{"id":"8848cb50-2254-4805-99ad-f2236513df2c","slug":"crusoe-tallgrass-project-jade-cheyenne","name":"Project Jade (Crusoe / Tallgrass) AI Data Center Campus","aliases":["Project Jade","Crusoe Cheyenne","Switchgrass Industrial Park data center"],"locationId":"80d28a1d-b9ab-48ad-a239-98871e8e68f9","lat":41.03713,"lng":-104.79753,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"permitted","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":"Bring your own power: the campus is paired with the Cheyenne Power Hub, a dedicated 2.7 GW gas plant Tallgrass is building beside it inside the same industrial park, so the compute build does not wait on new grid capacity.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"On-site deep groundwater wells drilled below the aquifers that supply Laramie County; closed-loop cooling to minimize consumption. Reported initial fill roughly equivalent to 20 households and ongoing annual use less than three households (Cowboy State Daily).","servingUtility":null,"acreage":600,"totalBuildingSqft":null,"streetAddress":null,"notes":"Crusoe's ~600-acre, five-building AI data center campus in the Switchgrass Industrial Park south of Cheyenne, approved by Laramie County commissioners 2026-01-05, with an initial 1.8 GW target scaling to 10 GW. Power is behind-the-meter from Tallgrass's co-located BFC Power / Cheyenne Power Hub (2.7 GW gas-fired generation) plus Bloom Energy fuel cells; Tallgrass provides CO2 capture. First buildings anticipated mid-2027; exact on-site coordinates not published.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","date":"2026-01-07","title":"Wyoming Approves Data Center Campus That Includes 2.7 GW of New Natural Gas-Fired Generation","publisher":"POWER Magazine"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-and-tallgrass-announce-ai-data-center-in-wyoming","date":"2025-07-24","title":"Crusoe and Tallgrass announce AI data center in Wyoming","publisher":"Crusoe"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:27.382Z","updatedAt":"2026-08-28T17:35:16.780Z","location":{"id":"80d28a1d-b9ab-48ad-a239-98871e8e68f9","name":"Cheyenne","slug":"cheyenne-wyoming","kind":"city","parentLocationId":"c9363513-cb8f-4c32-bf25-fe6843ae9a8c","region":"Wyoming","lat":41.139981,"lng":-104.820246,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:25:23.532Z","updatedAt":"2026-08-21T18:01:24.112Z"},"parties":[{"id":"4d423489-d9e8-4fde-9224-98754b2f21b5","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","companyId":null,"externalName":"Tallgrass Energy","role":"utility","structureNotes":"Builds BFC Power / Cheyenne Power Hub and CO2 sequestration hub","createdAt":"2026-08-17T20:25:30.187Z","company":null},{"id":"231e9533-9e4c-415b-b46a-797df59d6228","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","companyId":null,"externalName":"Blackstone Inc.","role":"financier","structureNotes":"Listed by Global Energy Monitor as parent/owner behind Tallgrass Energy on the BFC Power / Cheyenne Power Hub. Tracker-sourced.","createdAt":"2026-08-19T00:16:07.086Z","company":null},{"id":"8be68ffb-f62f-417e-a360-cb96dafcc528","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","companyId":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","externalName":"Crusoe Energy Systems","role":"developer","structureNotes":"Develops the AI data center campus","createdAt":"2026-08-17T20:25:29.426Z","company":{"id":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","name":"Crusoe","slug":"crusoe"}}],"capacityClaims":[{"id":"afee24f8-1176-4c5d-824d-4a052094c35e","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","series":"announced","valueGw":10,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Marketed ultimate scale-up ceiling; would be the largest single AI campus in the US if realized.","createdAt":"2026-08-19T00:16:02.736Z"},{"id":"f66e61f7-5ba0-471b-b4d1-5c8261ee1a3d","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","series":"announced","valueGw":1.8,"asOf":"2025-07-24T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-tallgrass-announce-ai-data-center-in-wyoming","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Initial phase 1.8 GW; designed to scale to 10 GW.","createdAt":"2026-08-17T20:25:28.068Z"}],"financialClaims":[{"id":"8ac2b160-c6b1-4c75-9734-0a3c15c0dd6e","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","kind":"capex","label":"Total campus capex (Crusoe/Project Jade)","valueUsd":"50000000000","capUsd":null,"conditions":"Reported as 'more than $50 billion' total capital expenditure across full build-out.","asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:16:03.266Z"},{"id":"4236f946-b106-4909-a05a-e7f06474c13d","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","kind":"capex","label":"Tallgrass energy infrastructure investment","valueUsd":"7000000000","capUsd":null,"conditions":"$7 billion for on-site natural gas power generation (BFC Power / Cheyenne Power Hub).","asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://cowboystatedaily.com/2026/01/08/huge-cheyenne-data-center-grows-to-2-7-gigawatts-nearly-triple-state-power-use/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:16:04.029Z"}],"metricClaims":[{"id":"b602ae5b-2c07-470c-8345-836c1bba7fe2","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","metricType":"capex_usd","valueNumeric":50000000000,"valueText":"more than $50 billion total campus capex","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:05.942Z"},{"id":"45edd253-1016-44a3-b2ab-a7b03e3a9f47","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","metricType":"cooling_type","valueNumeric":null,"valueText":"closed-loop cooling","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://cowboystatedaily.com/2026/01/08/huge-cheyenne-data-center-grows-to-2-7-gigawatts-nearly-triple-state-power-use/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:06.335Z"},{"id":"ed2ae944-ce28-42b9-b9ea-13d84ac2fc89","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","metricType":"jobs_construction","valueNumeric":5000,"valueText":"as many as 5,000 construction workers","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:05.558Z"}],"powerProjects":[{"id":"06840c19-0270-4366-bbaf-80e64ef9e153","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","name":"BFC Power / Cheyenne Power Hub","type":"gas","capacityGw":2.7,"lifecycleState":"permitted","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","evidenceTier":"reported","note":"2.7 GW natural gas-fired generation on 659 acres, built by Tallgrass; $7B investment.","createdAt":"2026-08-17T20:25:28.602Z"},{"id":"3060dbb6-0201-46eb-a1fd-abbc6cb032eb","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","name":"Bloom Energy fuel cells","type":"other","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","evidenceTier":"reported","note":"Fuel cells cited in bring-your-own-power model; capacity unspecified.","createdAt":"2026-08-17T20:25:29.048Z"},{"id":"5ae22808-0ff2-4e63-b80e-f361896c4e55","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","name":"BFC Power and Cheyenne Power Hub","type":"gas","capacityGw":2.7,"lifecycleState":"permitted","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","evidenceTier":"reported","note":"2.7 GW new on-site natural gas generation dedicated to the campus; per Global Energy Monitor configured as two ~1,350 MW combined-cycle units plus aeroderivative turbines. Laramie County site plan approved 2026-01-05; developed by Tallgrass Energy; CO2 sequestration reported up to ~10.6M metric tons/yr. GEM status: pre-construction.","createdAt":"2026-08-19T00:16:04.794Z"},{"id":"ef876a2e-38eb-44fa-94a0-5b421226a79b","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","name":"Bloom Energy fuel cell yard","type":"other","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/","evidenceTier":"reported","note":"Bloom Energy fuel cells cited as supplemental on-site generation alongside gas turbines.","createdAt":"2026-08-19T00:16:05.172Z"}],"facilities":[{"slug":"crusoe-cheyenne-wy-jade","name":"Crusoe Cheyenne (\"Jade\") Campus","status":"planned","criticalItMw":null,"facilityType":"hyperscale"},{"slug":"project-jade-crusoe-laramie-county-wy","name":"Project Jade","status":"under_construction","criticalItMw":null,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"2324bb73-d5d6-4e12-a6a8-bf5babb1f537","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Blackstone Inc.","occurredAt":"2026-08-19T00:16:07.474Z","createdAt":"2026-08-19T00:16:07.474Z"},{"id":"d7112966-1c55-427b-97fd-8cf07e75effb","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Tallgrass energy infrastructure investment","occurredAt":"2026-08-19T00:16:04.409Z","createdAt":"2026-08-19T00:16:04.409Z"},{"id":"34013377-e06c-479a-a616-110c9ee24a5e","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Total campus capex (Crusoe/Project Jade)","occurredAt":"2026-08-19T00:16:03.652Z","createdAt":"2026-08-19T00:16:03.652Z"},{"id":"72d22bb6-ca85-4a19-aaf2-707fb74001ff","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","eventType":"capacity_changed","series":"announced","oldValue":"1.8","newValue":"10","claimId":"afee24f8-1176-4c5d-824d-4a052094c35e","detail":null,"occurredAt":"2026-08-19T00:16:03.044Z","createdAt":"2026-08-19T00:16:03.044Z"},{"id":"5c0eec92-dfae-426b-864a-b19ca19ea72d","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"10","claimId":"afee24f8-1176-4c5d-824d-4a052094c35e","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:16:02.891Z","createdAt":"2026-08-19T00:16:02.891Z"},{"id":"3ae72158-94b9-4027-8965-c3e06810e4fe","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Tallgrass Energy","occurredAt":"2026-08-17T20:25:30.566Z","createdAt":"2026-08-17T20:25:30.566Z"},{"id":"a7aa3564-18cf-46c8-a32e-97ed4c6fdd29","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Crusoe Energy Systems","occurredAt":"2026-08-17T20:25:29.808Z","createdAt":"2026-08-17T20:25:29.808Z"},{"id":"22b9c573-84b6-4083-af15-f64c87e0f97c","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.8","claimId":"f66e61f7-5ba0-471b-b4d1-5c8261ee1a3d","detail":null,"occurredAt":"2026-08-17T20:25:28.375Z","createdAt":"2026-08-17T20:25:28.375Z"},{"id":"10fa9805-05f4-4c97-ab20-1f661d96a223","dataCenterId":"8848cb50-2254-4805-99ad-f2236513df2c","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.8","claimId":"f66e61f7-5ba0-471b-b4d1-5c8261ee1a3d","detail":"reported · press_release","occurredAt":"2026-08-17T20:25:28.220Z","createdAt":"2026-08-17T20:25:28.220Z"}],"capacity_picture":{"announced_gw":10,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":10,"by_series":{"announced":{"valueGw":10,"asOf":"2026-01-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Project Jade (Crusoe / Tallgrass) AI Data Center Campus","url":"https://registry.deploy.report/datacenters/crusoe-tallgrass-project-jade-cheyenne","geo":{"@type":"GeoCoordinates","latitude":41.03713,"longitude":-104.79753},"address":{"@type":"PostalAddress","addressLocality":"Cheyenne"}}}