{"id":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","slug":"coreweave-galaxy-helios-afton-texas","name":"Galaxy Helios Campus (CoreWeave)","aliases":[],"locationId":"7dbdf9ef-e452-4842-b2e2-67d67d1303d4","lat":33.7814083,"lng":-100.8790507,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":"Approved and studied, the clearest queue position on this list: Galaxy announced on 15 January 2026 that it had completed ERCOT's Large Load Interconnection Study and secured a further 830 MW, doubling approved capacity to more than 1.6 GW. Wind Energy Transmission Texas is the transmission interconnection provider and AEP Texas the utility service provider. Initial power was targeted for early 2026.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Closed loop, recirculating internally. Galaxy has put a figure of roughly 3,000 gallons a day per building on the same design at its McGregor campus, which it describes as built like Helios; no separate published figure exists for Helios itself.","servingUtility":null,"acreage":2200,"totalBuildingSqft":null,"streetAddress":null,"notes":"Galaxy Digital's Helios campus in Dickens County (near Afton, West Texas) is fully leased to CoreWeave under a 15-year agreement and is CoreWeave's largest US AI footprint. Galaxy holds over 1.6 GW of ERCOT-approved, utility-contracted grid capacity; Phase I delivered ~200 MW gross / 133 MW of critical IT load to CoreWeave in Q2 2026. CoreWeave has committed to 526 MW of critical IT load (800 MW gross) across Phases I-III.","keyFacts":[{"label":"Operator / landlord","value":"Galaxy Digital Inc. develops and operates Helios; CoreWeave is the tenant under long-term leases ([Galaxy PR, Jul 6 2026](https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html))","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html"},{"label":"Phase I delivered","value":"Phase I complete on schedule: about 200 MW gross / 133 MW critical IT load delivered to CoreWeave; rent commencement in Q2 2026 ([Galaxy PR](https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html))","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html"},{"label":"CoreWeave contracted load (Phases I–III)","value":"526 MW critical IT load (800 MW gross currently approved/contracted) under 15-year leases with two 5-year extension options; Galaxy states expected >$1B average annual revenue across those phases ([Galaxy PR](https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html))","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html"},{"label":"Phase II","value":"Greenfield development underway on 260 MW critical IT Phase II; data-hall deliveries expected to commence H1 2027 ([Galaxy PR](https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html))","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html"},{"label":"Approved campus power","value":"Total approved power capacity expanded to about 1.63 GW, with company-stated potential to scale as high as 3.6 GW; campus spans more than 2,200 acres in West Texas ([Galaxy PR](https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html))","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html"},{"label":"Grid","value":"ERCOT interconnection; prior Galaxy release described approval for additional 830 MW bringing total approved capacity over 1.6 GW ([Galaxy PR](https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html))","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html","title":"Galaxy Completes ERCOT Interconnection Studies and Secures Approval for Additional 830 MW at Helios, Doubling Total to over 1.6 GW","sourceName":"PR Newswire / Galaxy Digital"},{"url":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","title":"Galaxy Completes Phase I of Helios, Delivering 133 MW of Critical IT Load to CoreWeave","sourceName":"PR Newswire / Galaxy Digital"},{"url":"https://www.datacenterdynamics.com/en/news/galaxy-digital-closes-14bn-debt-facility-for-helios-data-center-campus-in-texas/","title":"Galaxy Digital closes $1.4bn debt facility for Helios data center campus in Texas","sourceName":"DataCenterDynamics"},{"url":"https://www.everythinglubbock.com/news/local-news/massive-3-5-billion-expansion-planned-at-ai-data-center-in-dickens-county/","title":"$3.5B Permits Filed for Galaxy Helios Data Center Phase 2","sourceName":"EverythingLubbock"},{"url":"https://www.datacenterknowledge.com/data-center-construction/galaxy-s-500-acre-texas-ai-campus-reflects-new-grid-model","title":"Galaxy's 500-Acre Texas AI Campus Reflects New Grid Model","sourceName":"Data Center Knowledge"},{"url":"https://www.gem.wiki/Helios_facility","title":"Helios facility","sourceName":"Global Energy Monitor"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:20.017Z","updatedAt":"2026-09-28T04:25:34.581Z","location":{"id":"7dbdf9ef-e452-4842-b2e2-67d67d1303d4","name":"Afton","slug":"afton-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":33.7361,"lng":-100.7734,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:12:19.642Z","updatedAt":"2026-08-21T17:59:12.603Z"},"parties":[{"id":"6b42b336-29c7-45ef-8fb0-24cff75f0ca6","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","companyId":null,"externalName":"ERCOT","role":"grid_operator","structureNotes":"Grid interconnection approved via ERCOT LLIS process.","createdAt":"2026-08-17T18:12:26.796Z","company":null},{"id":"ed6c1a72-60c7-46fd-90c8-64962aa2f21c","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","companyId":null,"externalName":"NVIDIA","role":"chip_supplier","structureNotes":"CoreWeave AI infrastructure is NVIDIA GPU-based (supplier to tenant).","createdAt":"2026-08-17T18:12:27.574Z","company":null},{"id":"21e2ba6b-fb5e-461e-b477-2ba412de5bd5","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","companyId":"bbe9b1f3-f6d8-4690-9f60-859bc3a47049","externalName":"Galaxy Digital","role":"developer","structureNotes":"Owns and develops the Helios campus (former Bitcoin-mining site converted to AI); leases 100% to CoreWeave.","createdAt":"2026-08-17T18:12:26.018Z","company":{"id":"bbe9b1f3-f6d8-4690-9f60-859bc3a47049","name":"Galaxy Digital","slug":"galaxy-digital"}},{"id":"c748fdb2-1a0d-4f55-ab37-bcac3c7aac9d","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","companyId":"da8eb3b3-8b7c-41f0-96cc-9f700a57bfca","externalName":"CoreWeave","role":"tenant","structureNotes":"Sole tenant under 15-year lease; the campus is CoreWeave's largest US AI footprint.","createdAt":"2026-08-17T18:12:25.253Z","company":{"id":"da8eb3b3-8b7c-41f0-96cc-9f700a57bfca","name":"CoreWeave","slug":"coreweave"}}],"capacityClaims":[{"id":"c3c0c0ac-1a4b-4c63-a2b5-7dcdc7975c32","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"announced","valueGw":1.63,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Total approved power capacity at Helios; company states it may scale to as much as 3.6 GW","createdAt":"2026-08-19T01:33:46.760Z"},{"id":"a7741d59-da0c-4043-a998-5434c8d71bce","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"announced","valueGw":1.6,"asOf":"2026-01-31T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html","sourceType":"utility_filing","evidenceTier":"verified","supersedesId":null,"note":"ERCOT LLIS-complete, approved and utility-contracted grid capacity (not yet energized); long-term expansion potential cited up to 3.5 GW.","createdAt":"2026-08-17T18:12:20.698Z"},{"id":"4bd8ff3b-50d7-476c-8085-69a501e19a50","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"contracted","valueGw":0.8,"asOf":"2026-05-31T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"CoreWeave lease Phases I-III: 800 MW gross / 526 MW critical IT load committed.","createdAt":"2026-08-17T18:12:21.548Z"},{"id":"cd2b3156-37d2-4386-8255-b10681afec22","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"energized","valueGw":0.133,"asOf":"2026-05-31T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Phase I delivered ~200 MW gross / 133 MW critical IT load; rent commenced Q2 2026.","createdAt":"2026-08-17T18:12:22.375Z"},{"id":"fadf0bef-5d72-4dcc-947f-03f4de1b07e2","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","series":"under_construction","valueGw":0.26,"asOf":"2027-06-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Phase II: 260 MW critical IT under greenfield development; data hall deliveries expected H1 2027","createdAt":"2026-08-19T01:33:47.447Z"}],"financialClaims":[{"id":"e537d8c3-321e-4287-9bc3-00cb604be7e0","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","kind":"lease_term","label":"CoreWeave 15-year lease, >$1B average annual revenue","valueUsd":"1000000000","capUsd":null,"conditions":"Average annual revenue over lease term across full 800 MW gross Phase I-III arrangement","asOf":"2026-05-31T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html","sourceType":"press_release","evidenceTier":"reported","createdAt":"2026-08-17T18:12:23.733Z"},{"id":"8d41f103-6931-4c3f-9f46-c9e463203970","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","kind":"capex","label":"Phase 2 expansion permits filed","valueUsd":"3500000000","capUsd":null,"conditions":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.everythinglubbock.com/news/local-news/massive-3-5-billion-expansion-planned-at-ai-data-center-in-dickens-county/","sourceType":"permit","evidenceTier":"reported","createdAt":"2026-08-17T18:12:24.486Z"},{"id":"7b8ed87d-15da-4804-a4d4-e28792932509","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","kind":"capex","label":"Helios Phase I debt facility","valueUsd":"1400000000","capUsd":null,"conditions":null,"asOf":"2025-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/galaxy-digital-closes-14bn-debt-facility-for-helios-data-center-campus-in-texas/","sourceType":"press_release","evidenceTier":"reported","createdAt":"2026-08-17T18:12:22.908Z"}],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"2df628ba-5395-4180-b7c7-652a09dc0a5f","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"party_linked","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: linked externalName \"CoreWeave\" to company coreweave","occurredAt":"2026-08-31T01:15:09.054Z","createdAt":"2026-08-31T01:15:09.054Z"},{"id":"13ee7053-595c-40b2-af4a-9de3644ac783","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.26","claimId":"fadf0bef-5d72-4dcc-947f-03f4de1b07e2","detail":null,"occurredAt":"2026-08-19T01:33:47.753Z","createdAt":"2026-08-19T01:33:47.753Z"},{"id":"928fdcaa-99a3-40ae-9a81-04ee4da56bb0","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.26","claimId":"fadf0bef-5d72-4dcc-947f-03f4de1b07e2","detail":"reported · press_release","occurredAt":"2026-08-19T01:33:47.600Z","createdAt":"2026-08-19T01:33:47.600Z"},{"id":"b20aec6d-8874-412b-93e8-66a3562e1d84","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.63","claimId":"c3c0c0ac-1a4b-4c63-a2b5-7dcdc7975c32","detail":"reported · press_release","occurredAt":"2026-08-19T01:33:46.915Z","createdAt":"2026-08-19T01:33:46.915Z"},{"id":"37d7e6db-9369-4343-9be8-c7b8d4fd89e1","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: NVIDIA","occurredAt":"2026-08-17T18:12:27.951Z","createdAt":"2026-08-17T18:12:27.951Z"},{"id":"a908704e-8809-42ca-8c0b-1c87199f13ac","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: ERCOT","occurredAt":"2026-08-17T18:12:27.180Z","createdAt":"2026-08-17T18:12:27.180Z"},{"id":"1eacfbb7-4458-4ad8-b215-84d87fa097a5","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Galaxy Digital","occurredAt":"2026-08-17T18:12:26.399Z","createdAt":"2026-08-17T18:12:26.399Z"},{"id":"d9c1c1d6-02ff-4d0b-aed2-545a62f3b4cb","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: CoreWeave","occurredAt":"2026-08-17T18:12:25.629Z","createdAt":"2026-08-17T18:12:25.629Z"},{"id":"2b21b47a-89de-43f9-b1ad-9858c23c2bd5","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Phase 2 expansion permits filed","occurredAt":"2026-08-17T18:12:24.871Z","createdAt":"2026-08-17T18:12:24.871Z"},{"id":"18fd37f8-82cb-45b0-8196-d7942a09583a","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"lease_term: CoreWeave 15-year lease, >$1B average annual revenue","occurredAt":"2026-08-17T18:12:24.111Z","createdAt":"2026-08-17T18:12:24.111Z"},{"id":"2f77f1d5-26b4-4f3c-b5fb-f42e487da06e","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Helios Phase I debt facility","occurredAt":"2026-08-17T18:12:23.350Z","createdAt":"2026-08-17T18:12:23.350Z"},{"id":"0df83236-e70c-499a-b86d-45a8ae0990fb","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.133","claimId":"cd2b3156-37d2-4386-8255-b10681afec22","detail":null,"occurredAt":"2026-08-17T18:12:22.679Z","createdAt":"2026-08-17T18:12:22.679Z"},{"id":"ef4ade7b-81bf-4a4b-a979-30f6324b5599","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.133","claimId":"cd2b3156-37d2-4386-8255-b10681afec22","detail":"reported · press_release","occurredAt":"2026-08-17T18:12:22.532Z","createdAt":"2026-08-17T18:12:22.532Z"},{"id":"56100b6f-209e-4d2e-951a-4b4bc6c43f10","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"0.8","claimId":"4bd8ff3b-50d7-476c-8085-69a501e19a50","detail":null,"occurredAt":"2026-08-17T18:12:21.850Z","createdAt":"2026-08-17T18:12:21.850Z"},{"id":"b75078fd-ef37-4dc9-ab7a-58607c98c147","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"0.8","claimId":"4bd8ff3b-50d7-476c-8085-69a501e19a50","detail":"reported · press_release","occurredAt":"2026-08-17T18:12:21.700Z","createdAt":"2026-08-17T18:12:21.700Z"},{"id":"c35c085e-7823-4200-bd4b-f2782e00e8db","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.6","claimId":"a7741d59-da0c-4043-a998-5434c8d71bce","detail":null,"occurredAt":"2026-08-17T18:12:21.019Z","createdAt":"2026-08-17T18:12:21.019Z"},{"id":"72d0af32-9e77-4477-932d-49e5063cd722","dataCenterId":"1c196dd2-f3bb-4512-ac6e-1fd594ad982e","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.6","claimId":"a7741d59-da0c-4043-a998-5434c8d71bce","detail":"verified · utility_filing","occurredAt":"2026-08-17T18:12:20.858Z","createdAt":"2026-08-17T18:12:20.858Z"}],"capacity_picture":{"announced_gw":1.6,"contracted_gw":0.8,"under_construction_gw":0.26,"energized_gw":0.133,"announced_minus_energized_gw":1.467,"by_series":{"announced":{"valueGw":1.6,"asOf":"2026-01-31T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html"},"contracted":{"valueGw":0.8,"asOf":"2026-05-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html"},"under_construction":{"valueGw":0.26,"asOf":"2027-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html"},"energized":{"valueGw":0.133,"asOf":"2026-05-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.prnewswire.com/news-releases/galaxy-completes-phase-i-of-its-helios-data-center-campus-delivering-133-megawatts-of-critical-it-load-to-coreweave-302818664.html"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Galaxy Helios Campus (CoreWeave)","url":"https://registry.deploy.report/datacenters/coreweave-galaxy-helios-afton-texas","geo":{"@type":"GeoCoordinates","latitude":33.7814083,"longitude":-100.8790507},"address":{"@type":"PostalAddress","addressLocality":"Afton"}}}