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm","evidenceTier":"verified","note":"Denton Lease Amendment for additional land and access to power","createdAt":"2026-08-17T20:22:57.562Z"}],"capacityClaims":[{"id":"8809a917-717f-45be-8e9f-0ea0b1ec9a5a","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","series":"contracted","valueGw":0.26,"asOf":"2025-02-26T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"~260 MW full critical IT load at Denton; latest amendment added 70 MW","createdAt":"2026-08-17T20:22:57.037Z"}],"events":[{"id":"caa3ecda-9140-4748-a9fb-8c2f0b3775de","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Denton Municipal Electric","occurredAt":"2026-08-17T20:22:59.920Z","createdAt":"2026-08-17T20:22:59.920Z"},{"id":"cf3041cc-f1e9-4e5a-bc38-35526f99271b","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"offtaker: CoreWeave, Inc.","occurredAt":"2026-08-17T20:22:59.156Z","createdAt":"2026-08-17T20:22:59.156Z"},{"id":"32009cb2-9665-4f32-9386-5fbe4916b75b","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Core Scientific, Inc.","occurredAt":"2026-08-17T20:22:58.322Z","createdAt":"2026-08-17T20:22:58.322Z"},{"id":"2de51486-6999-40f0-8e35-219f00f04792","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"0.26","claimId":"8809a917-717f-45be-8e9f-0ea0b1ec9a5a","detail":null,"occurredAt":"2026-08-17T20:22:57.337Z","createdAt":"2026-08-17T20:22:57.337Z"},{"id":"e50b744b-8a34-4f65-ba3d-d7902abdd16f","dataCenterId":"de9b52ad-720d-4e9d-bbee-7fdc72adc5e2","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"0.26","claimId":"8809a917-717f-45be-8e9f-0ea0b1ec9a5a","detail":"verified · sec_filing","occurredAt":"2026-08-17T20:22:57.189Z","createdAt":"2026-08-17T20:22:57.189Z"}]},"location":{"name":"Denton","slug":"denton-texas","kind":"city","lat":33.1838787,"lng":-97.1413417},"evidence":[{"id":"9bedde2b-f3d7-41b9-93c2-9893ff49289d","facilityId":"5b317269-3055-468f-8123-92b064d757c0","field":"record","value":"Denton 1","asOf":null,"sourceUrl":"https://corescientific.com/high-density-data-centers/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:32:26.337Z"},{"id":"70e67600-5bae-4388-a0d9-6c6f64fe2723","facilityId":"5b317269-3055-468f-8123-92b064d757c0","field":"status","value":"operating","asOf":null,"sourceUrl":"https://corescientific.com/high-density-data-centers/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:32:26.337Z"}],"resolved_facts":{"record":{"id":"9bedde2b-f3d7-41b9-93c2-9893ff49289d","facilityId":"5b317269-3055-468f-8123-92b064d757c0","field":"record","value":"Denton 1","asOf":null,"sourceUrl":"https://corescientific.com/high-density-data-centers/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:32:26.337Z"},"status":{"id":"70e67600-5bae-4388-a0d9-6c6f64fe2723","facilityId":"5b317269-3055-468f-8123-92b064d757c0","field":"status","value":"operating","asOf":null,"sourceUrl":"https://corescientific.com/high-density-data-centers/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:32:26.337Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Denton 1","url":"https://registry.deploy.report/datacenters/facilities/corescientific-denton-county-tx","address":{"@type":"PostalAddress","addressLocality":"Denton"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Core Scientific"}]}}