{"id":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","slug":"crusoe-abilene-microsoft-campus","name":"Crusoe Abilene Microsoft AI Factory Campus","aliases":["Crusoe Microsoft Abilene","Crusoe Abilene 900 MW Microsoft campus","Crusoe Abilene Microsoft expansion","Crusoe Microsoft Abilene 900 MW","Crusoe Abilene behind-the-meter campus","Microsoft Crusoe Abilene AI factory"],"locationId":"4495a090-7118-4c79-8522-882b737dd11c","lat":32.45,"lng":-99.73,"locationPrecision":"city","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":"2027-07-01T00:00:00.000Z","dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Crusoe closed-loop non-evaporative liquid cooling systems (company) ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)).","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"New Crusoe-dedicated AI factory campus in Abilene, Texas, supporting Microsoft AI workloads. Crusoe (Mar 27, 2026) describes a 900 MW site with two buildings (each designed for 336 MW critical IT load) plus a 900 MW behind-the-meter on-site power plant with MV BESS, adjacent to Crusoe's existing Abilene / Stargate infrastructure; combined Abilene projection ~2.1 GW. Land clearing and site preparation underway; first building targeted to energize mid-2027. Closed-loop non-evaporative liquid cooling claimed. Distinct from crusoe-abilene-ai-data-center / stargate-abilene (Oracle/OpenAI).","keyFacts":[{"label":"Operator / developer","value":"Crusoe ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))"},{"label":"Named tenant / customer","value":"Microsoft (large-scale AI workloads; Microsoft Cloud Operations & Innovation president quoted in Crusoe release) ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))"},{"label":"Location","value":"Abilene, Texas; adjacent to Crusoe's existing Abilene AI factory infrastructure ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))"},{"label":"Lifecycle / timeline","value":"Land clearing and site preparation underway at announcement (Mar 27, 2026); first building expected to energize mid-2027 ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))"},{"label":"Announced campus capacity","value":"900 MW campus (two buildings); each building designed for 336 MW critical IT load; combined with existing Abilene infrastructure projected ~2.1 GW ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))"},{"label":"On-site power","value":"900 MW behind-the-meter on-site power plant paired with medium-voltage BESS for operational reliability and grid resilience ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))"},{"label":"Cooling","value":"Closed-loop non-evaporative liquid cooling (company) ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))"},{"label":"Adjacent Abilene context","value":"Company: first Abilene project was two 100 MW buildings energized in under a year; second phase adds six buildings toward 1.2 GW by end of 2026 on the existing campus next door ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))"},{"label":"Jobs (company claim)","value":"Thousands of additional construction and hundreds of permanent jobs expected in the Abilene region (company) ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure))"},{"label":"Related campuses","value":"Adjacent to / distinct from [Crusoe Abilene AI Data Center (Stargate Site 1)](/datacenters/crusoe-abilene-ai-data-center) and [Stargate Abilene](/datacenters/stargate-abilene) (Oracle/OpenAI)."}],"reviewStatus":"reviewed","sources":[{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","title":"Crusoe Announces New 900 MW AI Factory Campus in Abilene, Texas to Support Microsoft AI Infrastructure","sourceName":"Crusoe"},{"url":"https://www.datacenterknowledge.com/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft","title":"Crusoe Expands Abilene AI Campus With New 900 MW AI Factory for Microsoft","sourceName":"Data Center Knowledge"}],"reviewNote":null,"createdAt":"2026-09-27T05:17:37.833Z","updatedAt":"2026-09-28T02:44:13.676Z","location":{"id":"4495a090-7118-4c79-8522-882b737dd11c","name":"Abilene","slug":"abilene-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":32.45,"lng":-99.73,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T17:02:31.623Z","updatedAt":"2026-08-21T17:59:09.251Z"},"parties":[{"id":"96ed67bc-1669-40b5-8098-64228ab7ec4b","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","companyId":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","externalName":null,"role":"developer","structureNotes":"Builds and operates the new Abilene Microsoft AI factory campus.","createdAt":"2026-09-27T05:17:39.455Z","company":{"id":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","name":"Crusoe","slug":"crusoe"}},{"id":"ac44d983-9fe3-4b57-b8a8-a04efcb2ada1","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","companyId":"b8670b58-67f2-4b87-9b46-9e16588dc1e6","externalName":null,"role":"tenant","structureNotes":"Named customer for large-scale AI workloads at the new campus.","createdAt":"2026-09-27T05:17:40.212Z","company":{"id":"b8670b58-67f2-4b87-9b46-9e16588dc1e6","name":"Microsoft","slug":"microsoft"}},{"id":"3087ec3b-1453-4f76-a584-358de536b475","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","companyId":null,"externalName":"ERCOT","role":"grid_operator","structureNotes":"Campus sits in the ERCOT footprint (registry gridOperator).","createdAt":"2026-09-27T12:41:17.030Z","company":null}],"capacityClaims":[{"id":"95d5ea57-605e-4924-9297-823bdf1ea06d","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","series":"announced","valueGw":0.9,"asOf":"2026-03-27T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","sourceType":"company","evidenceTier":"claimed","supersedesId":null,"note":"Crusoe: new dedicated 900 MW Microsoft campus adjacent to existing Abilene infrastructure.","createdAt":"2026-09-27T05:17:38.915Z"}],"financialClaims":[],"metricClaims":[{"id":"15a10251-1bf9-49b7-86d4-3dce0a5081c6","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","metricType":"cooling_type","valueNumeric":null,"valueText":"closed-loop non-evaporative liquid cooling","unit":null,"grantingJurisdiction":null,"asOf":"2026-03-27T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","sourceType":"company","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:15.105Z"}],"powerProjects":[{"id":"dd98b2d9-1b8d-469b-8b4d-2f9b3911692c","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","name":"Abilene Microsoft campus behind-the-meter plant","type":"other","capacityGw":0.9,"lifecycleState":"announced","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","evidenceTier":"claimed","note":"Crusoe: 900 MW behind-the-meter on-site power plant with MV BESS. Primary release does not name the fuel mix; typed as other.","createdAt":"2026-09-27T12:41:15.843Z"},{"id":"ba3529f2-cc4c-4f7b-bab3-c3364132cae3","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","name":"Abilene Microsoft campus MV BESS","type":"other","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure","evidenceTier":"claimed","note":"Medium-voltage battery energy storage paired with the on-site plant.","createdAt":"2026-09-27T12:41:16.244Z"}],"facilities":[{"slug":"crusoe-abilene-ii-microsoft-tx","name":"Crusoe Abilene II AI Factory Campus (Microsoft)","status":"under_construction","criticalItMw":null,"facilityType":"hyperscale"},{"slug":"crusoe-abilene-tx-second-campus-900mw","name":"Crusoe Abilene Second Campus","status":"planned","criticalItMw":900,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"a74ac112-8fdb-4e05-80b6-b686e69db5ff","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: ERCOT","occurredAt":"2026-09-27T12:41:17.409Z","createdAt":"2026-09-27T12:41:17.409Z"},{"id":"b0df05fc-7caa-4638-9304-14602d75d206","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:cooling_type","occurredAt":"2026-09-27T12:41:15.476Z","createdAt":"2026-09-27T12:41:15.476Z"},{"id":"5197f707-70d6-40f7-95ff-09b81cac9a97","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: b8670b58-67f2-4b87-9b46-9e16588dc1e6","occurredAt":"2026-09-27T05:17:40.595Z","createdAt":"2026-09-27T05:17:40.595Z"},{"id":"aeaa1316-e3f3-42fd-bf3d-71e7ec1a13ac","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","occurredAt":"2026-09-27T05:17:39.834Z","createdAt":"2026-09-27T05:17:39.834Z"},{"id":"a1991189-6ed1-4061-b13b-7ea500a31a48","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.9","claimId":"95d5ea57-605e-4924-9297-823bdf1ea06d","detail":null,"occurredAt":"2026-09-27T05:17:39.226Z","createdAt":"2026-09-27T05:17:39.226Z"},{"id":"898585c6-cb36-4093-b77c-584ccf2861a8","dataCenterId":"d7e72a52-2394-4b8e-9583-dcabc8fa0f7d","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.9","claimId":"95d5ea57-605e-4924-9297-823bdf1ea06d","detail":"claimed · company","occurredAt":"2026-09-27T05:17:39.072Z","createdAt":"2026-09-27T05:17:39.072Z"}],"capacity_picture":{"announced_gw":0.9,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.9,"by_series":{"announced":{"valueGw":0.9,"asOf":"2026-03-27T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Crusoe Abilene Microsoft AI Factory Campus","url":"https://registry.deploy.report/datacenters/crusoe-abilene-microsoft-campus","geo":{"@type":"GeoCoordinates","latitude":32.45,"longitude":-99.73},"address":{"@type":"PostalAddress","addressLocality":"Abilene"}}}