{"id":"5fcab939-95bb-45dd-8828-a530e6feea38","slug":"envision-galaxy-ulanqab-china","name":"Envision Galaxy Campus","aliases":[],"locationId":"577ee934-a104-463b-a36d-099a1a1f505e","lat":41.0006,"lng":113.1155,"locationPrecision":"city","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"solar_storage","interconnectionQueueStatus":"Supplied directly from dedicated renewables rather than through a queue: Envision pairs the campus with its own wind and solar generation, transmission and large-scale storage, managed by its AI Power System to hold supply against the compute load. Inner Mongolia's wind and solar resource is the reason the site is there.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"other","waterSourceNotes":"Not published. The commissioning announcement covers power in detail, naming dedicated renewable generation, transmission and large-scale storage, and says nothing at all about cooling method, water source or volume.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Green-tech firm Envision Energy commissioned what it calls the world's largest single AI data center building at its Galaxy Campus in Ulanqab, Inner Mongolia (announced 6 Aug 2026), powered by on-site wind/solar plus storage as part of its 'Mission Gobi' program. Envision claims the campus can scale beyond 2GW and eventually house up to one million AI accelerators, but only an initial building is commissioned and the full capacity is still being built out. Chinese-sourced capacity figures are frequently inflated and unverified by independent utility/permit data, so the 2GW figure is treated as a company claim.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://interestingengineering.com/energy/envision-galaxy-campus-million-ai-accelerators-renewable-power","title":"China commissions world's largest data center campus built for 2 GW, 1M accelerators","sourceName":"Interesting Engineering"},{"url":"https://www.techtimes.com/articles/323410/20260806/envision-commissions-worlds-largest-ai-data-center-building-using-site-renewables.htm","title":"Envision Commissions World's Largest AI Data Center Building Using On-Site Renewables","sourceName":"Tech Times"},{"url":"http://www.prnewswire.com/news-releases/envision-commissions-galaxy-campus-in-ulanqab-establishing-a-new-model-for-gigawatt-scale-ai-infrastructure-302844834.html","title":"Envision Commissions Galaxy Campus in Ulanqab, Establishing a New Model for Gigawatt-Scale AI Infrastructure","sourceName":"PR Newswire"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:08.355Z","updatedAt":"2026-08-28T19:36:00.568Z","location":{"id":"577ee934-a104-463b-a36d-099a1a1f505e","name":"Ulanqab","slug":"ulanqab-inner-mongolia","kind":"city","parentLocationId":"1e62256a-73d0-407b-a80c-6e6afb939fb0","region":"Indiana","lat":41.0006,"lng":113.1155,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:12:07.981Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"99fa965b-6e55-4968-ac09-3aada6342e92","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","companyId":null,"externalName":"Envision Energy","role":"developer","structureNotes":"Chinese green-tech / wind-turbine company; part of its 'Mission Gobi' 5GW green-computing initiative.","createdAt":"2026-08-17T18:12:09.580Z","company":null}],"capacityClaims":[{"id":"ef53db6f-b743-4238-a419-14a3bcb23c36","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","series":"announced","valueGw":2,"asOf":"2026-08-06T00:00:00.000Z","sourceUrl":"https://interestingengineering.com/energy/envision-galaxy-campus-million-ai-accelerators-renewable-power","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Company claim of scaling beyond 2GW / up to 1M AI accelerators; only an initial building commissioned. Chinese figures often inflated - provenance is an Envision announcement, not independent utility/permit data.","createdAt":"2026-08-17T18:12:09.050Z"},{"id":"6f5d5cd3-b1f8-40dd-9e06-bfc64133c2a6","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","series":"energized","valueGw":0.12,"asOf":"2026-08-06T00:00:00.000Z","sourceUrl":"https://www.energyconnects.com/news/renewables/2026/august/chinese-renewable-energy-giant-envision-launches-data-center/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Initial 120 MW phase commissioned, allocated to two local tech firms.","createdAt":"2026-08-19T00:14:55.108Z"}],"financialClaims":[],"metricClaims":[{"id":"8f32e04d-424f-4244-8dd7-8d667fbade3a","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","metricType":"gpu_count","valueNumeric":1000000,"valueText":"Up to 1 million AI accelerators at full buildout (marketed max)","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/envision-commissions-galaxy-campus-in-ulanqab-establishing-a-new-model-for-gigawatt-scale-ai-infrastructure-302844834.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:14:56.784Z"}],"powerProjects":[{"id":"46cbef06-7a73-4665-9478-222002eb27ac","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","name":"On-site wind supply (dedicated transmission)","type":"wind","capacityGw":null,"lifecycleState":"energized","sourceUrl":"https://www.energyconnects.com/news/renewables/2026/august/chinese-renewable-energy-giant-envision-launches-data-center/","evidenceTier":"reported","note":"~80% of campus power from nearby wind farms via dedicated transmission cables; site-specific capacity not disclosed.","createdAt":"2026-08-19T00:14:55.642Z"},{"id":"e2d75c61-7b29-4635-aac0-d28de2afba91","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","name":"On-site solar","type":"solar","capacityGw":null,"lifecycleState":"energized","sourceUrl":"https://www.prnewswire.com/news-releases/envision-commissions-galaxy-campus-in-ulanqab-establishing-a-new-model-for-gigawatt-scale-ai-infrastructure-302844834.html","evidenceTier":"verified","note":"Part of on-site renewable mix; capacity not disclosed.","createdAt":"2026-08-19T00:14:56.023Z"},{"id":"174b43b2-1613-40c5-ae20-9949589f4322","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","name":"Battery energy storage","type":"storage","capacityGw":null,"lifecycleState":"energized","sourceUrl":"https://www.prnewswire.com/news-releases/envision-commissions-galaxy-campus-in-ulanqab-establishing-a-new-model-for-gigawatt-scale-ai-infrastructure-302844834.html","evidenceTier":"verified","note":"Large-scale battery storage as backup within Envision 'AI Power System'; capacity not disclosed.","createdAt":"2026-08-19T00:14:56.399Z"}],"facilities":[],"incidents":[],"events":[{"id":"ee045145-7357-46a3-8b7b-14c0665451f7","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.12","claimId":"6f5d5cd3-b1f8-40dd-9e06-bfc64133c2a6","detail":null,"occurredAt":"2026-08-19T00:14:55.412Z","createdAt":"2026-08-19T00:14:55.412Z"},{"id":"a1be057f-bba2-44b6-9242-ea491c9bf362","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.12","claimId":"6f5d5cd3-b1f8-40dd-9e06-bfc64133c2a6","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:14:55.260Z","createdAt":"2026-08-19T00:14:55.260Z"},{"id":"2a966fcd-160f-4cf7-83f6-83d32390116f","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Envision Energy","occurredAt":"2026-08-17T18:12:09.964Z","createdAt":"2026-08-17T18:12:09.964Z"},{"id":"9d8a02d0-d027-4dd1-baa5-6431dcbec487","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"2","claimId":"ef53db6f-b743-4238-a419-14a3bcb23c36","detail":null,"occurredAt":"2026-08-17T18:12:09.355Z","createdAt":"2026-08-17T18:12:09.355Z"},{"id":"4b0c276a-8349-4747-9605-c4d120dfc09a","dataCenterId":"5fcab939-95bb-45dd-8828-a530e6feea38","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"2","claimId":"ef53db6f-b743-4238-a419-14a3bcb23c36","detail":"claimed · press_release","occurredAt":"2026-08-17T18:12:09.202Z","createdAt":"2026-08-17T18:12:09.202Z"}],"capacity_picture":{"announced_gw":2,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.12,"announced_minus_energized_gw":1.88,"by_series":{"announced":{"valueGw":2,"asOf":"2026-08-06T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://interestingengineering.com/energy/envision-galaxy-campus-million-ai-accelerators-renewable-power"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.12,"asOf":"2026-08-06T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.energyconnects.com/news/renewables/2026/august/chinese-renewable-energy-giant-envision-launches-data-center/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Envision Galaxy Campus","url":"https://registry.deploy.report/datacenters/envision-galaxy-ulanqab-china","geo":{"@type":"GeoCoordinates","latitude":41.0006,"longitude":113.1155},"address":{"@type":"PostalAddress","addressLocality":"Ulanqab"}}}