{"id":"720c5a47-de2f-4387-bf19-da401da0655e","slug":"bdx-cgk4-ai-data-center-park","name":"BDx CGK4 AI Data Center Park (West Java)","aliases":["BDx CGK4","CGK4 AI Data Center Park","BDx AI Campus 2 CGK4","BDx Jatiluhur AI campus","CGK4 West Java","BDx Purwakarta AI DC","BDx Indonesia CGK4"],"locationId":"ba99183b-814e-4d98-b5d8-a84d1ee9d166","lat":-6.53,"lng":107.38,"locationPrecision":"city","landStatus":null,"lifecycleState":"partially_energized","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"PT PLN (Persero)","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"BDx Indonesia's CGK4 AI data-center park in West Java (a BDx / Indosat / Lintasarta JV), from which Lintasarta runs its Deka GPU / GPU Merdeka service on 8x NVIDIA H100 SXM per server. 500 MW total scalable campus target (announced); Phase 1 completed/operational; power density up to 120 kW/rack. A 30 MVA PLN supply covers the CGK3A + CGK4 portfolio, not CGK4 alone.","keyFacts":[{"label":"Groundbreaking (company-claimed, Sep 2026)","value":"640 MW AI campus in Jatiluhur, West Java; 845 MVA PLN grid capacity; built over about three years."},{"label":"Building 1 (company-claimed)","value":"First of six buildings; 120 MW IT in phases; first contracted phase early 2027."},{"label":"Cooling (company-claimed)","value":"Direct-to-chip liquid cooling for up to 500 kW per rack."},{"label":"Certification and power (company-claimed)","value":"NVIDIA DGX-Ready certified Apr 2025; 5 km from Jatiluhur Dam; hydro deal with PJT planned."},{"label":"Platform (company-claimed)","value":"Part of three Indonesia AI campuses with 1.2 GVA+ grid capacity; $320M loan facility in 2026."},{"label":"Backer","value":"I Squared Capital"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.bdxworld.com/press-release/bdx-data-centers-launches-first-phase-of-500mw-renewable-powered-ai-campus-in-indonesia/","title":"BDx Launches First Phase of 500MW Renewable-Powered AI Campus in Indonesia","sourceName":"BDx Data Centers"},{"url":"https://www.lintasarta.net/en/news/lintasarta-presents-gpu-merdeka-an-advanced-sovereign-ai-cloud-for-indonesia-powered-by-nvidia-ai/","title":"Lintasarta Presents GPU Merdeka, powered by NVIDIA","sourceName":"Lintasarta"},{"url":"https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html","date":"2026-09-22","title":"BDx Breaks Ground on 640MW AI Data Center in West Java, Backed by 845MVA of Secured Grid Power","publisher":"PR Newswire / BDx Data Centers"}],"reviewNote":null,"createdAt":"2026-08-31T01:25:50.541Z","updatedAt":"2026-10-12T23:48:38.107Z","location":{"id":"ba99183b-814e-4d98-b5d8-a84d1ee9d166","name":"Jatiluhur (Purwakarta)","slug":"jatiluhur-indonesia","kind":"city","parentLocationId":"400b6f75-f53f-4949-9d16-2b85b7ffcc90","region":"West Java","lat":-6.53,"lng":107.38,"reviewStatus":"reviewed","aliases":["Jatiluhur, Purwakarta, West Java, Indonesia","Jatiluhur","Purwakarta","West Java"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-28T00:14:47.878Z","updatedAt":"2026-11-02T18:32:15.604Z"},"parties":[{"id":"cb2c660e-d1d1-4505-97eb-9a406498d41c","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","companyId":null,"externalName":"BDx Indonesia","role":"developer","structureNotes":"Colo host/developer (BDx / Indosat / Lintasarta JV).","createdAt":"2026-08-31T01:25:52.167Z","company":null},{"id":"2e962aeb-07ee-4338-a6d8-42d8afb4bd22","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","companyId":"d753b9e3-f5c6-4c5d-a819-b020b1b091de","externalName":null,"role":"operator","structureNotes":"Runs Deka GPU / GPU Merdeka here.","createdAt":"2026-08-31T01:25:52.950Z","company":{"id":"d753b9e3-f5c6-4c5d-a819-b020b1b091de","name":"Lintasarta","slug":"lintasarta"}},{"id":"a1f8cfd1-533f-4eff-99ce-0780e2ed6db1","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","companyId":null,"externalName":"PT PLN (Persero)","role":"grid_operator","structureNotes":"30 MVA PPA across CGK3A + CGK4.","createdAt":"2026-08-31T01:25:53.721Z","company":null},{"id":"ebc5ffc5-28e0-47c0-ba4e-a47d008d8a5b","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","companyId":null,"externalName":"NVIDIA","role":"chip_supplier","structureNotes":"H100 SXM (DGX-Ready).","createdAt":"2026-08-31T01:25:54.574Z","company":null}],"capacityClaims":[{"id":"985a881d-2fda-45bf-b016-3d3d0805dccb","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","series":"announced","valueGw":0.5,"asOf":"2024-07-31T00:00:00.000Z","sourceUrl":"https://www.bdxworld.com/press-release/bdx-data-centers-launches-first-phase-of-500mw-renewable-powered-ai-campus-in-indonesia/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"500 MW total scalable campus target.","createdAt":"2026-08-31T01:25:51.628Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"9acb5a16-b259-44fb-a6c4-6be91a176de6","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: NVIDIA","occurredAt":"2026-08-31T01:25:54.965Z","createdAt":"2026-08-31T01:25:54.965Z"},{"id":"c0f78f0f-a3b0-4c48-b41d-20a3bb6b21d0","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: PT PLN (Persero)","occurredAt":"2026-08-31T01:25:54.189Z","createdAt":"2026-08-31T01:25:54.189Z"},{"id":"9a136529-1f43-4552-acd0-e0314f61e481","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: d753b9e3-f5c6-4c5d-a819-b020b1b091de","occurredAt":"2026-08-31T01:25:53.344Z","createdAt":"2026-08-31T01:25:53.344Z"},{"id":"430aeda8-68cb-453d-a534-be73c9033f14","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: BDx Indonesia","occurredAt":"2026-08-31T01:25:52.568Z","createdAt":"2026-08-31T01:25:52.568Z"},{"id":"b41547f6-81bf-4038-ac9a-d39a931f8a47","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.5","claimId":"985a881d-2fda-45bf-b016-3d3d0805dccb","detail":null,"occurredAt":"2026-08-31T01:25:51.938Z","createdAt":"2026-08-31T01:25:51.938Z"},{"id":"89dd3136-cb23-4b53-b6c8-dd074c345578","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.5","claimId":"985a881d-2fda-45bf-b016-3d3d0805dccb","detail":"reported · journalist_report","occurredAt":"2026-08-31T01:25:51.783Z","createdAt":"2026-08-31T01:25:51.783Z"}],"capacity_picture":{"announced_gw":0.5,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.5,"by_series":{"announced":{"valueGw":0.5,"asOf":"2024-07-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.bdxworld.com/press-release/bdx-data-centers-launches-first-phase-of-500mw-renewable-powered-ai-campus-in-indonesia/"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"BDx CGK4 AI Data Center Park (West Java)","url":"https://registry.deploy.report/datacenters/bdx-cgk4-ai-data-center-park","geo":{"@type":"GeoCoordinates","latitude":-6.53,"longitude":107.38},"address":{"@type":"PostalAddress","addressLocality":"Jatiluhur (Purwakarta)"}}}