{"id":"a7e192d1-9871-47ea-941d-491df0e1a677","slug":"beacon-dove-creek-tom-green-texas","name":"Dove Creek Data Center (Beacon)","aliases":["Westline TX Holdings","Beacon Dove Creek"],"locationId":"8319a86d-16b7-4adb-8395-1fbbdb3fac81","lat":31.34977,"lng":-100.63943,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":"Self-generating, with the grid relationship unstated: the TCEQ air permit application, filed by Westline TX Holdings and linked to Beacon Data Centers, covers banks of reciprocating natural gas engines to supply the site's electricity. Neither the filing coverage nor the developer says whether any of that power touches the grid.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Off-grid; powered by on-site natural-gas reciprocating engines (RICE). ~1,240 acres of buildable land (est. 70% of total site). Facility sited 0.25 mi south of US 67 on FM 2335, west Tom Green County. Community concerns raised over water and power; water source not specified in permit reporting.","servingUtility":null,"acreage":1240,"totalBuildingSqft":null,"streetAddress":null,"notes":"Westline TX Holdings (linked to Beacon Data Centers) filed a TCEQ air-permit application (HAP93, 184380, PSDTX1710, GHGPSDTX275) in Aug 2026 for a multi-gigawatt data center on FM 2335 south of US 67 in Tom Green County, powered by on-site natural-gas reciprocating engines. Exact planned MW/GW is not publicly stated; Tom Green County commissioners rejected a moratorium and a public hearing was requested.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know","date":"2026-08-10","title":"Dove Creek Data Center Has Applied for a TCEQ Permit: Here's What to Know","publisher":"San Angelo LIVE"},{"url":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","date":"2026-08-10","title":"Data Center Permits Detail Proposed Air Quality Footprint","publisher":"Concho Observer"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:46.414Z","updatedAt":"2026-08-28T20:04:42.465Z","location":{"id":"8319a86d-16b7-4adb-8395-1fbbdb3fac81","name":"San Angelo","slug":"san-angelo-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":31.4649685,"lng":-100.4405094,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:23:46.036Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"02396d1c-02ba-412d-9951-f2c903178e93","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","companyId":null,"externalName":"Westline TX Holdings LLC","role":"developer","structureNotes":"Associated with Beacon Data Centers","createdAt":"2026-08-17T20:23:47.174Z","company":null},{"id":"b5fdf947-8045-4803-90b8-c609a515991c","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","companyId":null,"externalName":"Beacon Data Centers","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:23:47.921Z","company":null}],"capacityClaims":[{"id":"76fa64f0-33a9-4349-9928-4f153932f425","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","series":"announced","valueGw":2.409,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know","sourceType":"permit_filing","evidenceTier":"reported","supersedesId":null,"note":"Up to 2,409 MW of on-site gas generation per TCEQ air permit application, supplied exclusively to a co-located data center (off-grid, behind-the-meter). Permitting stage as of Aug 2026.","createdAt":"2026-08-19T00:14:23.281Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[{"id":"660d6e54-a090-49a9-beeb-cf591c746377","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","name":"Dove Creek on-site gas engines","type":"gas","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","evidenceTier":"reported","note":"PSD + GHG-PSD air-permit application filed; MW not disclosed","createdAt":"2026-08-17T20:23:46.797Z"},{"id":"48017a12-9565-4f6e-9b96-33a18033d9a5","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","name":"Dove Creek Technology Campus Power Plant (Westline 2335)","type":"gas","capacityGw":2.409,"lifecycleState":"announced","sourceUrl":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know","evidenceTier":"reported","note":"TCEQ air permit application filed Aug 2026 by Westline TX Holdings LLC (Beacon Data Centers). Banks of reciprocating natural-gas engines with SCR (NOx) and oxidation catalysts (CO/VOC). Permit apps HAP93, 184380, PSDTX1710, GHGPSDTX275. Public-hearing decision pending.","createdAt":"2026-08-19T00:14:23.821Z"}],"facilities":[],"incidents":[],"events":[{"id":"02e368e1-c0de-4ff8-93cd-d88e90370c7d","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"2.409","claimId":"76fa64f0-33a9-4349-9928-4f153932f425","detail":null,"occurredAt":"2026-08-19T00:14:23.592Z","createdAt":"2026-08-19T00:14:23.592Z"},{"id":"65d52cd5-cee3-4eaf-a8b8-43d414bfdd63","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"2.409","claimId":"76fa64f0-33a9-4349-9928-4f153932f425","detail":"reported · permit_filing","occurredAt":"2026-08-19T00:14:23.433Z","createdAt":"2026-08-19T00:14:23.433Z"},{"id":"217dafd4-afc4-43a4-9710-39bc1f402077","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Beacon Data Centers","occurredAt":"2026-08-17T20:23:48.298Z","createdAt":"2026-08-17T20:23:48.298Z"},{"id":"728ee344-e663-4ee5-a950-7412e5c9851b","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Westline TX Holdings LLC","occurredAt":"2026-08-17T20:23:47.536Z","createdAt":"2026-08-17T20:23:47.536Z"}],"capacity_picture":{"announced_gw":2.409,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":2.409,"by_series":{"announced":{"valueGw":2.409,"asOf":"2026-08-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Dove Creek Data Center (Beacon)","url":"https://registry.deploy.report/datacenters/beacon-dove-creek-tom-green-texas","geo":{"@type":"GeoCoordinates","latitude":31.34977,"longitude":-100.63943},"address":{"@type":"PostalAddress","addressLocality":"San Angelo"}}}